ML20036B211
| ML20036B211 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 05/11/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20036B212 | List: |
| References | |
| NUDOCS 9305180306 | |
| Download: ML20036B211 (1) | |
Text
- >- s n i ~
- Wy.
- l;SoQ f a
- .
- c
.V
. GE Nuchst Energy i
~
c,wwwic twyam 175 Cum. et. Avenue.. Sv Jose, rA 9E125 ^
May 11,1993 Docket No. STN 52-001
-T S
. Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Review Schedule - TS 33.8.1 and 33.8.2 3
Dear Chet:
t Enclosed are drafts of Technical Specification: 33.8.1, " Loss of Power (LOP) Instrumentation.
Ind 33.8.2," Vital AC Electric Power Monitoring".
t Please provide copies of this transmittal to Jim Stewart and Jim Lazevnick.
Sincerely, cM ek Fox Advanced Reactor Programs f
cc-Bob Strong (GE)
Cal Tang (GE)
Norman Fletcher (DOE) t
- t 170042 1
i
?
s t
i JfB145.
i l.
f P
@l 9305180306 930511
=PDR., ADOCK.05200001-PDR- '
'e/
A