Text
i A
B ALTIMORE GAS AND ELECTRIC CALVERT CLIFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PARKWAY
- LUSBY, MARYLAND 20657 4702 i
CHARLES H CRUSE PLANT GENERAL MANAGER I
CALVERT CLIFFS May 12,1993 U. S. Nuclear Regulatory Commission Washington,DC 20555 i
i ATTENTION:
Document Control Desk t
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50-317 & 50-318 April 1993 Oncratine Data Reports j
i Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
i Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
l Very truly yours, l -
l
/
_,,yI/g,/j' 42$
CHC/FP/bjd
/
Attachments I
cc:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC -
R. I. McLean, DNR l
J. H. Walter, PSC R. A. Hartfield, NRC i
P. Lewis, INPO l
K. Larson, ANI 180004
/
I 9305180186 930430 PDR ADOCK 05000317 R
co**************************************************************************
UMIT 1 OPERATING DATA REPORT oo**************************************************************************
Docket No. 50-317 May 12, 1993 Prepared by Frank Piazza Telephone: (410)260-3821 OPERATING STATUS 1.
UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD APRIL 1993
- 3. LICENSED THERMAL POWER (MWT) 2700 l
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845 i
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A i
Cumulative
- This monthYear-to-Date to Date t
- 11. HOURS IN REPORTING PERIOD 719 2,879 157,620 l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,879.0 111,229.0 t
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
[
- 14. HOURS GENERATOR ON LINE 719.0 2,879.0 108,857.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,922,364 7,742,392 275,021,243
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 648,980 2,611,781 91,439,315 i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 624,054 2,510,294 86,979,680
- 19. UNIT SERVICE FACTOR 100.0 100.0 69.1
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 69.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 105.2 105.7 66.9
- 22. UNIT CAPACITY FACTOR.(USING DER NET) 102.7 103.2 65.3
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 9.0
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Maintenance, October 1,
- Time change
[
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A j
i i
l 1
UNIT SIIUT1X)WNS AND POWER REDUCrlONS
~
DOCKET NO.
50-317 UNIT NAME Calvert Clirrs-UI DATE May 12.1993
' COMPLETED BY Frank Piana TELEPHONE (410) 260-3821 REPORT MONTil &nril1993 MIIIIIOD OF SilUTT1NG LICENSEE CAUSE & CORRECI1VE DURAT10N DOWN EVENT SYST11M COMPONENT ACTION 'IU (IIOURS)
REASON 2 REACIVR3 REPORT #
CODED CODiis PREVENT RECURRENCE NO.
DATE-TYPEI
'There were no significant power reductions this month.
i i
1 i
F l
4 1 F: Forced 2 Reason:
3 Method:
+ ~
A-Equipment Failurc 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram.
C-Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D-Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Imad.
~ F-Administrative.
9 - Other G - Operational Error II - Other
+*4-49"Y_ _T'4W FW -b + g44mrm y w wg*v4qmsp.
w-gg=
V
yW- @ p W 59-p qq-h ec y'w p*,
- 1prw1 weW $ y g wg-1WWggw avg (eg i e y$$
TeW gg g -'m'e-,14 Twtw e-4
&-er-w gy i-9 pm m w-We yg g wi pq w 3 -
se-g rv 7 maygy g-g-,
,,q'P"tt'"w" pun"W'~w-tt***'EPTTWPMF=p"1P*wW-"t*W'swa--se-97w wTFwMP~-'-9-P*--ey-M.re'9'1wSP M %aW'-wN'M" i
.t.
AVERAGE DAILY UNIT POWER LEVEL oo********************************+*************************************
Docket No. 50-317 i
Calvert Cliffs Unit No. 1 May 12, 1993 Prepared by Frank Piazza Telephone: (410) 260-3821 APRIL 1993 1
b Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net)
(
1 881 17 876 i
2 880 18 876
[
3 801 19 862 i
l 4
805 20 855 f
5 877 21 869 6
880 22 868 7
879 23 872 8
865 24 833 I
l 9
860 25 871 l
t 10 876 26 872 11 878 27 871 l
t 12 878 28 871 13 877 29 870 14 876 30 870 15 877 16 876 I
i I
i i
i 1
i
)
.~
i i
i DOCKET NO. 50 317 l
CALVERT CLIFFS-UNIT 1 i
May 12,1993 l
SUMMARY
OFOPERATING EXPERIENCE i
April 1993 e
He unit began the month at 100% (875 MWe).
j Power reduction commenced at 0014 on April 3 to repair #12 Heater Drain Tsnk Normal Imel Control Valve and to clean condenser waterboxes. Power variations were mr.de with the lowest power level being 89% occurring at 0130. The power was agam restorea to 1007c at 0225 on April 5.
Because of difficulty in maintaining proper differential temperature across the condenser, power was l
a reduced at 0230 on April 8 for cleaning 13A Waterbox. Due to further problems maintaining proper differential temperature,13A Waterbox was restored to service and power was returned to 100%
j (875 MWe) at 0335. At 2200, power reduction commenced to remove vegetation debris from the -
inlet strainer valve. The power was restored to 1007c at 0620 on April 9.
Power was decreased to repair a tube leak in 11B Condenser Waterbox and was again restored to 100% at 1700 on April 20.
r i
Commencing at 0330 on April 24, power was reduced for maintenance on 13B Amertap and 11 i
Heater Drain Pump Normal Inci Control Valve. Power was restored at 1700 to 100% power.
