ML20036B238
| ML20036B238 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/30/1993 |
| From: | Ratliff S, Salas P TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9305180332 | |
| Download: ML20036B238 (13) | |
Text
. _..
a 3
HA lennetsee Va!:e) AuNeity, Post Ofhce Box 2000 Decatst. Alanama 35(:09 i
t%y 131993
-i i
l t
U.S.
Nuclear Regulatory Commission i
s ATTN:
Document Control Desk l
Washington, D.C.
20555 l
Gentlemen:
I In the Matter Of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 l
50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT i
FOR THE MONTH OF APRIL 1993
[
In accordance with.the requirements of the BFN Technical Specifications section 6.9.1.3, the Monthly Operating Report for the month of April 1993 is provided in Enclosure 1.
If you have any questions, please telephone me at
[
(205) 729-7566.
.i i
Sincerely,
[
0 l
h Pedro.Salas l
~
Manager of Site Licensing
(
Enclosure I
cc:
See page 2 j
I f-l 9305100332 930430 7
I PDR ADOCK 05000259
/v i
R-pog c
i V
l l
. +-
2 2
i f
U.S.
Nuclear Regulatory Commission MAf 131993 Enclosure cc (Enclosure):
INPO Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 i
Atlanta, Georgia 30389 Regional Administrator U.S. Nuclear Regulatory Commission l
Region II 101 Marietta Street, NW, Suite 2900 i
Atlanta, Georgia 30323 Mr. Frederick J.
Hebdon, Director Project Directorate II-4 i
Division of Reactor Projects I-II Office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.
20555 i
Mr. Ted Martson, Director j
Electric Power Research Institute l
P.
O.
Box 10412 Palo Alto, California 94304-
'[
U.S.
Nuclear Regulatory Commission l
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia. 30323
[
NRC Resident Inspector Browns Ferry Nuclear Plant
[
Route 12, Box 637 Athens,' Alabama 35611 j
Mr. Fred Yost, Director of Research Services, Utility Data Institute, Inc.
t 1700 K Street, NW, Suite 400 l
Washington, D. C. -
20006 j
i I
r l
t I
i
+
m
=
l i
l k
MONTHLY OPERATING REPORT l
BROWNS FERRY NUCLEAR PLANT t
TENNESSEE VALLEY AUTHORITY l
APRIL 1993 DOCKET NUMBERS 50-259, 50-260, AND 50-296 i
LICENSE NUMBERS DPR-33, DPR-52, AND DPR-68 4
i l
'f l
i f
t i
4
.?
i a
i I
't p
)
I i
e
't i
t
-. t I
I l
.~
l j
l l
l OPERATIONAL
SUMMARY
l APRIL 1993 l
I I
t UNIT 1 Unit i remains on administrative hold to resolve various TVA and NRC concerns.
The operating data report reflects the assignment of administrative hold status to unit one effective June 1, 1985.
1 Administrative hold status is considered by TVA to suspend the.
l accrual of reporting period hours, because this unit is i
considered to have a maximum dependable capacity of 0 Mwe.
For this reason, cumulative reporting period hours for the period after June 1, 1985, to present are not considered when l
calculating operating status variables such as cumulative l
capacity factor rate.
These considerations will affect the other 1
operating status reporting variables accordingly.
)
t 4
~
UNIT 2 Unit 2 entered a refueling outage on January 29, 1993.- The
~
estimated unit restart is May 21, 1993 (Startup Mode).
The reporting factors have been rev'. sed to reflect the administrative hold status for Unit 2 from June 1, 1985 until restart for l
cycle 6 (May 24, 1991).
l I
'I UNIT 3 J
i Unit 3 remains on administrative hold to resolve various TVA and NRC concerns.
The operating data report reflects-the assignment
.l of administrative hold status to Unit 3 effective June 1, 1985.
l Administrative hold status is considered by TVA to suspend the accrual of reporting period hours, because this unit is
~
considered to have a maximum ~ dependable capacity of 0 Mwe.
For
_i this reason, cumulative reporting period hours for the period i
after June 1, 1985, to present are not considered when l
calculating operating status variables such as cumulative
(
capacity factor rate.
These considerations will affect the other j
operating status reporting variables-accordingly.
I i
i
[
... ~
.~.
t f
AVERAGE DAILY UNIT POWER LEVEL
?
DOCKET NO:
50-259 UNIT:
One PREPARED BY:
S.
A.
