Requests Addl Info Re Util 920917 Application for Amend to License to Change Plant TS to Implement Revs to 10CFR20
ML20036B390
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/10/1993
From: Hood D
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
TAC-M84529, TAC-M84530, NUDOCS 9305190380
Download: ML20036B390 (4)


Text

' '~

j

%,o v

~ UNITED STATES n

1 g

NUCLEAR REGULATORY COMMISSION 7,

wAssiwoTow. o. c. 20sss i

May 10, 1993

.la i

Docket Nos. 50-424 i

and 50-425 Mr. W. G. Hairston, III Senior Vice President -

-i Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

Dear Mr. Hairston:

SUBJECT:

V0GTLE NUCLEAR GENERATING PLANT,:

(TAC NOS. M84529 AND M84530)

The NRC staff is reviewing your application of Septembe i

4 revisions to 10 CFR Part 20 as published in the r 17, 1992, for license mplement dated May 21,1991).

that responded to our previous requestOur re er 56 FR 23360.

February 26, 1993, i

information.

1 change or additional information for completion of our s for additional r

i Holdup Tanks," to use a multiplier of "10 times" fo

~!

.1.4, " Liquid.

Table 2, Column 2 to 10 CFR Part 20.1001-20.2401 values'of Appendix B, incorporate a multiplier of 10 times, as requested Your response proposed Request 470.3, the NRC staff has determined that our requHowe inappropriate.

Accordingly, you should revise your proposed changes to est was Bases 3/4.11.1.4 to delete the addition of the words "10 ti t

mes."

Our previous Request 470.6 asked that you revise your propo greater than 1000 mrem in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> but less than sed administrative distinguish the controls needed for a High Radiation Area f e range o

requirements for a Very High Radiation Area rom the that TS 6.11.2 conservatively applies access (control meth d10 CFR You responded

~

per hour, including Very High Radiation Areas, an o s that are the requested dose rate range is unnecessary.

mrem adequate with respect to 10 CFR 20.1602. controls i i

rvative or measures" required by 10 CFR 20.1602,by Vogtle's TS a

(

e " additional

)

The High Radiation Area TS provides alternate methodology from t

. 601.

e " locking" t

I '

V - %%

u M"Ttdidhh GUyYY 1

[\\ [y g v n f - ~,

\\

l

\\

sR"18ss 888$g4

~

P

Mr. W. G. Hairston May 10,1993 requirement specified in 10 CFR 20.1601 for areas in which an individual might receive a deep-dose equivalent of 100 mrem in I hour at 30 centimeters from the radiation source. The alternate locking requirement specified by the TS is for 1000 mrem in I hour and above; it is not an " additional measure" relative to 10 CFR 20.1602. We are unable to accept the proposed TS change

}

unless it is limited to less than 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to distinguish it from l

the requirements of 10 CFR 20.1602. Accordingly, we again request that you t

specify a range of greater than 1000 mrem in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> but less than 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Your written response to the enclosure is requested within 45 days of receipt of this letter.

If you have questions regarding the enclosure or are unable to meet the requested response date, contact me at (301) 504-3049.

i This requirement affects fewer than ten respondents, and therefore, it is not j

subject to Office of Management and Budget review under P. L.96-511.

j Sincerely, i

e

/s/

Darl S. Hood, Senior Project Manager l

1 Project Directorate 11-3 l

Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation

~

cc:

i See next page 3

j 4

DISTRIBUTION D.Matthews S.Klementowicz Docket File D. Hood T.Essig i

i NRC/ Local PDRs L. Berry L.Cunningham j

FDII-3 Reading OGC I

S.Varga ACRS (10)

G.Lainas E.Merschoff,RII i

1 i

h PDII-3/Dfd PDII-3/LAh PDll-3/PM PPP f

o m cE b

D. HOOD /[

LddbhH/[

D.MATTHEWSb WE L. BERRY h /l0 /93 5 /6/93

__(/[/93 6 M /93 1

DATE 0FFICIAL RECORD COPY FILE NAME: G:\\V0GTLE\\RFAI20.LTR i

l i

4

e Mr. W. G. Hairston May 10,1993 requirement specified in 10 CFR 20.1601 for areas in which en individual might i

receive a deep-dose equivalent of 100 mrem in I hour at 30 centimeters from the radiation source. The alternate locking requirement specified by the TS is for 1000 mrem in I hour and above; it is not an " additional measure" relative to 10 CFR 20.1602. We are unable to accept the proposed TS change l

unless it is limited to less than 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to distinguish it from the requirements of 10 CFR 20.1602. Accordingly, we again request that you specify a range of greater than 1000 mrem in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> but less than 500 rads in I hour.

l Your written response to the enclosure is requested within 45 days of receipt of this letter.

If you have questions regarding the enclosure or are unable i

to meet the requested response date, contact me at (301) 504-3049.

This requirement affects fewer than ten respondents, and therefore, it is not f

subject to Office of Management and Budget review under P. L.96-511.

Sincerely, i

9L 0

Darl S. Hoo oject Manager Project Directorate 11-3 l

Division of Reactor Projects - I/II i

Office of Nuclear Reactor Regulation

{

CC:

See next page i

l h

t l

l i

i 1

4 i

i

=

Mr. W. G. Hairston, III Georgia Power Company Vogtle Electric Generating Plant CC:

Mr. J. A. Bailey Manager - Licensing Harold Rehefs, Director Georgia Power Company Department of Natural Resources P. O. Box 1295 205 Butler Street, SE. Suite 1252 Birmingham, Alabama 35201 Atlanta, Georgia 30334 Mr. W. B. Shipman Attorney General General Manager, Vogtle Electric Law Department Generating Plant 132 Judicial Buildirig P. O. Box 1600 Atlanta, Georgia 30334 Waynesboro, Georgia 30830 Mr. Alan R. Herdt Regional Administrator, Region II Project Branch #3 U. S. Nuclear Regulatory Comission U. S. Nuclear Regulatory Commission 101 Marietta Street, NW., Suite 2900 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30323 Atlanta, Georgia 30323 Office of Planning and Budget Mr. Dan Smith Room 615B Power Supply Operations 270 Washington Street, SW.

Oglethorpe Power Corporation Atlanta, Georgia 30334 2100 East Exchange Place Tucker, Georgia 30085-1349

~,

Mr. C. K. McCoy Vice President - Nuclear Charles A. Patrizia, Esquire Vogtle Project Paul, Hastings, Janofsky & Walker Georgia Power Company 12th Floor P. O. Box 1295 1050 Connecticut Avenue, NW.

Birmingham, Alabama 35201 Washington, DC 20036 Mr. R. P. Mcdonald Art Domby, Esquire Executive Vice President -

Troutman, Sanders Nuclear Operations Nations Bank Plaza Georgia Power Company Suite 5200 P. O. Box 1295 600 Peachtree Street Birmingham, Alabama 35201 Atlanta, Georgia 30308-2210 Office of the County Consissioner Resident Inspector 2

Burke Count U. S. Nuclear Regulatory Comission Waynesboro,y Cocruission P. O. Box 572 i

Georgia 30830 Waynesboro, Georgia 30830 i