ML20036C449
| ML20036C449 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/10/1993 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9306170090 | |
| Download: ML20036C449 (3) | |
Text
F s
t JUN 101993 Docket Nos. 50-277 50-278 Mr. D. M. Smith Senior Vice President-Nuclear Philadelphia Electric Company Nuclear Group Headquarters i
Correspondence Control Desk t
P. O. Box 195 Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:
10 CFR 50.54 QUALITY ASSURANCE PROGRAM CHANGE REVIEW
References:
Letter dated March 3,1993, from Mr. G. J. Beck to the U. S. Nuclear Regulatory Commission transmitting a proposed reduction in commitment to the Quality Assurance Program Description incorporated in the Updated Final Safety Analysis Report for the Peach Bottom Atomic Power Station Units 2 and 3 We received your 10 CFR 50.54(a) submittal, referenced above, transmitting a proposed reduction in commitment to the Quality Assurance Program Description (QAPD) incorporated in the Updafd Final Safety Analysis Report (UFSAR) for the Peach Bottom Atomic Power Mtation (PBAPS) Units 2 and 3. However, based on our current review schedul t, it recaired n ore than 60 days to complete our review.
The Regan I staff has reviewed this submittal in accordance with 10 CFR 50.54(a) and determined ihat the proposed changes to the PBAPS Quality Assurance Program Description records storage :ommitments are acceptable in that: (1) the Quality Assurance Program continues to satisfy the criteria of Appendix B of 10 CFR Part 50; and (2) this change will make the re;ords storage commitments for PBAPS consistent with records storage commitmrats for your Limerick Generating Station.
If thero are changes to other operative QA commitments existing in docketed correspondence outside of the QA program description, you are obligated to notify this office. Implementing such ;hanges should be based on 10 CFR 50.54(a)(3). The effectiveness of your Quality Asstrance Program and procedure implementation will continue to be the subject of routine resonal inspections.
OFFICIAL RECORD COPY G:PBQAPDCR.FLB WSBoM o
7 P
1 01
s JUN 101993 Mr. D. M. Smith 2
If you have any questions concerning the above, please contact Fred Bower at (215) 337-5328 or Norm Blumberg at (215) 337-5199.
Sincerely, Odginal Signed Br.
Lee H. Bettenhausen Im H. Bettenhausen, Chief Operations Branch Division of Reactor Safety cc:
J. Doering, Chairman, Nuclear Review Board D. B. Miller, Vice President, Peach Bottom Atomic Power Station G. Rainey, Vice President, Nuclear Services Department G. Cranston, General Manager, Nuclear Engineering Division C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station A. J. Wasong, Manager, Experience Assessment G. A. Hunger, Jr., Manager, Licensing Section J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric B. W. Gorman, Manager, External Affairs R. McLean, Power Plant Siting, Nuclear Evaluations D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania TMI - Alert (TMIA) i 1
OFFICIAL RECORD COPY G:PBAPDCR.FLB
.a JUN 101993 Mr. D. M. Smith 3
bec:
Region 1 Docket Room (with concurrences) bec: (Via E-Mail)
- V. McCree, OEDO Joseph Shea, NRR C. Miller, PDI-2, NRR L. Bettenhausen, DRS N. Blumberg, DRS F. Bower, DRS bec:
V. Curley, DRS DRS Files (2)
RI:DRS RI:DRS RI:DRS Bettenhausen Bower m 1 /g p.
'AV 06/0 93 06/1/93 06/9/93 OFFICIAL RECORD COPY G:PBAPDCR.FLB