"TBFDG/J:
-ID':919-675-5879
- JUN 11.'93 9:56E Nol004 P.02
[Q, '~
}
.} L
-rm 1S[rFR2?461.L
- f....]O Nuclo,u het M,imoxrts Maws.c,:tmts N'
" ^, ?.
ticrcMiwon QumvW r.O k M Wulueesen 1d /!:9?
DHIh/h !M
~93 JUN 11 All :20 y r :.s
. ;,c..v-i m
June 10, 1993
" p / W,. a~
. Secretary of the Commission U.S. Nuclear Regulatory Commission
-Washington, D.C.
20555 Attent. ion :
Docketing Servico
Subject:
Response to Proposed Rule on License Fee Recovery, FR Vol. 58, No. 77, 4/23/93
Reference:
NRC License SNM-1097, Docket 70-1113
Dear Sir:
On April 26, 1993, GE's Nuclear Energy and Components Manufacturing facility in Wilmington, N.C.
received a copy'of the NRC's proposed rule to revise the Fee Schedules in order to achieve 100% fee recovery for the NRC's Fiscal Year 1993..The proposed increase of $26.4 million increases the amount to be recovered from S492.5 million to $518.9 million, an increase of 5.4%.
4 There has been~a move in recent years throughout our industry to re. duce costs'and. improve productivity.
For example, GE while significantly increaring our company wide safety emphasis and improving safety performance has, over the past ten years, reduced employment levels by approximately 25 percent and completed numerous programs directed at controlling-costs and increasing productivity.and effectiveness.
As a result, we have been able to maintain,~and in many cases, reduce the cost of our products.
In light of our recent drive to reduce our costs, it is alarming that every year we see a steady increase in the NRC's' budget with a substantial impact to the individual licensees.
While we understand some of the reasons for the NRC increase ', such as fewer licensees, the impact to us and other licensees is significant.
For example, this year, as a result of removing one licensee from the Low. Enriched Fuel (LE") category, the proposed Annual Fee and' Surcharge increases from S836.5k to $1319.0K, an increase of 57.7%.-
Large fee increases such as this one, have significant impacts on our business planning.
We request that a maximum: annual increase be developed in order to provide licensees with some degree of protection against excessive increases.
0 9306170015 930610
/) '
PDR PR U
170:58FR2163.2 ~PDR
.a
BLDG.73 ID:919-675'5879
~~ JUN~11'93~
i:$7 ~l40.6 J4. P.03l
~
~
1 I
a Secretary of the Commission June 10, 1993 Page 2 i
We are unaware of any defined or published effort within the NRC-i i
to address the objectives of improving productivity and reducing It is our recommendation that the NRC develop a plan to i
costs.
minimize costs, not just allocate them to licensees.
Although the
{
increasing costs appear to impact all U.S.
licensees equally, we are in a global marketplace, and no sensitivity has been allowed by the government regarding the economic impact this type of l
legislation has when competing with foreign low enriched fuel fabricators.
i I
We appreciate the opportunity to respond to the proposed rule for
" Implementing the U.S. Court of Appeals Decision and Revision of Foe Schedules."
If you have any questions concerning our
(
comments, please contact me.
t Sincerely, GE NUCLEAR ENERGY l
Charles M. Vaughan, Manager Regulatory Compliance
/zb
[
cc:
CMV-93-074 t
B 1
4 i
i i
l o
i I
I 1
bLDb. J 1D;919-otD-30/9 JUN 11 93 Y: 30 14 0. U J 4 P UA GENERAL ELECTRIC COMPANY
-WILMINGTON, NC-TRANSMITTAL COVER SHEET _
X TELECOPY RAPIFAX METHOD:
DATE 6/11/93 TO:
SECRETARY OF THE COMMISSION - ATTN:
DOCKETING SERVICE EXT.:
BLDG.:
M/C:
FAX:
(301) 504-16'12___
NO. PAGES ATTACHED:
2 COMMENTS:
SIGNED ORIGINAL TO BE MAILED FROM:
CHARLIE VAUGHAN EXT.:
(919) 675-5656 BLDG.:
M/C:
FAX.:
(919) 6'5-5879 TELECOPY NO. 8*292-5879 VERIFY:
YES (AUTOMATIC)