Text
m
e
CD
'
i
'
?
l
l
,
MAY
41993
t
i
Docket Nos. 50-334
50-412
Mr. J. D. Sieber
l
Senior Vice President
'
Nuclear Power Division
Duquesne Light Company
Post Office Box 4
Shippingport, Pennsylvania 15077
Dear Mr. Sieber:
l
SUBJECT: COMBINED INSPECTION REPORT NOS. 50-334/93-05 AND 50-412/93-05
This refers to the safety inspection of maintenance activities conducted by Mr. F. L. Bower
l
of this office from March 29 - April 2,1993, at Beaver Valley Power Station Units 1 and 2,
l
Shippingport, Pennsylvania, of activities authorized by NRC License Nos. DPR-66 and NPF-
l
73 and to the discussions of our findings held by Mr. F. L. Bower of this office and
Mr. D. Spoerry of your staff at the conclusion of the inspection.
Areas important to the health and safety of the public that were examined during this
inspection are described in the NRC Region I Inspection Report enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations by the inspector.
An adequate system of administrative controls has been satisfactorily implemented for
,
planning and performance of maintenance work. The control of troubleshooting activities by
'
Maintenance has been improved since the implementation of new administrative controls for
these activities in 1991. There are administrative controls in place for troubleshooting
performed by Operations; however, the control and documentation of troubleshooting under
the control of Operations could be improved. Receipt inspection activities were in
conformance with the related administrative controls; staffing was adequate to support the
daily receipt inspection workload; there was no receipt inspection backlog; and, no safety
concerns were identified in this area. Apparent procedural conflicts were identified that
could allow the unwarranted waiving of quality control holdpoints.
!
Within the scope of this inspection, no significant concerns affecting public health and safety,
nor any violations of NRC requirements were observed.
.
OFFICIAL RECORD COPY
A:BV9305.FLB
l
jjSI1
35 '93
G:BV9305.FLB
ADCK0500hh34
G
f O\\
\\i
\\\\
l
.
l-
i
Duquesne Light Company
2
NAY
4 1993
l
No reply to this letter is required. Your cooperation with us in this matter is appreciated.
Sincerely,
,
Criginal Signed By:
1.ee H. Bel.ied LWi
lee H. Bettenhausen, Chief
Operations Branch
,
Division of Reactor Safety
Enclosure: NRC Region I Combined Inspection Report
Nos. 50-334/93-05 and 50-412/93-05
cc w/ encl:
G. S. Thomas, Vice President, Nuclear Services
D. E. Spoerry, Vice President, Nuclear Operations
L. R. Freeland, General Manager, Nuclear Operations Unit
i
!
K. D. Grada, Manager, Quality Services Unit
l
N. R. Tonet, Manager, Nuc' ear Safety Department
I
l
H. R. Caldwell, General Superintendent, Nuclear Operations
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
l
NRC Resident Inspector
!
Commonwealth of Pennsylvania
State of Ohio
!
,
I
.
i
MM
41993
Duquesne Light Company
3
bec w/ encl:
Region I Docket Room (with concurrences)
SRI, Perry, Region III
bec w/enci(VIA E-MAIL):
W. Butler, NRR
G. Edison, NRR
V. McCree, OEDO
L. Bettenhausen, DRS
W. Ruland, DRS/EB SALP Coordinator
i
R. Temps, DRS SALP Coordinator
)
R. Fuhrmeister, ORA
N. Blumberg, DRS
F. Bower, DRS
J. Caruso, DRS
.
)
DRS File
l
RI:DRS
RI:DRS
RI:DRS
RI:DRS
Bower /dmg
Caruso
Blumberg
Bet ,,nhausen
(i(/ Afd
fL
(f{$}Aff)
-
04 ' 93
04t+193
04f/193
N/@3
,
OFFICIAL RECORD COPY
A:BV9305.FLB
G:BV9305.FLB
i