_
4
/
Bechtel Power Corporation Engineers-Constructors 15740 Shady Grove Road i
Gaithersburg, Marytand 20760 301-948-2700 June 6, 1979 Mr. Olan D. Parr, Chief Light Water Reactors Branch No. S Division of Project Management Nuclear Regulatory Commission Washington, D.C.
20555 Computer Code Verification Information -
Wolf Creek Base Mat Reanalysis File: 258/278.4 Ref:
1.
Report - Reanalysis of the Wolf Creek Reactor Building Base Mat, Bechtel Power Corporation, Gaithersburg, Maryland, 5/9/79 2.
Standardized Nuclear Unit Power Plant System (SNUPPS) Preliminary Safety Analysis Report, Docket No. STN 50-482 3.
BC 'IUP-Sa Prestressed Concrete Nuclear Reactor Containment Structures, February, 1975, Bechtel Power Corpora-tion, San Fransisco, California 4.
KGGE Letter to NRC Dated 6/6/79 (G. L. Koester to 0. D. Parr)
Dear 24r. Parr:
During the review process of the Wolf Creek Base Mat Reanalysis (Reference 1) the Commission requested information on the verification of computer codes used in the reanalysis that were neither referenced in the SNUPPS PSAR (Reference 2) or in BC-TOP-5a (Reference 3).
790611 o psy 4
T Bechtel Power Corporation Mr. O. D. Parr June 6, 1979 The following documents are submitted to satisfy that request:
A.
BSAP Computer Program 1.
Bechtel Structural Analysis Program (BSAP) Verification Report 2.
Bechtel Structural Analysis Program (BSAP) Theoretical Manual, Volumes 1 and 2.
3.
Bechtel Structural Analysis Program (BSAP) User's Manual B.
Miscellaneous Project Developed Programs (These programs were used to convert the output from the BSAP program to reinforcing steel and concrete stresses, and to identify shear tie requirements in the base slab.)
1.
Calculation No. 01-42.01WC-F-Post Processing Programs 2.
Calculation No. 01-42.02WC-F-Time Share Post Processing Programs 3.
Calculation No. 01-42.03WC-F-Steel, Concrete and Required Shear Ties.
In accordance with 10CFR2.790(a)(4) and 10CFR2.790(b)(1) we request that this information be maintained as proprietary to the Bechtel Powcr Corpora-tion. The basis for this request is that these specific programs and associated documentation were develol.ed by the Bechtel Power Corporation solely for its use on Bechtel projects. Thousands of Bechtel manhours were expended in this development effort. The documents represent a substantial investment in valuable tools used by the corporation to maintain its competitive position in an area of one of its major endeavors.
Bechtel considers these materials to be trade secrets as is true with all Bechtel-developed computer program materials.
In addition to the above request, we ask to be immediately notified of requests by third parties for all or any portion of the materials which are hereby submitted. Further, thesc materials are submitted upon the condition that the NRC determine them to be " proprietary" and not subject to disclosure within the meaning of 10CFR2.790.
Very trt y yours, d__
. M. Komes ice President EWF/caf Sworn to before me this 7th day of June, 1979, cc:
G. Koester, w/o y,,[
. h 3 g fgv._
N. A. Petrick, w/
Diane W. Carpenter,/ Notary Public Ny ecm.msn c>g, L, ;, ;;gRg