CENTEncon 4
ENERGY s
PERRY NUCLEA'R POWER PLANT Mad Address:
0
- 10 CENTER ROAD PERRY, OHIO 44081 VICE PRESIDENT - NUCLEAR PERRY, OHIO 44081 (216) 259-3737 June 4, 1993 PY-CEI/0 EPA-0181L Nancy Meli Ohio EPA, Northeast District Office Division of Air Pollution Control 2110 E. Aurora Rd.
]
Twinsburg, Ohio 44087 RE: Additional Information for Permit te Operate Reneval Applications for the CEI Perry Plant Auxiliary Boilers t
h
Dear Ms. Heli,
i The following information is being provided in response to questions raised during your inspection of the Perry Plant Auxiliary Boilers on May 27, 1993.
Volume of oil used in 1992 - 274,484 gallons Average percent sulfur content -.175% (This is the average of five analyses:
3/11 - 0.14%, 3/12 - 0.14%, 4/11 - 0.165%, 4/28 - 0.16%,- and 10/23 - 0.27%. )
Justification of 75 million BTU /hr maximum input capacity - The rated input capacity of the boiler is 124 million BTU /hr (based on 881 gal /hr at 7.2 lb/ gal
(
and 19,600 BTU /lb). Because there are fever loads on the boiler than i
originally anticipated, 75 million BTU /hr was established by Perry engineering l
as the input maximum to be used.
Please contact us if you have questions or need additional information.
Sincerely,
// /
ft'Y{f7L+~
Ro/ert A. Stratman
'I RAS:LKB:ss cc: Thomas Rigo, OEFA Columbus NRC Project Manager NRC Resident Inspector Office-NRC Document Control NRC Region III i
)
owmtng cennames Clemonc Doctnc Rummotmp t 0 i
l 9306110212 930604 h
IOM @ f0$0" I
PDR ADOCK 05000440 2
v 1.\\
G PDR g
1
.