ML20036C439
| ML20036C439 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/10/1993 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20036C440 | List: |
| References | |
| NUDOCS 9306170065 | |
| Download: ML20036C439 (3) | |
See also: IR 05000352/1993012
Text
I
l
- -
i
Y & I O 1933
i
.t
i
Docket Nos. 50-352
1
50-353
i
Mr. D. M. Smith
!
Senior Vice President - Nuclear
j
Philadelphia Electric Company
l
Nuclear Group Headquarters
Correspondence Control Desk
!
P. O. Box 195
Wayne, PA 19087-0195
I
Dear Mr. Smith;
i
SUBJECT:
Inspection Nos. 50-352/93-12 and 50-353/93-12
'
This letter refers to the inspection conducted by Ms. Laurie Peluso of this office on May 10-14,
1993, of activities authorized by NRC License Nos. NPF-39 and NPF-85 at the Limerick
,
Generating Station, Units 1 & 2, Limerick, Pennsylvania and to the discussion of our findings
i
held by Ms. Peluso with Mr. J. Doering and other members of your staff at the conclusion of
the inspection. This letter also refers to the telephone discussions held by
Dr. Bores,
,
Ms. Peluso, and Mr. Mallon, of your staff, on June 4,1993.
!
!
Areas examined during this inspection, involving your Radioactive Liquid and Gaseous Effluent
!
Control Programs, are important to public health and safety and are described in the NRC
l
Region I Inspection Report that is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records, interviews with
j
personnel, and independent observations by the inspector.
l
3
Based on this inspection we found that you generally continued to maintain effective effluent'
control programs. However, it appears that one of your activities was not conducted in full
compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith
I
as Appendix A. This violation has been categorized by severity level in accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2,
Appendix C (Enforcement Policy). You are required to respond to this letter and in preparing -
your response, you should follow the instructions in Appendix A. While we recognize that this
violation was identified by you staff, we can not credit you with self-identification because
corrective actions were still not take at the time of this inspection.
.j
!
l
~!
OFFICIAL RECORD COPY
B:9312 LIM
June 10,1993
-l
l
l
9306170065 930610
.
II E"
f"'s A
ga}: ,}
g
ADOCK 05000352
'
G
,
,-
i
s
..
-
_. -
._
. . -
!
!
- -
-
.,
Wi 10 1!!93
Philadelphia Electric Company
2
j
There was another violation identified involving insufficient sampling while certain effluent
j
monitors were out of service. That violation has been categorized as a non-cited violation
- !
because it was promptly identified and corrected by your staff. Response to the non-cited
violation is not required.
,
!
The response directed by this letter and the accompanying Notice are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork Reduction
!
Act of 1980, PL96-511.
Your cooperation with us in this matter is appreciated.
l
l
Sincerely,
Original Signed By:
dWkR.KdWih
t'
j
hames H. Joyner, Chief
l
Facilities Radiological Safety
,
and Safeguards Branch
[
i
Division of Radiation Safety
and Safeguards
'
!
Enclosures:
1. Appendix A, Notice of Violation
]
2. NRC Combined Inspection Report Nos. 50-352/93-12 and 50-353/93-12
l
l
cc w/encis:
l
J. Doering, Chairman, Nuclear Review Board
j
D. R. Helwig, Vice President - Limerick Generating Station
!
G. A. Hunger, Jr., Manager - Licensing Section
i
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
[
Secretary, Nuclear Committee of the Board
Public Document Room (PDR)
i
Local Public Document Room (LPDR)
l
Nuclear Safety Information Center (NSIC)
l
K. Abraham, PAO (2)
_
NRC Resident Inspector
i
Commonwealth of Pennsylvania
,
i
OFFICIAL RECORD COPY
B:9312 LIM
June 10,1993
lf
QO
IC UO
,
- -
.
..
' ' '
!/JN I 0.1993
Philadelphia Electric Company
3
bec w/encis:
.
Region I Docket Room (with concurrences)
bec w/encls: (Via E-Mail)
V. McCree, OEDO
F. Rinaldi, NRR
l
C. Miller, PDI-2, NRR
,
!
,
.
b
i
DR@S:RI
S:RI
I
i
Dd8ne
>f
/
PELUSO
d B R-
JOY Jt
-,
06/0//93
(3/ /9_ ,
06//e/93
l
i
,
OFFICIAL RECORD COPY
ll:9312 LIM
June 10,1993
,
6
g
8
fu$"
d}lJ
^
u
-
1
.
.