ML20036B234

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/93-05 & 50-366/93-05 on 930314-0410 & NOV
ML20036B234
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/03/1993
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20036B235 List:
References
NUDOCS 9305180329
Download: ML20036B234 (3)


See also: IR 05000321/1993005

Text

-

-

_

- - - - - - --

.

..

.,

MAY 0 31993

Docket Nos. 50-321 and 50-366

License Nos. DPR-57 and NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston III

Senior Vice President-

Nuclear Operations

P.O. Box 1295

Birmingham, AL 35201

l

1

Gentlemen:

I

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/93-05 AND 50-366/93-05)

This refers to the inspection conducted by L. Wert of this office on March 14

- April 10, 1993. The inspection included a review of activities authorized

for your Hatch facility. At the conclusion of the inspection, the findings

were discussed with those members of your staff identified in the enclosed

report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Hotice of

'

Violation (Notice).

You are required to_ respond to this letter and should follow the instructions

specified in the enclosed Notice when preparia your response.

In your

response, you should document the specific act ;ons taken and any additional

j

actions you plan to prevent recurrence. After reviewing your response to this

l

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

I

9305180329 930503

PDR- ADOCK 05000321

['

-

f

.G

PDR

_

.

.

,

..

,

MAY n 31993

L

Georgia Power Company

2

l-

l

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGIN AL 0~~ * O SY

ALAN R. E

H

'

Alan R. Herdt, Chief

Reactor Projects Branch

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

l

2.

NRC Inspection Report

cc w/encls:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

J. T. Beckham

Vice President, Plant Hatch

Georgia Power Company

l

P. O. Box 1295

j

Birmingham, AL 35201

I

H. L. Sumner

j

General Manager, Plant Hatch

j

Georgia Power Company

l

Route 1, Box 439

!

Baxley, GA 31513

'

S. J. Bethay

Manager Licensing - Hatch

Georgia Power Company

P.. O. Box 1295

Birmingham, AL 35201

Ernest L. Blake, Esq.

Shaw, Pittman, Potts and

Trowbridge

2300 N Street, NW

Washington, D. C.

20037

l

l_

cc w/encls:

(Continued page 3)

!

\\

!

-

-

-

_

.

.

.

.

r

i

'.

.

MAY 0 31993

Georgia Power Company

3

cc w/encls: Continued

Charles H. Badger

Office of Planning and Budget

'

Room 610

270 Washington Street, SW

Atlanta, GA 30334

,

Harold Rehets, Director

'

Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

,

f

Thomas Hill, Manager

'

Radioactive Materials Program

Department of Natural Resources

4244 International Parkway

Suite 114

Atlanta, GA 30354

Chairman

Appling County Commissioners

County Courthouse

Baxley, GA 31513

Dan H. Smith

Vice President

Power Supply Operations

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker, GA 30085-1349

t

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

12th Floor

1050 Connecticut Avenue, NW

Washington, U. C.

20036

bcc w/encls:

K. N. Jabbour, NRR

A. R. Herdt, RII

P. H. Skinner, RII

S. J. Vias, RII

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

,

j

Route 1, Box 725

RII:DRP

RIL >

Baxley, GA 31513

TAP

/,)

DSeymour

P

nner

FILE: G:\\DRP\\HT305RPT.DAS

q/g/93

p"/yg/93

_________j

-

-