ML20036B210

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1993 for Davis-Besse Nuclear Power Station Unit 1
ML20036B210
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/1993
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20036B201 List:
References
NUDOCS 9305180303
Download: ML20036B210 (1)


Text

-

4 i

OPERATING DATA REPORT l

i DOCKET NO.

50-346 j

DATE - April 8.

1993 l

COMPLETED BY Bilal Sarsour 1ELEP110NE mom 1-7384 i

OPERATING STATUS i

Davis-Besse #1 Notes l

1. Unit N,ame:

March 1993

2. Reporting Period:

j 2772 j

3. Licensed Thermal Power (Mht):

925

4. Nameplate Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

j 921 877

7. Maximum Dependable Capacity (Net MWe):

{

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
l

.i

)

9. Power Lesel To Which Restricted,if Any(Net MWe):
10. Reasons For Restrictions.lf Anv-I ii i

This Month Yr.-to Date Cumulatise 744.0 2,160.0 128,593

11. Hours in Reporting Period
12. Number Of Hours Reactor has Critical 1.5 1.419.5 76.354.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 5,532.0
14. Hours Generator On-Line 2.9 1.418.9 74.194.3
15. Unit Reserve Shutdown Hours 0.0 0.0 1,732.5 l
16. Gross Thermal Energy Generated (MWH) 3,326 3.392,928 184,072,051

.l l

17 Gross Electrical Energy Generated (MWH) 857.0 1.149,632 61,081,945 l

18. Net Electrical Energy Generated (MWH) 0.0 1,087,527 57,530,500

}

19. Unit Senice Factor 0.4 65.7 57.7 l
20. Unit Availability Factor 0.4 65.7 59.0 l
21. Unit Capacity Factor (Using MDC Net) 0.0 57.4 51.0 0.0 55.6 49.4
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 0.0 22.6
24. Shutdowns Scheduled Orcr Next ti Months (T pe, Date, and Duration of E.ach t:

i 3

(

1 I

25. If Shut Down At End Of Leport Period Estimated Date of Startup:

May 1, 1993

26. Units in Test Status (Prior 1o Commercial Operation 3:

Forecast Achiesed INI11 A L CRITICA LITY

\\

INITIA L ELECTRICITY COMMERCI A L OPER ATION 9305180303 930512 PDR ADOCK 05000346 R

PDR

-PU _<.1

. -