ML20037B546

From kanterella
Jump to navigation Jump to search
Requests Extension to 740906 to Allow Addl Time to Prepare Thorough Responses to Insp Findings
ML20037B546
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/28/1974
From: Brian Lee
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20037B545 List:
References
NUDOCS 8010170708
Download: ML20037B546 (1)


Text

m~

l Commony.rlth Edtson ^

One First Nati([.. Plaza. Chicago. Rhnois Address Repi to: Past Offic3 Box 767

(

V' Chicago. Illinois 60690 August 28, 1974 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations - Region III U. S. Atomic Energy Connission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Dresden Station Units 1 and 3, AEC Regulatory Operat. ions -Inspection Report, AEC Dkt 50-10 and 50-249

Dear Mr. Keppler:

Your letter dated August 6, 1974, transmitted the subject inspection report and requested reply to the Enforcement Action in the Summary of Findings section of the inspection report within 20 days of receipt.

Your letter was received August 8, 1974 and the reply was scheduled to be completed by August 28, 1974.

This letter confirms a verbal request for an extension to September 6,1974 to allow additional time to prepare thorough responses.

The inspection report has been reviewed for proprietary content and none was identified.

Very truly yours, O

M' G% CLEL 9

Byron Lee, Jr.

Vice-President f

ll 80

. - 2 o y,o 7pg

/H gg f b 'iN W--

f