j[
'o,,
UNITED STATES g
) #.<
g NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D. C. 20555 a
% '.... /
June 8, 1993 Docket Nos. 50-313 and 50-368 Mr. Jerry W. Yelverton Vice President, Operations AN0 Entergy Operations, Inc.
Route 3 Box 137G Russellville, Arkansas 72801
Dear Mr. Yelverton:
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (ANO-1&2) - RESPONSE TO GENERIC LETTER 92-08, "THERMO-LAG 330-1 FIRE BARRIERS" (TAC NOS. M85514 AND M85515)
By letter dated April 16, 1993, you provided a response to Generic Letter (GL) 92-08 for ANO-l&2.
Your response states that Thermo-Lag fire barrier materials are not utilized in ANO-1.
Your response also states that a small quantity of Thermo-Lag fire barriers installed at ANO-2 were previously believed to be qualified based on your understanding of the NRC guidance in existence at the time of installation and that the fire barrier configurations installed at ANO-2 resemble but do not exactly replicate fire-tested configurations.
Your response also states that deviations from the tested configuration were not performed.
Although Thermo-Lag barriers were evaluated and may have been considered qualified, the results of recent tests and inspections indicate that further actions are now necessary to address fire endurance and ampacity derating of Thermo-Lag barriers.
Your response states that appropriate actions to resolve fire barrier concerns are being developed through an industry program coordinated by NUMARC and that you will apply the results of the industry program, when completed, to the Thermo-Lag 330-1 installations at AN0-2.
Compensatory measures for these inoperable or degraded fire barriers are in place and will remain in place until these barriers can be declared operable.
Your response further states that, based on the current industry testing schedule, your corrective actions are currently scheduled to be completed by June 1, 1994.
In your response to GL 92-08 you indicated that the actions necessary to restore (or confirm) the operability of these barriers will be based on the results of the NUMARC program.
The staff expects that licensees referencing this program will review the test results and, within 30 days of the completion of this test program, inform the NRC of the actions necessary and the schedule for restoring the operability of these fire barriers, including those plant-specific or unique fire barrier configurations that are not bound by the NUMARC program.
In accordance with the reporting requirements of GL 92-08, you are also requested to confirm, in writing, completion of the corrective actions.
9306150227 930600 m:-
UNy V W
PDR ADOCK 05000313 g,a ush 4
I oo u M<
P PDR j
l
i
,g
~
l Mr. Jerry W. Yelverton,
l 1
The information requested by this letter is within the scope of_the overall burden estimate in GL 92-08, which was an average of 300 person-hours for each addressee's response. This request is covered by Office of Management and l
Budget Clearance No. 3150-0011, which expires June 30, 1994.
Sincerely, ORIGINAL SIGNED BY:
Roby B. Bevan, Project Manager
(
Project Directorate IV-1 Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation ORIGINAL SIGNED BY:
Thomas W. Alexion, Project Manager i
Project Directorate IV-1 Division of Reactor Projects - III/IV/V I
Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
Docket File NRC & Local PDRs PD4-1 Reading-R. Bevan E. Adensam T. Chan P. Noonan PD4-1 Plant File T. Alexion 1
A. B. Beach JRoe W. Dean CMcCracken CBerlinger
- See previous concurrence j
OFC LA: PD4.-O l / _
PM:P MkJM:PD4-1 PM:PD3-1 NAME PNoonanJ TAlexion)pY RBevan D '
WDean*
DATE 6 /Q /93
(, /74is3
(*/3/93 5/27/93 l
COPY YESk TES/NO YES/NO YES/NO 0FC BC:SPLBQ4 BC:EELhd D:PD4-1/h NAME CMcCraben CBerlinger Tchan / k DATE 6/4/93 r,/rJ/93
$/h/9'3 COPY kNO
[hNO YES[kb) 0FFICIAL W CORD COPY 4 0cument Name: Alt 85514. l tr l
I l
i 1
1
/
4 Mr. Jerry W. Yelverton -
The information requested by this letter is within the scope of the overall burden estimate in GL 92-08, which was an average of 300 person-hours for each addressee's response. This request is covered by Office of Management and Budget Clearance No. 3150-0011, which expires June 30, 1994.
Sincerely, JW
~
Roby B. Bevan, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation 0;
C
.q l [g,Mj)
G,
' W)Y Thomas W. Alexion, Project,anager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:
See next page d
P P
L
~ _.
- 1..
Mr.~ Jerry W. Yelverton. The information requested 'by this-letter is within the scope of the overall burden estimate in GL'92-08, which was an average of 300 person-hours for each addressee's response. This request is covered by Office'of Management and Budget Clearance No. 3150-0011, which expires June 30, 1994.
Sincerely, ORIGINAL SIGNED BY:
Roby B. Bevan, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation ORIGINAL SIGNED BY:
Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
Docket File-NRC & Local PDRs PD4-1 Reading R. Bevan E.~Adensam T. Chan-P. Noonan PD4-1 Plant File T. Alexion i
A. B.' Beach jl JRoe W. Dean CMcCracken CBerlinger
- See previous concurrence f
0FC LA:PD4/DI4.PM:P M kJM:PD4-1 PM:PD3-1 NAME PNoona'n)
TAlexionk RBevan N WDean*
DATE 8 /4 /93 h /7493 b /3 /93 5/27/93
'l COPY YES/iO3 YES/NO YES/NO YES/NO 0FC BC:SPLB C/)'
BC: EEL 9 h D:PD4-1/7'/
NAME CMcCrabKen CBerlinder Tchan N k r, ' r7 /93
$/k/93 DATE 6/Y/93
/
COPY hNo
[EhNO YES/NO)
]
0FFICIAL TLCORD COPY M ocument Name: AR85514.ltr l
3
e,
,.E
. Mr. Jerry W. Yelverton 9
.Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 & 2.
f cc:
Mr. Donald C. Hintz, President Mr. John R. McGaha-and Chief Executive Officer Vice President, Operations. Support Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 31995-P. O. Box 31995 I
Jackson, Mississippi 39286 Jackson, Mississippi 39286 Mr. Robert B. McGehee Mr. James J.- Fisicaro Wise, Carter, Child & Caraway Director, Licensing P. O.-Box 651 i
Entergy Operations, Inc.
Jackson,-Mississippi 39205 Route 3 Box 137G Russellville, Arkansas 72801 Mr. Charles B. Brinkman, Manager.
Washington Nuclear Operations-Mr. Nicholas S. Reynolds ABB Combustion Engineering Nuclear Power i
Winston & Strawn 12300 Twinbrook Parkway, Suite 330-1 1400 L Street, N.W.
Rockville, Maryland 20852 t
Washington, D.C.
20005-3502 Admiral Kinnaird R. McKee, USN (Ret)
-Mr. Robert B. Borsum 214 South Morris Street:
1 Licensing Representative Oxford, Maryland 21654 B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Nr. Michael B. Sellman Rockville, Maryland 20852 General Manager, Plant Operations i
Entergy Operations, Inc.
Senior' Resident Inspector Route 3, Box 137G i
U.S. Nuclear Regulatory Commission Russellville, Arkansas 72801
?
1 Nuclear Plant Road
' Russellville, Arkansas 72801 Regional Administrator, Region IV -
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Honorable Joe W. Phillips County Judge'of Pope County Pope County Courthouse i
Russellville, Arkansas 72801 l
Ms. Greta Dicus, Director Division of Radiation Control and Emergency Management 1
Arkansas Department of Health 4815 West Markham Street Little Rock, Arkansas-72205-3867 I
I