Forwards Safety Insp Repts 50-334/93-05 & 50-412/93-05 on 930329-0402.No Significant Concerns or Violations Noted. Adequate Sys of Administrative Controls Satisfactorily Implemented
ML20036A367
Person / Time
Site: Beaver Valley
Issue date: 05/04/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20036A368 List:
References
NUDOCS 9305110135
Download: ML20036A367 (3)


See also: IR 05000334/1993005

Text

m

e

CD

'

i

'

?

l

l

,

MAY

41993

t

i

Docket Nos. 50-334

50-412

Mr. J. D. Sieber

l

Senior Vice President

'

Nuclear Power Division

Duquesne Light Company

Post Office Box 4

Shippingport, Pennsylvania 15077

Dear Mr. Sieber:

l

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-334/93-05 AND 50-412/93-05

This refers to the safety inspection of maintenance activities conducted by Mr. F. L. Bower

l

of this office from March 29 - April 2,1993, at Beaver Valley Power Station Units 1 and 2,

l

Shippingport, Pennsylvania, of activities authorized by NRC License Nos. DPR-66 and NPF-

l

73 and to the discussions of our findings held by Mr. F. L. Bower of this office and

Mr. D. Spoerry of your staff at the conclusion of the inspection.

Areas important to the health and safety of the public that were examined during this

inspection are described in the NRC Region I Inspection Report enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by the inspector.

An adequate system of administrative controls has been satisfactorily implemented for

,

planning and performance of maintenance work. The control of troubleshooting activities by

'

Maintenance has been improved since the implementation of new administrative controls for

these activities in 1991. There are administrative controls in place for troubleshooting

performed by Operations; however, the control and documentation of troubleshooting under

the control of Operations could be improved. Receipt inspection activities were in

conformance with the related administrative controls; staffing was adequate to support the

daily receipt inspection workload; there was no receipt inspection backlog; and, no safety

concerns were identified in this area. Apparent procedural conflicts were identified that

could allow the unwarranted waiving of quality control holdpoints.

!

Within the scope of this inspection, no significant concerns affecting public health and safety,

nor any violations of NRC requirements were observed.

.

OFFICIAL RECORD COPY

A:BV9305.FLB

l

jjSI1

35 '93

G:BV9305.FLB

ADCK0500hh34

G

f O\\

PDR

\\i

\\\\

l

.

l-

i

Duquesne Light Company

2

NAY

4 1993

l

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely,

,

Criginal Signed By:

1.ee H. Bel.ied LWi

lee H. Bettenhausen, Chief

Operations Branch

,

Division of Reactor Safety

Enclosure: NRC Region I Combined Inspection Report

Nos. 50-334/93-05 and 50-412/93-05

cc w/ encl:

G. S. Thomas, Vice President, Nuclear Services

D. E. Spoerry, Vice President, Nuclear Operations

L. R. Freeland, General Manager, Nuclear Operations Unit

i

!

K. D. Grada, Manager, Quality Services Unit

l

N. R. Tonet, Manager, Nuc' ear Safety Department

I

l

H. R. Caldwell, General Superintendent, Nuclear Operations

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

l

NRC Resident Inspector

!

Commonwealth of Pennsylvania

State of Ohio

!

,

I

.

i

MM

41993

Duquesne Light Company

3

bec w/ encl:

Region I Docket Room (with concurrences)

SRI, Perry, Region III

bec w/enci(VIA E-MAIL):

W. Butler, NRR

G. Edison, NRR

V. McCree, OEDO

L. Bettenhausen, DRS

W. Ruland, DRS/EB SALP Coordinator

i

R. Temps, DRS SALP Coordinator

)

R. Fuhrmeister, ORA

N. Blumberg, DRS

F. Bower, DRS

J. Caruso, DRS

.

)

DRS File

l

RI:DRS

RI:DRS

RI:DRS

RI:DRS

Bower /dmg

Caruso

Blumberg

Bet ,,nhausen

(i(/ Afd

fL

(f{$}Aff)

-

04 ' 93

04t+193

04f/193

N/@3

,

OFFICIAL RECORD COPY

A:BV9305.FLB

G:BV9305.FLB

i