ML20036A241

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1993 for Beaver Valley Power Station
ML20036A241
Person / Time
Site: Beaver Valley
Issue date: 04/30/1993
From: David Jones, Spoerry D
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9305100317
Download: ML20036A241 (9)


Text

{{#Wiki_filter:I 'l b;.. .4 ~ Telephone (412) 393400 .O. x4 -i Shippmgport, PA 15077-0004 -l' May 7,1993 s Beaver Valley Power Station. Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 ' . Gentlemen: In accordance with Appendix A, Technical. Specifications, the J Monthly - Operating Report is submitted for Unit 1 and. Unit - 2 ' for. the month '. off April,1993 Respectfully, b D. E. Spoerry Division Vice President Nuclear Operations - DTJ/mmg Enclosur'es cc: NRC Regional Office. F King' of Prussia, PA - t- / fCl - 305100317 930430. g ')ADOCK 05000334 -t/ 4 '~ PDR i

NARRATIVE

SUMMARY

OF MOITIHLY OPERATDJG EXPDtIDJCE UlHT 1 APRIL 1993 April 1 'Ihe Unit's ninth refuelirg outage continued with the Unit in through Mode 5. April 12 April 13 Mode 6 was entered at 0805 hours. The Unit remained in Mode 6 through for the remairxier of the report period. April 30 e t v

4 AVERAGE DAILY UNIT PGiER LEVEL DOCKET 10. 50-334 UNIT BVPS Unit 1 DATE May 3, 1993 COMPLETED BY David T. Jones TELEPHONE (412) 393-7553 MOtTIE ADril 1993 DAY AVERAGE DAILY POiER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net) (We-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0-8 0 24 0 9 0 25 0 P 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29-0 14 0 30 0 15 0 31 16 0 i INSTRUCTIG1S on this formt, list the average daily unit power level We-Net for each day in the reporting rentn. Compute to the nearest whole regawatt. .I

~. .1 OPERATING DATA REPORT DOCRET NO.: 50-334 REPORT DATE: 05/03/93 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7553 i f OPERATING STATUS ]

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes 1
2. REPORTING PERIOD: APRIL 1993
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923 t

5. DESIGN ELECTRICAL RATING.(Net MWe):

835 i 6 MAX. DEPENDABLE CAPACITY (Gross MWe): 860 ~,

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810 i

8. IF CHANGES OCCUR IN CAPACITY. RATINGS SINCE LAST REPORT, GIVE REASONS:

9.- POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None

10. REASONS FOR RESTRICTIONS., IF ANY:

N/A I l + a THIS MONTH YEAR TO DATE CUMULATIVE r

11. HOURS IN REPORTING PERIOD:

719.0 2879.0 149015.0

12. NO. OF HRS. REACTOR'WAS CRITICAL:

0.0 2041.6 95591.9 4

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8 I

14. HOURS GENERATOR WAS ON LINE:

0.0 2038.2 93689.0

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0. i

16. GROSS THERMAL ENERGY GEN. (MWH);

0.0 4687212.0 223662213.5

17. GROSS ELECT. ENERGY GEN. (MWH):

0.0 1541890.0 72036383.0

18. NET ELECTRICAL ENERGY. GEN. (MWH):

-3410.0 1441330.0 67307270.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0

~70. 8 ' 64.9

20. UNIT AVAILABILITY FACTOR:(PERCENT)

' O.0 70.8: 64.9

21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 61.8 58.4
22. UNIT' CAPACITY FACTOR (DER): PCT 0.0 60.0 56.6
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0
0. 0.

15.7

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

THE UNIT'S NINTH REFUELING OUTAGE IS CURRENTLY IN PROGRESS. t 25;. IF SHUT DOVN AT END OF REPORT PERIOD,. ESTIMATED DATE OF STARTUP: 06/04/93 f

