ML20036C211

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to Seabrook Station Evacuation Time Estimate Study
ML20036C211
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/09/1993
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20036C212 List:
References
NYN-93083, NUDOCS 9306150257
Download: ML20036C211 (2)


Text

-. =

L eab ok NH 03874 Telephone (603)474-9521

=

h

(

Facsimile (603)474-2987 Energy Service Corporation Ted C. Feigenbaum Senior Vice President and Chief Nuclear Officer NYN-93083 June 9,1993 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

References:

(a)

Facility Operating License No. NPF-86; Docket No. 50-443 (b)

New Hampshire Office of Emergency Management Letter, dated June 1,1993, G.L. Iverson to FEM A, Region I

Subject:

Transmittal of Revisions to the Seabrook Station Evacuation Time Estimate Study and the Seabrook Station Evacuation Time Estimate Handbook Gentlemen:

}

By letter dated June 1, 1993, [ Reference (b)], the New Hampshire Office of Emergency Management transmitted the following documents to the Federal Emergency Management Agency:

Revision 4 to the Seabrook Station Evacuation Time Estimate Study; o

Revision 3 to the Seabrook Station Evacuation Time Estimate Handbook.

o Pursuant to the requirements of 10CFR.50.4(b)(5), the aforementioned documents are submitted as Enclosures 1 and 2 to this letter.

The changes contained in these documents, which are denoted by vertical change bars located in the left hand margin, were generated by the following:

p Updated population projections based on 1990 census data; o

Updated surveys of permanent and transient population characteristics; o

Revised planning basis for Massachusetts EPZ communities; o

If you should have any questions regarding the above, please contact Mr. Anthony M.

Callendrello, Licensing Manager, at (603) 474-9521, extension 2751.

Very truly yours, 140054 gg

,h Ted C. Feig nbaum TCF:JBH/act Ecclosures a member of the Northeast Utilities system

'Y l

9306250257 930609 pDR p

ADOCK 05000443 PDR

r United States Nuclear Regulatory Commission June 9,1993 Attention: Document Control Desk Page two t

cc without enclosures:

-i Mr. Thomas T. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 l

f

')

I i

~

i 1

I i

.