N p
[]jfdfff " W Hl1HHE hAWii?ICM'5iCSi!!P?,IId'
- M= M M 2 mm c,2.riin e o 07:4 4m Mr uarv 13, l'H L 50-309/81-001/01T-0 5,i thiteri States t*rlear Pquistory Cmr-Les icn
[
f Directorate of Regulato.y Operatio u o
f g,
Region I 613 Park Avar.se i
h.,/~[NE /S g g.9 Kirg of Ptressia, Perrisylvania 1 % 05 g
- D%
y
Reference:
Licertse No. DPR-35 (Docket No. 50-309)
~
4 m
Deer Sirr Pursuanc to the requirments of Tectnical Specification 5.9.1.6.b, the W= Yankee Atanic Paper CM y hereby suhnits the folicwing report.
1%11owing the Cycle 4/5 refueli outage, a laak test of the Reactor Coolant Systen was perfonned in ac::o e with Technical Specification 4.3.
'Ibe RCS cW= pressure /tenperature relationship for the test was established in
-= with Technical Specification 3.4 Diaring this refueling outage, a reactor vessel wall surveillance capsule was removed and sent to Battelle Coluzir.as Laboratories for n-tafysis as a part of the rer vessel inservice inspection an.
The results of this analysis indicate a vessel wall flueoce approx caly 2.3 times greater than had been predictal.
This higber fluence results in a higher shift of ItrNUr-Utilizing the new fluence values and Regulatory Guide 1.99, Rev.1, April 1977, the resulting minime pressurization temperature (PST) curve indicates that the RCS leak test was performed at a %rature approxistely 273F beim the MPT.
This, by itself, would constitute a violation of the limits established by Technical Specification 3.4.
Ecc.au, the curves in Regulatory Guide 1.99 are generic in nature and have consitierable certservatism built into tbm.
Test results of actual Maine Yartee reactor vessel meerial irradiated in the Naval Research Lal:cratory Progran ed also actual surveillance material frem the Maine Yankee reactor all. shw ItrNUr hifts well below the Regulatory Guide 1.99 values for this s
fluence racge.
By applying the results of the analysis of actual tisine Yankee vessel mearial, the actual shift of Krggyr and the resulcing F#r curve, shcu CC least a 330 ' tcargin tc the a::tual minimum pressurization temperatute.
E 8103100 W s/
i l
thitad Staties Nuclear FTontory resission Febetary 13, 1981 Page ~5so Based on the actual surveiltm unterial amalysis r== ritz, the RCS Imak cost mL,M fallszeirs the CycIm 4/5 refuelirqr outage, was, in fact, corwh=-hrt at the proper pressure /%cature re"aticoships with a considerable margin to the tanperature ifmit. A change to Teclutical Specification 3.4 is pcusently beirs j:reparaf which will incorporate the results of the Battelle analysis and wiL. ensure future MPT limits r-fn conservative.
% truly yours, MmE MKEE AEMIC RMR CDTM s k.nIs {.(4 E&rin C. Wood Plant Manager EDUps e