Ratliff
[
TELEPHONE:
f205) 729-2937 i
l f
' MONTH APRIL 1993 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL f
(Mwe-Net)
(Mwe-Net) j
.1 0
17 0
r 2
0 18 0
'I 3
0 19 0
4 0
20 0
5 0
21 0
6 0
22 0
i 7
0 23 0
l
[
8 0
24 0
l f
9 0
25 0
[
r 10 0
26 0
11 0
27 0
l l
12 0
28 0
1 13 0
29 0
.t' 14 0
30 0
i IS O
t i
16 0
[
J.
i f
f a
m 1
l
[
~
I AVERAGE DAILY UNIT POWER LEVEL DOCKET No:
50-259 l
UNIT:
Two PREPARED BY:
S.
A.
Ratliff
.l TELEPHONE:
(2051 729-2937
)
l MONTH APRIL 1993 l;
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(Mwe-Net)
(Mwe-Net) l l
1 0
17 0
j l
2 0
18 0
i 3
0 19 0
t l
4 0
20 0
I 2
5 0
21 0
}
i 6
0 22 0
I 7
0 23 0
B 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
l 12 0
28 0
't 13 0
29 0 ~
i i;
14 0
30 0
[
.j 15 0
1 f
16 0
i l
a i
k I
I t
i
{
i l
i l
i
~
r AVERAGE DAILY UNIT POWER LEVEL
{
l DOCKET NO:
50-259 UNIT:
Three
'l PREPARED BY:
S.
A.
Ratliff l
TELEPHONE:
f205) 729-2937 MONTH APRIL 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)
(MWe-Net) f 1
0 17 0
I 2
0 18 0
t 5
3 0
19 0
[
t 4
0 20 0
t 5
0 21 O
l t
6 0
22 0
.I 7
0 23 0
?
t 8
0 24 0
I e
i 9
0 25 0
i f
l 10 0
26 0
i 11 0
27 0
a
?
12 0
28 O
l r
13 0
29 0
[
k 14 0
30 0
.!.t 15 0
j 16 0'
l a
1 i
t
-i
DOCKET NO:
50-259 UNIT SHUTDOWNS AND POWER REDutil0N5-UNIT NAME:
One PREPARED BY:
_S. A. Ratliff REPORT MONTH:
ArRll 1993 TELEPHONE: 1205) 739 2937 Method of License cause end Corrective Duration shutting Event System Conponent Action to Prevent No.
Date Type' (Hours)
Reason #
Down Reactor' Report No.
Code?
Corie' Recurrence 315 06/01/85 N/A 719 s
4 Adninistrative hold to resolve various TVA and NRC concerns.
7 I
)
- eason:
' Method:
' Exhibit G-Instructions
'F:
Forced R
.5: Scheduled A Eaufpnent Failure (Erplain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual scram Entry sheets for Licensee C-Refueling 3-Automatic scram Event Report (LER) File D Regulatory Restriction 6 Continuation of Existing Outage (NUREG 061)
E-Operator Training and License Examination 5-Reduction F Adninistrative 9-Other G-operational Error (Explain)
- Exhibit !*Same Source M-Other (Emplain) 3
~,.-,.-,----,-,,.---.-----,.,,-r+..
---,,,,-,..,r,--+..n~.n-,.,-,.,-,+
n -
r.,n. -- + - -, - -,,,. -, - - - - -., ~. -
-, +. -, - - -, - -, ~., -, - - - -. ~ - - ~. - ~ - - -. -,.
a DOCKET NO:
50 259 UNif SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
Two PREPARED BY:
S. A. Rattiff_
REPORT MONTH:
APRIL 1993 TELEPHONE: (20$) 739-2937 Method of License Cause and Corrective Durstion Shutting Event System Corponent Action to Prevent No.
Date type' (Mours)
Reason #
Down Reactor' Report No.
Code' Code' Recurrence 1
01/29/93 5
719 C
4 Refueting outage.
I
' Methods
- Exhibit G* Instructions F: Forced Reason:
S: Scheduled.
A-Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or fest 2 Manual Scram Entry sheets for Licensee C Refueling 3-Automatic scram Event Report (LER) File D Regulatory Restriction 4-Continuation of Existing Outage (NUREG 061)
E Operator Training and License Exemination 5 Reduction F Adninistrative 9-Other G operational Error (Explain)
' Exhibit 1 Same source H Other (Explain)
,I
~.m
. m m.
_,-....._,.c...
w.....
,,'+... ~
...s
.,,,..m.
