ML20036B241

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1993 for Monticello Nuclear Generating Plant
ML20036B241
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/30/1993
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9305180337
Download: ML20036B241 (5)


Text

- _ _ _ _ _ _ _ _ _ _ _

0 Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 May 11, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Vashington, DC 20555 i

MONTICELLO NUCLEAR GENERATING PLMIT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April. 1993 l

Attached is the Monthly Operatlng Report for April, 1993 for the Monticello Nuclear Generating Plant.

t lRog4r0 Anderson

/%$

}97L-Director Licensing and Management Issues c:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Anager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment 9305180337 930430 PDR ADDCK 05000263 I

R ppg l./

l

-OPERATING DATA REPORT DOCKET NO.

50-263 DATE 3-93 COMPLETED BY H. H.

Paustian i

TELEPHONE 612/295-5151 1

OPERATING STATUS

] Notes

]

1. Unit Name :

Monticello

]

]

2. Reporting period:

April

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

i 4

~4.

Nameplate Rating (Gross MWe):

569

]

]

5. Design Electrical Rating LNet MWe):

545.4

]

]

6. Maximum Dependable Capacity (Grocs MWe): __564

]

]-

7. Maximum Dependable Capacity (Net MWe):

536

)

]

l

8. If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last i

Report, Give Reasons:

1 i

.9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A I

I i

THIS MONTH YR.-TO-DATE CUMULATIVE i

11. Hours In Reporting Period 719 2879 191400 j
12. Number Of Hours Reactor Was Critical 719.0 1542.0 153526.7 1
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7 t
14. Hours Generator On-Line 719.0 1491.8 150768.0
15. Unit. Reserve Shutdown Hours 0.0 0.0 0.0

~

16. Gross Thermal Energy Generated (MWH)

'1200034 2192557 231585970 j

17. Gross Electrical Energy Generated (16CB) 412956 742270~

78273070

18. Net Electrical Energy Generated (MWH) 398374 707943 74863830 l
19. Unit Service Factor 100.0%

51.8%

78.8%

i

20. Unit Availability Factor 100.0%

51.8%

78.8%

21. Unit Capacity Factor (Using MDC Net) 103.4%

45.9%

73.0%

22. Unit Capacity Factor (Using DER Net) 101.6%

45.1%

71.7%

- 23. Unit Forced Outage Rate 0.0%

3.9%

3.7%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
None
25. If Shut Down At End Of Report Period, Estinated Date Of Startup:N/A i
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

'j I

i i

i

[:1 l

AVERAGE DAILY UNIT POWER LEVEL I

DOCKET NO.

50-263 UNIT -Monticello_

DATE 5-3-93.

-l COMPLETED BY H.

H. Paustian I

TELEPHONE 612/295-5151 MONTH OF April i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-l t

f (MWe-Net)

(MWe-Net).

1 554.

17 555.

l 2

555.

18 552.

l 3

554.

19 554.

4

555, 20 554.

5 554.

21 555.

I 6

554.

22 554.

7 561.

23 555.

8 550.

24 555.

j 9

561.

25 552.

10 550.

26 553.

I 11 553.

27 552.

!i 12 554.

28 555.

13 554.

29 552.

j 14 554.

30 554.

15 554.

-16 555.

F

~ INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

f i

t i

5

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 l

DATE 5-3-93

-l COMPLETED BY H. H.

Pausta.an TELEPHONE 612/295-5151

' MONTH APR l

r f

4-1-93 to Power operation.

4-30-93 i

t I

i 3

i i

1 i

h I

i i

i

-i i

i f

i i

i f

Note: Powc" operation defined as essentially 100% of

~j rateo ower except for weekend load drops for specified surveillance testing.

i

!.I

'I

UNIT SHUrDOUNS AND POVER REDUCTIONS DOCKET NO.

50-263 UNIT NAME 74onticello DATE V5-03

  • COMPLETED BY 71. H. Paustian REPORT MONTH April TELEPHONE [612/295-5151 -

No.

Date Ty(peDuration Reason Method LER System Comp.

Cause & Corrective 1)

(hours)

(2) of No.

Code Code Action to Shutdown (4)

(5)

Prevent Recurrence (3)

None 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License E-e3nination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

_ _ -., _ ~., _ _ _.. _. - _. _... _ _.... _.. _. _.. _..._--. - _.,., _ _,:_--,,, _ - _. _.. -... _... -

-