0 Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 May 11, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Vashington, DC 20555 i
MONTICELLO NUCLEAR GENERATING PLMIT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April. 1993 l
Attached is the Monthly Operatlng Report for April, 1993 for the Monticello Nuclear Generating Plant.
t lRog4r0 Anderson
/%$
}97L-Director Licensing and Management Issues c:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Anager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment 9305180337 930430 PDR ADDCK 05000263 I
R ppg l./
l
-OPERATING DATA REPORT DOCKET NO.
50-263 DATE 3-93 COMPLETED BY H. H.
Paustian i
TELEPHONE 612/295-5151 1
OPERATING STATUS
] Notes
]
- 1. Unit Name :
Monticello
]
]
- 2. Reporting period:
April
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
i 4
~4.
Nameplate Rating (Gross MWe):
569
]
]
- 5. Design Electrical Rating LNet MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Grocs MWe): __564
]
]-
- 7. Maximum Dependable Capacity (Net MWe):
536
)
]
l
- 8. If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last i
Report, Give Reasons:
1 i
.9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A I
I i
THIS MONTH YR.-TO-DATE CUMULATIVE i
- 11. Hours In Reporting Period 719 2879 191400 j
- 12. Number Of Hours Reactor Was Critical 719.0 1542.0 153526.7 1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7 t
- 14. Hours Generator On-Line 719.0 1491.8 150768.0
- 15. Unit. Reserve Shutdown Hours 0.0 0.0 0.0
~
- 16. Gross Thermal Energy Generated (MWH)
'1200034 2192557 231585970 j
- 17. Gross Electrical Energy Generated (16CB) 412956 742270~
78273070
- 18. Net Electrical Energy Generated (MWH) 398374 707943 74863830 l
- 19. Unit Service Factor 100.0%
51.8%
78.8%
i
- 20. Unit Availability Factor 100.0%
51.8%
78.8%
- 21. Unit Capacity Factor (Using MDC Net) 103.4%
45.9%
73.0%
- 22. Unit Capacity Factor (Using DER Net) 101.6%
45.1%
71.7%
- 23. Unit Forced Outage Rate 0.0%
3.9%
3.7%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- None
- 25. If Shut Down At End Of Report Period, Estinated Date Of Startup:N/A i
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
'j I
i i
i
[:1 l
AVERAGE DAILY UNIT POWER LEVEL I
DOCKET NO.
50-263 UNIT -Monticello_
DATE 5-3-93.
-l COMPLETED BY H.
H. Paustian I
TELEPHONE 612/295-5151 MONTH OF April i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-l t
f (MWe-Net)
(MWe-Net).
1 554.
17 555.
l 2
555.
18 552.
l 3
554.
19 554.
4
- 555, 20 554.
5 554.
21 555.
I 6
554.
22 554.
7 561.
23 555.
8 550.
24 555.
j 9
561.
25 552.
10 550.
26 553.
I 11 553.
27 552.
!i 12 554.
28 555.
13 554.
29 552.
j 14 554.
30 554.
15 554.
-16 555.
F
~ INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
f i
t i
5
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 l
DATE 5-3-93
-l COMPLETED BY H. H.
Pausta.an TELEPHONE 612/295-5151
' MONTH APR l
r f
4-1-93 to Power operation.
4-30-93 i
t I
i 3
i i
1 i
h I
i i
i
-i i
i f
i i
i f
Note: Powc" operation defined as essentially 100% of
~j rateo ower except for weekend load drops for specified surveillance testing.
i
!.I
'I
UNIT SHUrDOUNS AND POVER REDUCTIONS DOCKET NO.
50-263 UNIT NAME 74onticello DATE V5-03
- COMPLETED BY 71. H. Paustian REPORT MONTH April TELEPHONE [612/295-5151 -
No.
Date Ty(peDuration Reason Method LER System Comp.
Cause & Corrective 1)
(hours)
(2) of No.
Code Code Action to Shutdown (4)
(5)
Prevent Recurrence (3)
None 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License E-e3nination F-Administrative G-Operational Error (Explain)
H-Other (Explain)