l Commony.rlth Edtson ^
One First Nati([.. Plaza. Chicago. Rhnois Address Repi to: Past Offic3 Box 767
(
V' Chicago. Illinois 60690 August 28, 1974 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations - Region III U. S. Atomic Energy Connission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Dresden Station Units 1 and 3, AEC Regulatory Operat. ions -Inspection Report, AEC Dkt 50-10 and 50-249
Dear Mr. Keppler:
Your letter dated August 6, 1974, transmitted the subject inspection report and requested reply to the Enforcement Action in the Summary of Findings section of the inspection report within 20 days of receipt.
Your letter was received August 8, 1974 and the reply was scheduled to be completed by August 28, 1974.
This letter confirms a verbal request for an extension to September 6,1974 to allow additional time to prepare thorough responses.
The inspection report has been reviewed for proprietary content and none was identified.
Very truly yours, O
M' G% CLEL 9
Byron Lee, Jr.
Vice-President f
ll 80
. - 2 o y,o 7pg
/H gg f b 'iN W--