ML20036C277
| ML20036C277 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/10/1993 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20036C278 | List: |
| References | |
| NUDOCS 9306160024 | |
| Download: ML20036C277 (3) | |
See also: IR 05000352/1993013
Text
b
-.
$]N i0 ih]
Docket Nos.
50-352
50-353
Mr. D. M. Smith
Senior Vice President - Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
Subject:
Combined Inspection Nos. 50-352/93-13 and 50-353/93-13
This letter refers to the inspection conducted by Dr. Richard K. Struckmeyer of this office on
May 12- 24,1993, of activities authorized by NRC License Nos. NPF-39 and NPF-85 at the
Limerick Generating Station Units I and 2, Limerick, Pennsylvania, and Nuclear Group
_
~
Headquarters, Wayne, Pennsylvania. At the conclusion of the inspection, a discussion of our
findings was held by Dr. Struckmeyer with Mr. J. Ballantine and other members of your staff.
Areas examined during this inspection are important to public health and safety and included the
implementation of your radiological environmental monitoring program and meteorological
monitoring program as described in the NRC Region I Inspection Report which is enclosed with
this letter. Within these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the inspector.
l
Within the scope of this inspection, no safety concerns or violations of regulatory requirements
were observed and no reply to this letter is required.
Your cooperation with us in this matter is appreciated.
Sincerely,
)
Original Signed By:
j
,
Chib
N3
,
1$QQ{g
James H. Joyner, Chief
Facilities Radiological Safety
l
and Safeguards Branch
Division of Radiation Safety
I
OFFICIAL RFCORD COPY G: LIM 9313.CIR June 10,1993
I
I
- M~
Q ('h
il
9306160024 930610
.
,
,
d
ADDCK 05000352
.
-
'i
G
,
j
- * --
-
i
P
.
'JU.4 10 1993
,
Philadelphia Electric Cornoany
2
Enclosure:
NRC Region I Combined Inspection Report Nos. 50-352/93-13 and 50-353/93-13
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
D. R. Helwig, Vice President - Limerick Generating Station
G. A. Hunger, Jr., Manager - Licensing Section
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFICIAL RECORD COPY
G: LIM 9313.CIR
June 3,1993
A
h as
n$hb
y
i
UU
.=
F
.
% N 1 0 1993
.
Philadelphia Electric Company
3
bec w/ encl:
Region I Docket Room (with concurrences)
bec w/ encl: (Via E-Mail)
V. McCree, OEDO
F. Rinaldi, NRR
C. Miller, PDI-2, NRR
RI:DRSS
RI:DRSS
RI: -
S
AYB
Struckmeyer/slj
Joy r
06/cy93
06/o193
06/A/93
OFFICIAL RECORD COPY
G: LIM 9313.CIR
June 3,1993
ja -
p
r'
sit
1%
%$
.