ML20036C268

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/93-13,50-336/93-09 & 50-423/93-10 on 930404-0518.No Violations Identified
ML20036C268
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/09/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20036C269 List:
References
NUDOCS 9306160007
Download: ML20036C268 (3)


See also: IR 05000245/1993013

Text

,

4

JUN

9 1993

Docket Nos. 50-245

50-336

50-423

Mr. John F. Opeka

Executive Vice President-Nuclear

Northeast Nuclear Energy Company

P.O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

MILLSTONE COMBINED INSPECTION 50-245/93-13; 50-336/93-09; AND

50-423/93-10

This refers to the safety inspection conducted by Mr. P. Swetland and others of this office on

April 4,1993 through May 18,1993, at Millstone Station in Waterford, Connecticut. The

preliminary findings were discussed with Mr. S. Scace, the Unit Directors, and others of

your staff at the conclusion of the inspection. Areas examined during the inspection are

described in the enclosed report. Within these areas, the inspection focused on issues

important to public health and safety, and consisted of performance observations of ongoing

activities, independent verification of safety system status and design configuration,

,

interviews with personnel, and review of quality records.

During this inspection, we confirmed that the Millstone units we e operated safely. The

forced shutdown of Unit I due to excessive leakage past certain containment isolation valves

underscores the importance of your continued attention to the care and maintenance of

containment boundary valves.

Your cooperation with us is appreciated.

Sincerely,

origins signed By

A. Randolph Blough, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosure: NRC Combined Inspection Report 50-245/93-13; 50-336/93-09; 50-423/93-10

9306160007 930609

eDR

ADOCK 05000245

/<g

p,

i

e

ene

a

,

..

JUN

9 1993

.

Northeast Nuclear

2

Energy Company

ec w/ encl:

W. D. Romberg, Vice President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Station

H. F. Haynes, Nuclear Unit Director, Unit 1

J. S. Keenan, Nuclear Unit Director, Unit 2

F. R. Dacimo, Nuclear Unit Director, Unit 3

R. M. Kacich, Director, Nuclear Licensing

G. H. Bouchard, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reydolds, Esquire

Ernest C. Hadley, Esquire

P. Blanch

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut SLO

i

'

i

.y--,

,,. ,

-

,-e,w--r,

..,%-,

--_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

..

.

JLN

9 1993

.

Northeast Nuclear

3

Energy Company

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA E-MAIL)

J. Stolz, NRR/PD I-4

V. McCree, OEDO

D. Jaffe, PM, NRR

J. Andersen, PM, NRR, Unit 1

G. Vissing, PM, NRR, Unit 2

V. Rooney, PM, NRR, Unit 3

R. Nimitz, DRSS (Section 2.3 and 6.1)

l

l

o

RI:DRP

RI:DRP

\\ RI:DRP

{e3 Swetigd

Doerflein

Elough

cYTIU

a

6/9 /93

6/i/93

6/ 7/93

1

!

OFFICIAL RECORD COPY

G:\\ BRANCH 4\\MS130910. INS

_

_ - _ _ _ _ _ - _ _ _ - - _ _ _ - _ - _ - _ _ _ _ - _ _ _ _ _ _