Sou:nern Nxtear 0;mra:#ng Company Post OSce Bom 1295 Birmingham. Alabama 35201 Telephone 205 668 5086 A
Southern Nuclear Operating Company
, 0. m.,,,,,
ll,TelN$,'
U* 5 "*'am etecnic sistem May 11,1993 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant Unit I and 2 Monthly Operatina Data Report s Attached are the April 1993 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, N
f' h L d N J\\
J. D. Woodard FMJ:scj04-4351 Attachments cc: Mr. S. D. Ebneter Mr. T. A. Reed Mr. G. F. Maxwell
-9305170293 930430
'PDR ADOCK'0500034G.
I g
R pyg
l 3
.. t bc: Mr. W. G. Hairston, Ill Mr. R. D. Hill (G9.03 & A4.05)
Mr. J. R. Derieux 4
Mr.'J. M. Elliott
-l Mr. D. J. Shelton l
Mr. R. G. Cocherell Mr. O. Batum Mr. C. L. Whatley l
Mr. D. W. Glass Mr. R. E. Huffman Mr. Clem Eicheldinger Mr. M. G. McCorkle i
Mr. John Hoffman Mr. Russ Dedrickson Hr. Fred Yost Mr. F. M. Jessup, III INPO Records Center ANI Library Commitment Tracking System (2 copies)
File: A2.1 Document Control (I copy)
{
t I
r
'i i
a I
1 L
{
h
[
b
OPERATING DATA REPORT i
i DOCKET NO.
50-348 DATE May 5.1993 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS s
- 1. Unit Name:
Joseoh M. Farley - Unit 1 Notes
- 2. Reporting Period:
April 1993
- 1) Cumulative data since i
- 3. Licensed Thermal Power (MWt):
2.652 12-1-77, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
855.7
- 7. Maximum Dependable Capacity (Net MWe):
812.0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons for Restrictions, If Any:
N/A i
This Month Yr-to-Date Cumulative i
- 11. Hours In Reporting Period 719.0 2.879.0 135.119.0
- 12. Number Of Hours Reactor Was Critical 719.0 2.661.6 105.782.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3.650.0 14 Hours Generator On-Line 719.0 2.641.9 104.025.6 i
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.905.594.6 6.902.990.3 266.904.066.1
- 17. Gross Electrical Energy Generated (MWH) 617.280.0 2.237.992.0 86.004.794.0
- 18. Net Electrical Energy Generated (MWH) 586.360.0 2.117,696.0 81.183.946.0
- 19. Unit Service Factor 100.0 91.8 77.0
- 20. Unit Availability Factor 100.0 91.8 77.0
- 21. Unit Capacity Factor (Using MDC Net) 100.4 90.6 73.7
- 22. Unit Capacity Factor (Using DER Net) 98.4 88.7 72.5
- 23. Unit Forced Outage Rate 0.0 8.2 6.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 DATARPT.U1 l
~
l t
DOCKET NO.
50-348 UNIT 1
l DATE May 5. 1993 i
COMPLETED BY R. D. Hill u
TELEPHONE (205) 899-5156
[.
l 1
1 I
MONTH April 5
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l 1
817 17 818 l
2 819 18 818 3
820 19 817 l
l 4
784 20 815 l
5 816
.21 815 i
6 820 22 818 t
i 7
819 23 819 l
8 817 24 817 9
814 25 812 l
l l
10 816 26 809 l
11 800 27 816 12 815 28 816 l
13 812 29 817 l
14 815 30 814 15 811 31 N/A 1
l-16 818 1
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
p l
~.
i JOSEPH M. FARLEY NUCLEAR PLANT l
UNIT 1 1
NARRATIVE
SUMMARY
OF OPERATIONS l
April 1993 l
1 There were no unit shutdowns or major power reductions during the month of April.
l The following major safety related maintenance was performed during the month:
1.
Performed miscellaneous corrective and preventive maintenance on the diesel generators.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCCETWO.
50-349 UNIT MAME:
J. M. Farfey - Unit 1 DATE May 5.1993 COMPLETED BY R D. Mit REPORT MONTH: Aprit.
TELEPHONE (2051 899 5156.
P METHOD OF UCENSEE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO.
DATE TYPE' (HOURS)
REASON' DOWN REACTOR' REPORT #
CODE
- CODE
- PREVENT RECURRENCE Thore were no unit shutdowns or major power reductions during the month of April.
I 1:
2:
3.
4:
5:
. F: Forced Reason:
Method:
Exhibit G-Instructions for.
