ttachment 1 to VO 93-0102 WOLF CREEK NUCLEAR OPERATING CORPORATION VOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH:

April YEAR:

1993 Docket No.:

50-482 Facility Operating License No.:

NPF-42 Report No.

98 Prepared by:

Merlin G. Williams 3

9305180476 930511 PDR ADOCK 05000482 R

PDR

4 4

, to VO 93-0102

-?

SUMMARY

l I

c The following report highlights the operating experience of Wolf Creek j

Generating Station for the month of April, 1993. -This report is being 1

provided pursuant to Technical Specification 6.9.1.8.

?

f 1.

SUMMARY

OF OPERATING EXPERIENCE t

The unit remained shutdown the entire month of April, 1993 as activities associated with Refuel VI continued. The unit began the month with all fuel t

removed from the core. The plant entered Mode 6, Refueling on April 6 -

i when fuel loading for Cycle VII commenced. Mode 5, Cold Shutdown was f

entered on April 16 and continued through the end of the report period.

-I r

II.

MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES

[

Performed maintenance on

  • B' Centrifugal Charging Pump.

Performed maintenance on

'A' and

'B' Emergency Diesel Generators.

i Performed maintenance on Pressurizer Safety Relief Valves.

i

.j A

i r

l 4

i f

4 t

i Wolf Creek Generating Station l

Monthly Operating Report April 1993 i

Page 1 of 5 i

t

.4-4 a -

a a.o

....w

..n a

sa. ~ - -.

i Atta,chment 1 to WO 93-0102 i

OPERATING DATA REPORT f

DOCKET NO.

50-482 WOLF CREEK GENERATING STATION' l

WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 05-01 COMPLETED BY M. Williams TELEPHONE 316-364-8831 OPERATING STATUS h

1.

Reporting Period:

April. 1993 Gross Hours in Reporting Period:

719 j

i 2.

Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1131~

Design Electrical Rating (MWe-Net):__;'/0 j

3.

Power Level to Which Restricted (If Any)(MWe-Net):

N/A 4.

Reasons for restriction (If Any):

N/A This Month Yr. to Date Cumulative

(

i 5.

Number of Hours Reactor was Critical 0.0 1515.2 52.817.8 l

6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.

Hours Generator on Line 0.0 1511.9 52.163.7 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 I

9.

Gross Thermal Energy Generated (MWH) 0 5.106.186 170.635.321 10.

Gross Electrical Energy Generated (MWH) 0

_J.785.639 59.378.256 11.

Net Electrical Energy Generated (MWH) 0 1.698.426 56.644.555 12.

Reactor Service Factor 0.0 52.6 78.7 i

i 13.

Reactor Availability Factor 0.0 52.6 79.2

{

t I

14.

Unit Service Factor 0.0 52.5 77.7 15.

Unit Availability Factor 0.0

$2.5

'i7.1 q

16.

Unit Capacity Factor (Using MDC) 0.0 52.2 74.6

?

17.

Unit Capacity Factor (Using Design MWe) 0.0 50.4 72.1 18.

Unit Forced Outage Rate 0.0 0.0 6.2 i

l 19.

Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of each):.N/A

]

20.. If Shut Down at End of Report Period Estimated Date of Startup:

May 12. 1993

-l v

Wolf Creek Generating Station j

Monthly Operating Report'

-)

April 1993 Page 2 of 5' l

=

. to WO 93-0102 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 05-01-93 COMPLETED BY M. Williams TELEPHONE 316-364-8831 MONTH April 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

,1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

' 14 0

30 0

15 0

31 N/A 16 0

Volf Creek Generating' Station Monthly Operating Report April 1993 Page 3 of 5

, to WO 93-0102 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

50-482 WOLF CREEK GENERATING STATI0tl WOLF CREEY NUCLEAR OPERATING CORPORATION DATE 05-01-93 COMPLETED BY M. Willia'ms REPORT MONTH Aor11. 1993 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /COtMENTS No Date St SCHEDULED

, (HOURS)

(1)

OR REDUCING POWER (2) 1 930401 S

719 C

4 Continued Refuel VI outage.

l

SUMMARY

The unit remained in a refueling outage throughout the month.

1) REASON: At EQUIPMENT PAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B

MAINTENANCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3.

AUTOMATIC SCRAM D

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report April 1993 Page 4 of 5

u._,

m

.,,a c_

.,a sA m.

m 4

i

Atta.chment'1'to WO 93-0102 l

{

t

\\

l WOLF CREEK NUCLEAR OPERATING CORPORATION i

WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH April, 1993

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating' experiences for this month

[

which required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT fi April 1, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> All fuel removed from the core.

April 6, 1993 1106 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.20833e-4 months <br /> Unit entered Mode 6. Refueling.

{

April 16, 1993 0103 hours0.00119 days <br />0.0286 hours <br />1.703042e-4 weeks <br />3.91915e-5 months <br /> Unit entered Mode 5, Cold Shutdown.

j April 30, 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit in Mode 5.. Cold Shutdown.

j l

'I

'I

t d

i t

I Wolf Creek Gener.tting Station l

Monthly Operating Report-(

April 1993 i

Page 5 of 5

[

-