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): -

FORECAST ACHIEVED-INITIAL CRITICALITY N/A N/A INITIAL-ELECTRICITY N/A N/A Jl COMMERCIAL OPERATION N/A N/A j i x ' L

UNIT SMUIDOWNS AND POWER REDUCTIONS (t20%) Docket No. .50-334 Unit Name BVPS Unit #1 Date May 4, 1993 Completed By David T. Jones REPORT MONTH APRll 1993 Telephone (412) 393 7553 Method of. Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typel (Hours) Reason 2 Down Reactor 3 Report # Codes Code 5 Prevent Recurrence 3 930401 S 719.0 C 4 N/A RC FUELXX Unit shutdown for the ninth-refueling outage. 9 2-3 4 F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B Maintenance or fest 2-Manual Scram-for Licensee Event Report (LER) File C-Refueling '3-Automatic Scram (NUREG0161). D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 .F-Administrative .9-Other Exhibit H-Same Source. G Operational Error (Explain) H-Other (Explain)- ~

I NARPATIVE

SUMMARY

OF M3tTIHLY OPEPATDIG EXPERIBK'E UNIT 2 APRIL 1993 V April 1 The Unit operated at a nominal value of 100% output. through April 7 April 8 At 2105 hours the Unit commenced a reduction in output to approxirately 45% in accordance with the planned fuel cycle length extension. April 9 An output of approxirately 45% was achieved at 0325 hours. April 10 The Unit remained at approxirately 45% output for planned through fuel cycle lergth extension. April 11 April 12 At 0030 hours -the Unit commenced a power increase to 100% output. A nominal value of 100% output was achieved at 0600 hours. April 13 The Unit operated at a nominal value of 100% output during through the remainder of the report period. April 30 I

li ..4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-412 UNIT BVPS Unit 2 DATE May 3, 1993 COMPLEIID BY David T. Jones TELEPHONE (412) 393-7553 MONIH Acril 1993 i DAY AVFRAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (l@e-Net) (l@e-Net) 1 832 17 840 I 2 837 18 838 3 835 19 836 4 837 20 832 5 837 21 840 .6 835 22 841 7 834 23 838 8 818 24 836 9 357 25 831 10 354 26 839 11 348 27 837 12 783 28 832 13 838 29 828 - 14 837 30 828 15 829 31 16 835 INtaxuunONS ' On this fornat, list the average daily unit power level IEe-Net for each day in the reporting renth. Cdapute to the nearest whole regawatt. r. ~ ' "

m ys c OPERATING DATA REPORT + y DOCKET NO.: 50-412 REPORT-DATE: 05/04/93 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: APRIL 1993
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPIATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836-

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY.(Net HWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH' YEAR TO DATE CUMULATIVE ^

11. HOURS IN REPORTING PERIOD:

719.0 2879.0 47798.0 -

12. NO.'OF HRS. REACTOR WAS CRITICAL:

719.0 2846.9' 41348.1

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0' 0.0-0.0~ 14.- HOURS GENERATOR WAS ON LINE: 719.0 2839.6' 41064.9-

15. UNIT RESERVE SHUTDOWN HOURS:

0.0. 0.0 0.0-

16. GROSS THERMAL ENERGY GEN..(MWH):

1786447.0 7072105.0 100618746.4' -

17. CROSS ELECT. ENERGY GEN. (MWH);

594267.0' 2352839.0 32496643.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

563939.0 ~2231236.0 30681043.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 98.6 85.9.
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 98.6 85.9
21. UNIT CAPACITY FACTOR'(MDC) PCT 95.7 94.5 77.7-
22. UNIT CAPACITY FACTOR (DER): PCT

.93.8 92.7-

76. 8~

23.' UNIT FORCED OUTAGE RATE:'(PERCENT) 0.0. 1.4 3.1

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):

THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS FOURTH ~ REFUELING OUTAGE ON SErit.MBER 17. 1993. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR-70 DAYS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

s UNIT SMUTDOWNS AND POWER REDUCTIONS (220%) Docket No. 50-412-Unit Name BVPS Unit #2 Date May 4 1993 Completed By David T. Jones REPORT MONTH APRIL 1903 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typet (Nours)- Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence 8 930408 5 0 N 5 N/A ZZ ZZZZZZ The Unit reduced output from 100%.. to approximately 45% in accordance the planned fuel cycle length extension. 1 2 3 4 F-Forced Reason: Method: Exhibit F-Instructions for S Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling Automatic Scram (NUREG0161). D-Regulatory Restriction 4* Cont'd. from Previous Month t E-operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit H-Same Source. G-Operational Error (Emplain) H Other-(Explain) v en -- ,-wwwwe ve a --e w ~ ~- e ---ver -w 1 er ~ w-v m m m~ ~ m =}}