ML20036A929

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to TS Change Request 222,deleting Requirement to Place Plant in Cold Shutdown Conditions When One ECCS Train Inoperable for More than 72 H & Requiring Placement in Hot Shutdown If Condition Exists
ML20036A929
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/12/1993
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20036A930 List:
References
C311-93-2057, NUDOCS 9305170276
Download: ML20036A929 (1)


Text

.

s.

P GPU Nuclear Corporation hhlhhf F

-v Route 441 South (d

.U g

P.O. Box 480 Middletown, Pennsylvania 17057-0480 i

(717)944-7621 Writer's Direct Dial Number:

(717) 948-8005 1

May 12, 1993 I

C311-93-2057 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50, Docket No. 50-289 Technical Specification Change Request No. 222, Revision 1 In accordance with 10 CFR 50.4 (b) (1), enclosed is Technical Specification Change Request No. 222, Rev 1.

This revision is being submitted to resolve NRC comments.

Also enclosed is one signed copy of the Certificate of Service for this request which confirms service to the chief executives of the township and county in which the facility is located, as well as the designated representative of the Commonwealth of Pennsylvania.

The proposed amendment deletes the requirement to place the plant in COLD SHUTDOWN condition when one ECCS train is inoperable for more that 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and establishes the requirements for the plant to be placed in H0T SHUTDOWN when this condition exists.

Sincerely, h

T. G. Bro 'hton Vice President and Director, TMI-l DW.RKlemf

Enclosures:

1) Technical Specification Change Request No. 222, Rev. 1 i

eo y,g 7g

2) Certificate of Service for Technical Specification Change i

g Request No. 222, Rev. 1 l

l reo RQ cc: Region I Administrator fr.{

THI-l Senior Project Manager J

$m TMI Senior Resident Inspector

$$n.

GPU Nuclear Corporation is a subsidiary of General Pubhc Utihties Corporation

-