ML20036A582

From kanterella
Jump to navigation Jump to search
Revises Requested Date of 930423 Exigent Amend Request (Proposed Change 118 to Ts),Removing Requirements Associated W/Eccs Area Coolers.Requests Approval by 930522 Instead of 930510 to Support Pressure Testing
ML20036A582
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/07/1993
From: Horn G
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NSD930588, NUDOCS 9305120162
Download: ML20036A582 (2)


Text

.

e j

GENERAL OFFICE Q[ N

""$1 P O BOX 499. COLUMBUS. NEBRASKA 68002-0499 Ld TELEPHONE (402) sG4-8561 xe La Nebraska Public Power Distn. t c

ru m susssi 3 %hd NSD930588 May 7, 1993 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

Subject:

Exigent Amendment Request to Technical Specifications Cooper Nuclear Station NRC Docket 50-298, DPR-46

Reference:

Letter from G. R. Horn (NPPD) to USNRC Document Control Desk dated April 23,1993, " Exigent Amendment Request, Proposed Change No. 118 to Technical Specifications, Removal of Requirements Acsociated with the ECCS Area Coolers" Gentlemen:

In the reference, the Nebraska Public Power District (District) requested a change to the Cooper Nuclear Station (CNS) Technical Specifications that was classified as exigent in nature. The District had determined that the proposed Technical Specification changes were required to be implemented prior to the performance of the ASME Class I pressure testing, scheduled during the present CNS refueling outage. The District requested NRC approval of the exigent change prior to May 10, 1993, which was the scheduled date for performance of the pressure testing at the time the reference was submitted.

Since the submittal of the referenced exigent amendment request, the scheduled date for performance of the ASME Class 1 pressure test has been modified.

The ASME Class I pressure test is now scheduled to take place on May 22, 1993.

Accordingly, approval of the exigent amendment request transmitted by the reference is now requested by May 22, 1993, instead of May 10, 1993, as given in the reference, to support this pressure testing during our present refueling outage.

Should you have any questions or require any additional information, please contact me.

Sin #erel.'

a\\

L~~~-

Nu' ele). Horn G.( R ar Power Group Manager f

/d =

110005

((I I0 9305120162 930507 PDR ADDCK 05000298 P

PDR mww www -wmmw-w wcwnvn w- --mww wmm wnmw Iddet E I-3

' N -

~

hMM[MM) -

'i u

wn

=

u

- = -a

_====

_ =. _..

j '.

1 NSD930588 I

Page'2 of 2 l

cc:

~H. R. Borchert Department of Health j.

State of Nebraska i-NRC Regional Administrator l'

Region IV Arlington, TX i

i NRC Resident Inspector Cooper Nuclear Station i

l-l i

i Ii i

4 1

1 l

1.

I i

i l

t i

4 l

1 N

/