Dhibi' I - Same Source S: Scheduled A Equipment Failure (bplain) 1 - Manual Preparations for Data Entry B Maintenance or Test 2 Manual Scram.
Sheets for Licensee Event C - Refueling -
3-Automatic Scram.
Report (LER) Fi!e (NUREG4161) -
D - Regulatory Restriction 4 - Other (bplain)
E Operator Training & Ucensing Examination F-Administrative G - Operational Error (Explain) -
H - Other (Splain)
~.. - - -.
- -.,. ---- -_._-.,.., -. ~.., - -...... _........... -.. _ _... _.. _.. - _ _.,,..
OPERATINn DATA REPORT DOCKET NO.
50-364 i
DATE May 5. 1993
[
COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS l
- 1. Unit Name:
Joseph M. Farley - Unit 2 Notes
- 2. Reporting Period:
April 1993
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2.652 7-30-81, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
863.6 e
7 Maximum Dependable Capacity (Net MWe):
822.0 i
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative i
- 11. Hours In Reporting Period 719.0 2.879.0 103.032.0
- 12. Humber Of Hours Reactor Was Critical 719.0 2.820.0 88.841.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 719.0 2.625.0 87.541.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.885.890.2 6.815.583.7 223.346.531.5 i
- 17. Gross Electrical Energy Generated (MWH) 620.266.0 2.241.760.0 73.253.938.0
- 18. Het Electrical Energy Generated (MWH) 590.866.0 2.127.784.0 69.466.982.0
- 19. Unit Service Factor 100.0 91.2 85.0
- 20. Unit Availability Factor 100.0 91.2 85.0
- 21. Unit Capacity Factor (Using MDC Net) 100.0 89.9 82.3
- 22. Unit Capacity Factor (Using DER Net) 99.1 89.2 81.3
- 23. Unit Forced Outage Rate 0.0 8.8 4.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina/ Maintenance Outaae September 24. 1993 Approximately 60 days
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CPITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 DATARPT.U2
DOCKET N0.
50-364 UNIT 2-DATE May 5. 1993 COMPLETED BY R. D. Hill l
TELEPHONE (205) 899-5156 l
MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-l (MWe-Net)
(MWe-Net)
{
l 824 17 818 2
827 18 809 3
828 19 824 4
790 20 822 5
822 21 822 f
I 6
824 22 827 7
823 23 827 i
8 820 24 823 l
I 9
818 25 818 10 823 26 818 11 823 27 825 12 821 28 823 i
13 820 29 822 14 819 30 820 I
i 15 817 31 N/A 16 825 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
{
i AVGDLY.PWR i
,i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 I
NARRATIVE
SUMMARY
OF OPERATIONS April 1993 There were no unit shutdowns or major power reductions during the month of April.
The following major safety-related maintenance was performed during the month:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
l i
3 I
il l
UNIT SHIRDOWNS AND POWER REDUCTIONS GCCKETMO.
50-364 UNtT NAME J. M. Fadev Unit 2 DATE May 5.1993 COMPLETED BY R D. Hi!!
_Acril_
TELEPHONE (205) 899-5150 REPORT MONTH:
i METHOD OF LICENSEE CAUSE & CORRECTIVE DURATON SHUTTING EVENT SYSTEM COMPONENT ACTON TO NO.
DATE TYPE' (HOURS)
REASON' DOWN REACTOR' REPORT #
CODE
- CODE
- PREVENT RECURRENCE There were no unit shutdowns or major power reductions during the month of April i
i 1:
2.
3:
- 4; S:
F: Forced Reason:
Method.
Exhibit G-Instructions for Exhibit 1 - Same Source j
S: Scheduled A e Equipment Failure (Explain) 1 - Manual Preparations for Datt Entry B - Maintenance of Test 2 - Manual Scram.
Sheets for Licensee Event l
C - Refueling Automatic Scram.
Report (LER) File (NUREG4161)
D - Regulatory Restriction -
4 Other (Esplain) j E Operator Training & Licensing Examination i
F Administrative G - Operations! Error (Explain)
H - Other (Explain) i I
__.m__w__--___-_m,-----r+--.-ww-e--w-ce.-*w w w.v w -
m..
--v4eed--ww e--w.,w
-e*
.--+-ewe,'-==e m v
= w,vu'w_.-.-
ww e-
=---w,-'.-,we==w
==m.-eurr.-W.e-
+--
.ww+
-1+--.d4w--'.
w.--a% vee.-..ww-
-m..
-