ML20037B266

From kanterella
Jump to navigation Jump to search
Notice of Proposed Issuance & Availability of Amend to License DPR-2,incorporating Operating Limits in Tech Specs Per Acceptable Evaluation Model That Conforms w/10CFR50.46 Requirements
ML20037B266
Person / Time
Site: Dresden 
Issue date: 08/25/1975
From: Ziemann D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20037B265 List:
References
NUDOCS 8009100814
Download: ML20037B266 (4)


Text

~

.A i

~

~

p.

' E...

^*7:7

.$?

UNITED STATES NUCLEAR REGULATORY C03311SSION DOCKET 1:0. 50-10 k

CO)D10NWEALTH EDIS0!! COMPA1:Y r.; :_

NOTICE OF PROPOSED ISSUANCE OF A>1ENDMENT TO FACILITY OPERATIUC LICENSE

=:

i Ihe Nuclear Regulatory Commission (the Commission) is considering i

l the issuance of an amendment to Facility Operating License !!o. DPR-2 i

issued to the Ccamonwealth Edison Company (the licensee) for operation

~

~

A

'of the Dresden Nuclear Power $tation Unit 1 (the facility), a boiling i

water reactor located in Grundy County, Illinois, and currently authorized i

for operation at power, levels up to 700 int.

I In accordance. with the licensee's application for a license amend-j

=;

]

nent dated July 31, 1975, the amendment would incorporate operating linits in

+:,

1 the Technical Specifications based upon an evaluation of ECCS performance j

j calculated in accordance with an acceptable evaluation model that con-forns to the requirements of.the Commission's Acceptance Criteria for Energency Core Cooling Systems for Light Water Nuclear Power Reactors l

set forth in 10 CFR Section 50.46.

1

)

=

a 1

i

+-

i i.

.8009100 4d /f-

.--r-,

r


m-,---we.,r-7,e.

r-sw.

~

.-d 1

'I

]

=
-

i l

l Prior to issuance 'of the proposed license amendment, the Commission will have made the findings-required by the Atomic Energy

=

Act of 1954, as amended (the Act), and the Commission's rules and g

-regulations.

.By

'OCT 03 WS the l'icensee may file a request for a

^

hearing and any person whose interest may be affected by this pro-ceeding may file a request for a hearing in the form of a petition for leave to intervene with respect to the issuance of the amendment

}

to the subject f acility pperating license.

Petitions for leave to

=

intervene must be filed under oath or af firmation in accordance with the provisions of Section 2.714 of 10 CFR Part 2 of the Commission's regulations.

A petition for leave to intervene must set forth the in teres t of the petitioner in the proceeding, how that in te t ~+

may be affected by the results of the proceeding, and the petitioner's contentions with respect to the proposed licensing action.

Such

...j

.s petitions must be filed in accordance with the provisions of this FEDERAL REGISTER Notice and Section 2.714, and must be filed with b

^~'

l i

D*

-,~..

.g m

'.fe

-s.

w m

--*-m w

,,.c

+m e-M

%em,e

-2

! the Secretary of the. Commission, U.S. huclear I;egulatory Conrission, l

Washington, D.C.

20555, Attention:

Docketing and service section, n=-

l

==

by the above date.

A copy of the petition and/or request for c

=

hearing should be sent to the Executive Legal Director, U.S. Tuclear I

Legulatory Commission, Washington, D.C.

20555 and to John W.

Powe, Esquire of Ishac, Lincoln & beale, One First Fational Plaza, ChicaF0, Illinois 60670, the attorney for the licensee.

A petition for Icave to intervene rust be acconpanied by c supporting af fidavit which identifies the specific aspect or aspects l

of the proceeding as to which intervention is desired and specifies l

'with particularity the facts on which the petitioner relies at to both his in te re s t and his contentions with regard to cach aspect on which intervention is requested.

Petitions stating contentions

~

l F-l relating only to matters outside the Commission's jurisdiction will be denied.

{

All petitions will be acted upon by the Commission or licensing,

~

1:

t board des'ignated by the Commission or by the Chairman of the Atomic l

t Entery and Licensing Eoard Fenel.

Timely petitions will be considered t'

l to deterninc chether a hearing should be noticed or another n;propriat e ordtr i t.c ue d rrtarding the disposition of the petitions.

C*'*:E+

g,-

4 a r 9-a i a +-

g T.

a i C.? '. 4 < Rev. ?-?.4 ) AIC.! 0:4C 2 w. s. noven%wswt Petwiswa orrects t 4.ge ge DG D

W.

J

d

=

1

-(

']

In the event that a hearing is held and a person is permitted to R

intervene, he becores a party to the proceeding. and has a ri h

ft to participate fully in the conduct of the hearing.

For e:wcric, he may present evidence and examine and cross-examine witnesses.

Fct further details with respect to this action, see the application for avendment dated July 31, 1975, which..is available it for public inspection at the Cornission's Public Document !< aoc,

1717 H St reet, W., k' ash i ng t on, D. C.

20555.

We license crer.drent and the Safety Evaluation, when issued, may be inspected at the above location, end a copy may be obtained upon request addressed to the U.S. l<ucicar F.egulatory Conctission, k'ashington, D.C. 20555, Attention: Director, Division of Feactor Licensing.

Bethesda, Maryland, this N b@C b.

19 I -

Dated at j

FOR THE NUCLEAR FEGULATCf.Y Cole:I5Slul; Original Signed by:.

{

I)ennis L. Ziemann.

a Lennis L. Zierenn, Chief Operating Eeactors Erench (2 Division of Scactor Licer. sing ces es %

s

.4wr*

= + t +-

l lt*N AIC.? ! ? ( Ers. 9 $ 3 ) A10f C2 40 N W. B. GOVERN M E NT PRsNTm 3 OF F:C Et 1974 - 8 89 9 96 h