..,--,r.,,,,,,_,..,,-.sm.em
_m.,
..m__,
DOCKET NO:
50-259 UNii SHUTDOWNS AND POWER REDUCflONS UNii NAME:
Three PREPARED BY:
S. A. Rettiff REPORT MONTH:
APRIL 1993 TELEPHONE: (205) 739 2937
' Method of License Cause and Corrective Duration Shutting Event System Ccroonent Action t Prevent No.
Date Type' (Hours)
Reason' Down Reactor' Report No.
Code' Code' Recurrence 315 06/01/P4 N/A 719 5
4 Administrative hold to resolve various TVA and NRC concerns.
'F: Forced
Reason:
" Method:
' Exhibit G-Instructions St Scheduled A Equipnent Failure (Esplein) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram Entry sheets for Licensee C-Refueling 3 Automatic Scram Event Report (LER) File D Regulatory Restriction 4 Continuation of Existing Outage (NUREG 061)
' E operator Training and License Examination 5 Reduction F-Achinist rat i ve -
9-Other G-Operational Error (Explain)
' Exhibit t-Same Source H Other (Explain) u.
__u..___._-;..
~
OPERATING DATA REPORT DOCKET NO.
50-259 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT ONE
- 2. Reporting period: APRIL, 1993
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 0
- 7. Maximum Dependable Capacity (Net MWe): 0
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: NA
- 9. Power Level To which Restricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any: Administrative hold THIS YEAR-TO MONTH DATE CUMULATIVE *
- 11. Hours In Reporting Period 719.0 2879 95743
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997
- 14. Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-2220.0
-9386 53499286
- 19. Unit Service Factor 0.0 0.0 60.9
- 20. Unit Availability. Factor 0.0 0.0 60.9
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 52.8
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 52.8
- 23. Unit Forced Outage Rate.
0.0 0.0 25.6
- 24. Shutdowns Scheduled Dver Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined
- Excludes hours under administrative hold
i t
I OPERATING DATA REPORT i
9 DOCKET NO.
50-260 l
PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 r
L OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT TWO
- 2. Reporting period: APRIL, 1993
- 3. Licensed Thermal Power (MWt): 3293 j
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
[
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable capacity (Net MWe): 1065 8.
If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: NA
- 9. Power Level To which Restricted, If Any (Net MWe): NA i
- 10. Reason For Restrictions, If Any: NA j
I THIS YEAR-TO MONTH DATE CUMULATIVE *
- 11. Hours In Reporting Period 719.0 2879 107430
- 12. Hours Reactor Was Critical 0.0 681 69644
}
- 13. Reactor Reserve Shutdown Hours 0.0 0
14200
- 14. Hours Generator On Line 0.0 680 67552 j
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 1526669 192255321 i
- 17. Gross Electric Generation (MWh) 0.0 501730 63779378
- 18. Net Electric Generation (MWh)
-3979.0 471802 61679553
- 19. Unit Service Factor 0.0 23.6 62.9
- 20. Unit Availability Factor 0.0 23.6 62.9
- 21. Unit Capacity Factor (MDC Net) 0.0 15.4 53.9
- 22. Unit Capacity Factor (DER Net) 0.0 15.4 53.9
- 23. Unit Forced Outage Rate 0.0 0.0 19.6
- 24. Shutdowns Scheduled Over Next 6 Month l
(Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: May 21, 1993 j
t-
- Excludes hours under administrative hold
[
i i
OPERATING DATA REPORT DOCKET NO.
50-296 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT THREE
- 2. Reporting period: APRIL, 1993
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 0
- 7. Maximum Dependable capacity (Net MWe): 0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: NA
- 9. Power Level To which Restricted, If Any (Net NWe): 0
- 10. Reason For Restrictions, If Any: Administrative hold THIS YEAR-TO MONTH DATE CUMULATIVE *
- 11. Hours In Reporting Period 719.0 2879 73055
- 12. Hours Reactor Was Critical 0.0 0
45306
- 13. Reactor Reserve Shutdown Hours 0.0 0
5150
- 14. Hours Generator On Line 0.0 0
44195
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
131868267
- 17. Gross Electric Generation (MWh) 0.0 0
43473760
- 18. Net Electric Generation (MWh)
-1651.0
-8409 41922847
- 19. Unit Service Factor 0.0 0.0 60.5
- 20. Unit Availability Factor 0.0 0.0 60.5
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 54.2
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 54.2
- 23. Unit Forced Outage Rate 0.0 0.0 21.6
- 24. Shutdowns Scheduled over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup To be determined
- Excludes hours under administrative hold i
l
... 1