ML20036A801
| ML20036A801 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 04/30/1993 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Skolds J SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20036A802 | List: |
| References | |
| NUDOCS 9305170013 | |
| Download: ML20036A801 (3) | |
See also: IR 05000395/1993007
Text
1;
4
,
I
APR 301993
.
l
[
Docket No.: 50-395
i
License No.: NPF-12
South Carolina Electric & Gas Company
-
ATTN: Mr. John L. Skolds
Vice President, Nuclear Operations
Virgil C. Sumer Nuclear Station
-
P.O. Box 88
'
Jenkinsville, SC 29056
Gentlemen:
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (NRC INSPECTION
REPORT NO. 50-395/93-07)
The NRC Systematic Assessment of Licensee Performance (5 ALP) has been completed
for your Virgil C. Sumer facility. The facility's performance was evaluated for
the period September 1,1991, through February 27, 1993, in the functional areas
'
of Plant Operations, Radiological Controls, Maintenance / Surveillance, Emergency
>
Preparedness, Security, Engineering / Technical Support, and Safety Assessment /
Quality Verification.
The results of the evaluation are documented in the
enclosed Initial SALP Report which will be discussed with you at a public meeting
,
to be held at the V. C. Sumer facility on May 12, 1993, at 10:00 a.m.
,
Overall, the performance of V. C. Sumer was excellent. The attainment of SALP
Category 1 in the majority of the SALP functional areas in successive SALP
periods is comendable.
It is indicative of organizational teamwork, staff
competency, and proactive management involvement.
However, I have noted a
declining trend in performance in the Maintenance / Surveillance area which should
receive your attention.
Any coments you have concerning our evaluation of performance of your
V. C. Summer facility should be submitted to this office within 30 days following
the date of the public meeting.
These coments will be considered in the
i
development of the Final SALP Report. Your comments, if any, and a sumary of
the meeting will be issued with the Final SALP Report.
'
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Stewart D. Ebneter
Regional Administrator
Enclosure:
,
'
Initial SALP Report
l
9305170013 930430
,
ADOCK 05000395
t
G
\\
'
ZEW
r
,
. *
.
Ed)R 3" 1493
South Carolina Electric &
2
Gas Company
cc w/ encl:
R. J. White
Nuclear Coordinator
S.C. Public Service Authority
Virgil C. Summer Nuclear Station
P. O. Box 88 (Mail Code 802)
Jenkinsville, SC 29065
G. J. Taylor, General Manager
Nuclear Plant Operations
South Carolina Electric & Gas Co.
Virgil C. Summer Nuclear Station
P. O. Box 88 (Mail Code 300)
Jenkinsville, SC 29065
J. B. Knotts, Jr., Esq.
Winston and Strawn
1400 L Street, NW
Washington, D. C.
20005-3502
Chairman
-
'
Fairfield County Council
P. O. Drawer 60
Winnsboro, SC 29180
Heyward G. Shealy, Chief
Bureau of Radiological Health
. C. Department of Health
'
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Mr. R. H. Fowlkes, Manager
Nuclear Licensing and Operating Experience
South Carolina Electric & Gas Company
Virgil C. Summer Nuclear Station
P. O. Box 88
Jenkinsville, SC 29065
INP0
700 Galleria Parkway
Atlanta, GA 30339-5957
,
.
.
,
-
APR 301993
South Carolina Electric &
3
t
Gas Company
i
bcc w/ encl:
,
I
G. F. Wunder, NRR
F. Cantrell, RII
S. Vias, RII
.
!
Document Control Desk
,
NRC Resident Inspector
'
U.S. Nuclear Regulatory Commission
Route I, Box 64
Jenkinsville, SC 29065
j
The Chairman
l
K. C. Rogers, Commissioner
J. R. Curtiss, Commissioner
F. J. Remick, Commissioner
,
E. G. de Planque, Commissioner
J. M. Taylor, EDO
H. L. Thompson, Jr., EDO
L. R. Plisco, Regional
Coordinator, ED0
,
T. E. Murley, NRR
,
S. Varga, NRR
G. Lainas, NRR
J. Mitchell, NRR
!
F. Allenspach, SALP Coordinator, NRR
'
Regional Administrators, RI, RIII
RIV, and RV
r
!
K. Clark, RII, PA0
D. M. Verrelli, DRP, RII
M. V. Sinkule, DRP, RII
A. R. Herdt, DRP, RII
-
NRC Resident Inspector
DRS and DRSS Branch Chiefs,
i
and Section Chiefs
Document Control Desk
i
RII:DRP
RII:DFP
RII:DRP
RII:0RP
RI,I:DRP
RIJ
sS[ f)
I
DVe elli
Jbhnson
PS o.r
^
Rrgt
FCa rell
04/n/93
04/j]/93
04/jy/93
04/t / 3
04/3 /93
04/2j/93
,
'
N
J111:
I
RII:DRS,
NR
\\ b'
Mg[I( 449
'
.
,
AGibson,
GW
Gla1Ws
e,
04/{Q93
04/2 7/93
04/x9/93
0Q f93
.
!
- '
I
-.
w
-
v-
T