Monthly Operating Rept for Mar 1993 for Cpses,Unit 1
ML20036B283
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/31/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20036B260 List:
References
NUDOCS 9305180450
Download: ML20036B283 (1)


Text

w n

Att chment to TXX-93209 Pag,e 5 of 9 COM ANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.1 DOCKETNO:

504t5 UNIT:

CPSES 1 DATE.

May 13,1993 COMPLETED BY:

Janet Hughes TELEPHONE:

(617)B97-5331 OPEttATING STATUS 1.

Reporting Period: MARCH 1993 Gross hours in reporting period:

7.M 2.

Currently authorized power level (MW1):

3i11 Max. depend. capacity (MWe-Net): 11 5 Design Electrical Rating (MWe-Net):

11E 3.

Power level to which restricted (if any) (MWe-Ney:

NONE 4.

Reasons for restriction !if any):

TMSMONTH YRTODATE CUMULATPE 744 2,120.4 17.639 5.

Number of hours reactor was critical 0

0 2.258.6 6.

Reactor reserve shutdown hours 744 2.104.8 17.2633 7.

Hours generator on line 0

0 8.

Unit reserve shutdown hours

  • ' ^

O 9.

Gross thermal energy generated (MWH) 816,313 2.250,111 17,885,276 10.

Gross electrical energy generated (MWH) 782,208 2,152,094 16.994,470 l

11.

Net electrical energy generated (MWH) 12.

Reactor Service factor 100.0 982 76.4 100.0 982 86.2

13.. Reactor availability factor 14.

Unit service factor 100.0 97.4 74.8 100.0 97.4 74.8 15.

Unit availability factor 91.4 86.0 64.0 16.

Unit capacity factor (Using MDC) 91.4 86.6 s4.0 17.

Unit capacity factor (Using Design MWe) 0 2.6 73 18.

Unit forced outage rate 19.

Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):

20.

If shutdown at end of report period, estimated date of startup:

21.

Units in test status (prior to commercial operation):

ACH!EVED Commercial Operation 900813 MARCH 1993 REVISION 1 Estimated 9305180450 930514 PDR ADOCK 05000445 R