Text
L 1
9 p2 000 f
jo UNITED STATES g
NUCLE AR REGULATORY COMMISSION a
n E
WASHINGTON, D. C. 20555
- e May 4, 1993 Docket Nos. 50-321 and 50-366 Mr. W. G. Hairston, III Senior Vice President -
Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201
Dear Mr. Hairston:
SUBJECT:
LIQUID PENETRANT INSPECTION OF THE FEEDWATER N0ZZLES - HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M84784 AND M84785)
By [[letter::HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..|letter dated October 19, 1992]], you proposed to change the schedule that you had adopted for the liquid penetrant (PT) examinations and ultrasonic tests (UT).
This schedule is contained in Section 4.3.2, Table 2, of NUREG-0619 "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking." The PT examinations are currently scheduled to be performed during the spring 1993 refueling outage for Unit I and the spring 1994 refueling outage for Unit 2.
Also, by NRC 930125 RAI on NUREG-0619 Insp Requirements,As Modified by GL 81-11.Rept Withheld,Per 10CFR2.790|letter dated February 22, 1993]], you provided responses to the NRC staff request for additional information dated January 25, 1993.
Furthermore, by letter dated February _2,1993, you limited your original request, at this time, to a schedule change for the PT examinations for one cycle for both Units 1 and 2.
The NRC staff has reviewed your revised request and is providing its findings in the enclosed safety evaluation (SE). The staff has concluded that a one cycle schedular relief from performing the PT is acceptable, provided you perform an enhanced automated UT at each unit during its forthcoming refueling outage.
If a flaw indication is detected that is interpreted to be a crack, then the PT examination must be performed. Moreover, the UT examination results should be provided in accordance with the schedule outlined in the enclosed SE.
Based on a discussion with your staff, a meeting is scheduled for May 12, 1993, in Rockville, Maryland, to discuss the results of your spring 1993 inspection at Unit 1.
.i 9305110302 930504 i
PDR ADOCK 05000321
@ FOI p
PDR g
L -
Mr. W. G. Hairston, III May 4, 1993 If you have any questions regarding this matter, please contact me at (301) 504-1496.
Sincerely, ORIGINAL SIGNED BY:
l Kahtan N. Jabbour, Project Manager.
Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page DISTRIBUTION:
DMatthews Docket File.
KJabbour NRC & Local PDRs LBerry PDII-3 R/F OGC, 15B18 SVarga ACRS (10), P-135 Glainas EMerschoff, RII MHum, 7D4 JStrosnider, 7D4
/
OFFIE PDII-3/LA /PDII-3/PM BC:EMCBN-D:P[h((
Dhbews.
L.BERRYf/
df J.
KJabbour NE-Strosni r
t
[/ /93 I/f/93 3
(/J/93
(/3 /93 DME 0FFICIAL RECORD COPY
/
FILE NAME: G:\\ HATCH \\ HAT 84784.LTR
y
- t,
+
- t Mr. W.-G.-Hairston, III i
Georgia Power Company Edwin 1. Hatch Nuclear Plant i
.cc:
i Mr. Ernest L. Blake, Jr.
Mr. R. P. Mcdonald.
}
Shaw, Pittman, Potts and Trowbridge Executive Vice President -
2300-N Street, NW.
Nuclear Operations Washington, DC 20037 Georgia Power Company j
P. O. Box 1295
't Mr. J. T. Beckham Birmingham, Alabama 35201 Vice President - Plant Hatch Georgia Power Company Mr. Alan R. Herdt, Chief' i
P. O. Box 1295 Project Branch #3-Birmingham, Alabama 35201_
U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 t
Mr. S. J. Bethay Atlanta, Georgia 30323-l Manager Licensing - Hatch 3
Georgia Power Company Mr. Dan Smith P. O. Box 1295 Power Supply Operations
[
Birmingham, Alabama 35201 Oglethorpe Power Corporation 2100 East-Exchange Place
.i Mr. L. Sumner.
Tucker, Georgia-30085-1349 General Manager, Nuclear Plant
[
Georgia Power Company Charles A. Patrizia, Esquire -
Route 1. Box 439 Paul, Hastings Janofsky & Walker Baxley, Georgia' 31513 12th Floor 1050 Connecticut Avenue, NW.
~
Resident Inspector Washington, DC '20036-U. S. Nuclear Regulatory Commission j
Route 1, Box 725 i
'Baxley, Georgia 31513 g {
Regional Administrator, Region II
{
U. S. Nuclear Regulatory Commission 101 Marietta Street,'NW. Suite 2900 Atlanta, Georgia 30323 j
I Mr. Charles H. Badger Office ~of Planning and Budget l
Room 610 q
270 Washington Street, SW.
j Atlanta, Georgia.30334 j
Harold Reheis, Director Department.of Natural-Resources l
- 205 Butler Street,- SE., Suite 1252 Atlanta, Georgia 30334 j:
Chairman
.Appling County Commissioners I
County Courthouse Baxley, Georgia 31513 1