ENCLOSURE 1 U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING RE0VALIFICATION EXAMINAT10N REPORT REPORT NO.:
50-005/0L-93-02 FACILITY DOCKET N0.:
50-005 FACILITY LICENSE N0.:
R-2 i
FACILITY:
Pennsylvania State University i
EXAMINATION DATES:
January 25-26, 1993 EXAMINER:
War n Eresian (
ief Examiner) l SUBMITTED BY:
o
/x
.2 f f7 arr'n Ires n CF T Examiner Date APPROVED BY:
/36 E[/
JaMei L. Caldielt, Chief Date N n-Power Rea: tor Section perator Licensing Branch ivision of Reactor Controls and Human Factors, NRR
SUMMARY
r The NRC administered requalification examinations to two senior reactor operators and one reactor operator. All operators passed the examination.
l b
i 1
9306150272 930222 hDR ADOCK 05000005 PDR REPORT DETAILS 1.
Examiners:
C Warren Eresian, Chief Examiner 2.
Results:
R0 SRO Total (Pass / Fail)
(Pass / Fail (Pass / Fail)
NRC Grading:
1/0 2/0 3/0 Facility Grading:
N/A N/A N/A 3.
Written Examination:
+
All operators passed the written examinations.
4.
Operating Tests:
All operators passed the operating examinations.
5.
Exit Meeting:
An exit meeting was held on January 27, 1993, and attended by:
Warren J. Eresian, Chief Examiner Terry L. Flinchbaugh, Operations Manager Marcus H. Voth, Facility Director The NRC provided some observations with regard to health physics practices at the facility.