ML20036C062
| ML20036C062 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 05/28/1993 |
| From: | Winslow T GENERAL ELECTRIC CO. |
| To: | Adensam E NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML19311B090 | List: |
| References | |
| NUDOCS 9306110080 | |
| Download: ML20036C062 (1) | |
Text
-
~
GE Nuclear Energy l
May 28, 1993 Director Office of Fuel Cycle Safety and Safeguards U.
S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Ms. Eleanor G. Adensam, Acting Branch Chief Licensing Mail Stop 14B20, One White Flint
Dear Ms. Adensam:
Subject:
REQUEST FOR CHANGE IN THE FUNDAMENTAL NUCLEAR MATERIAL CONTROL PLAN
Reference:
NRC License SNM-1097, Docket 70-1113 i
With reference co activities authorized by NRC License SNM-1097 at the GE fuel fobrication plant in Wilmington, North Carolina, GE
(])
submits the attached FNMCP changes pursuant to 10 CFR 70.32 (c),
which do not decrease the effectiveness of the current program.
Pursuant to 10 CFR 2.7 90 (d), GE requests that the attachments to this letter be withheld from public disclosure as they contain information which identifies GE procedures for safeguarding licensed SNM. contains descriptions of the changes identified by section. contains the revised FNMCP pages with changes identified with an asterisk in the right-hand margin.
GE personnel would be pleased to discuss this matter further with you and your staff as you may deem necessary.
Very truly yours, GE NUCLEAR ENERGY
-Ard T.
Preston Winslow, Manager Licensing & Nuclear Materials Management
/sbm Attachment N
fb
\\g/a/
cc:
TPW-93-023 000004 hl 93C61100s0 930528 PDR ADOCK 07009113 C