{
The unit finished the month at 100% (870 MWe).
t l
l h
j I
.I
-l 4
E I
t I'
j May 7, 1993 REFUELING INFORMATION REQUESI Calvert Cliffs Nuclear Power Plant, Unit No.1.
1.
Name of facility:
March 5, 1994.
Scheduled date for next refueling shutdown:
2.
Scheduled date for restart following refueling:
3.
None identified at this time.
Will refueling or resumption of operation thereafter require a Technical 4.
Specification change or other license amendment?
None identified at this time.
Scheduled date(s) for submitting proposed licensing action and 5.
supporting information.
December 1993 for UIC12.
Important licensing considerations associated with the refueling.
6.
None identified at this time.
The number of fuel assemblies (a) in the core and (b) in the spent fuel 7.
storage pool.
(a) 217.
(b) 1627.
Spent fuel pools are common to Units 1 and 2.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been 8.
requested or is planned, in number of fuel assemblies.
(a) 4710. (NOTE 1)
(b)
O.
The projected date of the last refueling that can be dis 9.
space for one full core off-load.
March 2014 4710 total licensed site storage capacity.
NOTE 1:
(1830 pool + 2880 IsrsI)
UNIT 2 OPERATING DATA REPORT Docket No. 50-318 May 12, 1993 Prepared by Frank Piazza Telephone: (410)260-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2 i
- 2. REPORTING PERIOD APRIL 1993 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A i
- 10. REASONS FOR RESTRICTIONS N/A L
r Cumulative
- This monthYear-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 719 2,879 140,975 l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,203.6 101,168.0
[
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 0.0 1,201.7 99,783.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 3,222,124 254,366,916 l
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 1,072,647 84,031,425
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,028,672 80,297,101 l
- 19. UNIT SERVICE FACTOR O.0 41.7 70.8 l
- 20. UNIT AVAILABILITY FACTOR 0.0 41.7 70.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 43.3 69.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 42.3 67.4
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 5.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- Time change i
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
?
- Tune 4, 1993 i
1
2 U
3 1
8 2
4 s
3 a 8 e
8 9
T 9
1 i
9 n 3 g
9 f
l 1
a C
i b
a 1
A t
N u
t
- 2. P 5
3 2
E O
0 0
8 r
1 k
E C
g 8
8 1
e
)
3 l
y n 0 V
N i
d d
v a
a 1
n 0
a r
4 1
5CMFf E
r r
I l
C R
e a
a u
d d
EOR f
n n
RT U a
a e
RNC R
t t
S S
OE E YE OOE d
NMTBN CI R e
E E
T n
TAADO
&CT n
E E
a E
E A N lp I
I ENDeH i
E S
KT iP CI eE U
V r
4 5
O N LL A
E o
f D U PE C
R n
P MT wo O
d t
C u
h m
s it
.a n
mr d
c a
U aS o
rccd L Sied t
S T
laamiu au e l
N nc N
E5 uu r
d nn ot e
O Nl!
A oaa nd h t
T OD
/
uoet I
P O N
hMMACRO C
t MC e
U O
M1 23459 D
39 C
E 9
3 R
M4 1
l EE A
R i
r TD
/
E p
SO N
W A
Y C S
O l
P iT n
D N
E o
ETT i
N O
S NR a
t A
N E O A
i n M
E VP N
m
/
S N
T C EE a
I W
R L
R x
O O
E P
e D
2 s
E 1
3 n
T R
0G R
e U
N D
NO i
c l
I WT nL 0*I I
1 T O C o
S 1 I 1
l D A s
i&
t T
t 1sl E
ee c
ig r
I N
MS R
rT i i n
o r
u t
r l
r si U
iu e n r
a ieE Fe Rav l 2
ri N
c t
a O
n n yT tan r
r S
ea gor o
t A
C m
int osi n
el at i t R
- ipt el ana r E
uri r e nu n uif gemeh oqa e e pd pt N) sEMRROA OO a
OS e
R I
T 0
RABCDEFGI I
A U 9
RO 1
2 7
l Ul D(
IE PY S
T d
i 0
le l
2 du l
2 ed A
0 ce D
3 rh 9
oc FS FS 1
O 0
N 3
I 9
i 4
AVERAGE DAILY UNIT POWER LEVEL oo**********************************************************************
Docket 'Jo.
50-318 Calvert Cliffs Unit No. 2 May 12,1993 Prepared by Frank Piazza Telephone: (410) 260-3821 APRIL 1993 i
Average Daily Pouer Level Average Daily Power Level
)
Day (MWerNet)
Day (MWe-Net) 1 0
17 0
I 2
0 18 0
3 0
19 0
4 0
20 0
I 5
0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
b r
i r
DOCKET NO.50-318 CALVERT CLIFFS-UNIT 2 i
May 12,1993
SUMMARY
OF OPERATING EXPERIENCE April 1993 i
i The unit remained shutdown for a Refueling Outage with the core off-loaded The following significant work was completed.
- Saltwater header work ongoing.
- Completed S/G Eddy current testing and plugging.
- A leak in the RWT was weld-repaired.
4 i
f t
f 9
1 4
a May 7, 1993 REFUELING INFORMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: Currently in Refueling /Next Refueling, March 1995.
3.
Scheduled date for restart following refueling: June 4, 1993/ unknown.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No/ unknown.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
None required / unknown.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a)
O.
(b) 1627.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (NOTE 1)
(b)
O.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2016.
NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 IsrsI) t