Forwards Insp Repts 50-373/93-11 & 50-374/93-11 on 930316-0426.Violations Noted
ML20036A216
Person / Time
Site: LaSalle  
Issue date: 04/30/1993
From: Hague R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20036A217 List:
References
NUDOCS 9305100224
Download: ML20036A216 (2)


See also: IR 05000373/1993011

Text

.:

..

'

APR 3 0 E93

.

-

o

p

-

l

t

,

i

!

Docket No.

50-373

Docket No.

50-374

Commonwealth Edison Company-

ATTN:

Mr..L..0. DelGeorge

Vice. President, Nuclear Oversight-

and Regulatory. Services

,

'

Executive Towers West.III'

+

1400 Opus Place Suite 300

Downers Grove,

IL 60515

-

'

Dear Mr. DelGeorge:

This refers to the inspection conducted by D. Hills and C. Phillips of'this~

[

office, and by J. Roman of the Illinois Department.of. Nuclear Safety, on-

't

March 16.through April-26,1993. The inspection included a review of

.

authorized activities for your LaSalle County Station, Units 1 and 2,

'

facility. At the conclusion of the inspection, the findings.were discussed -

- with those members of your staff- identified in the enclosed report.

Areas examined during the inspection are identified in the report. . ithin

W

;

these areas, the inspection consisted of selective: examinations of procedures

,

and representative records, interviews with personnel, and.' observation of:

~ :

activities in progress.

l

Based on the results of this inspection, certain of you.r activities appeared .

l

-to be in violation of NRC requirements.. However, as described in the enclosed

inspection report, you identified this violation. Therefore, the-violation -

'

will,not be subject to. enforcement action because your efforts in. identifying

l

- and correcting the' violation ~ meet the criteria ~specified in Section:VII.B. of

i

the." General Statement of Policy and-Procedures for NRC Enforcement Actions,"

!

'

-(Enforcement Policy, 10:CFR Part 2,. Appendix C)"(1993)).

'In accordance with 10 CFR 2.790 of- the Commission's . regulations; a: copy ofL

l this letter, the enclosures, and your_ response to this letter will' be placed~

i

in the NRC Public Document Room.

j

.

4

1

a

t

d

1

- 060.113

-

-

!

+, .

l

-9305100224 930430

PDRz ADOCKi05000373-

H

G

.PDR.

!

4

f J

N

-

t

9

9L

e

"

APR 3 0 lE93

.

.

-

.

"

Commonwealth Edison. Company

-2

l

I'

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

LhW W

l

R. L. Hague, Chief

Reactor. Projects Section-IC

Enclosures:

Inspection Reports-

No.

50-373/930ll(DRP);

No.

50-374/930ll(DRP)

cc w/ enclosures:

W. Murphy, Site Vice President

G. Spedl, Station Manager

J. Lockwood, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory Services

Manager

OC/LFDCB

Resident Inspectors, LaSalle,

Clinton, Dresden,-Quad Cities

R. Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

Licensing Project Manager, NRR

R. Newmann, Office of Public

Counsel, State of Illinois Center

State Liaison Officer

Chairman, Illinois Commerce Commission

1.

L

l~

RIII

Rill'

%f)

/f

Burgess

6

gue

(M6

  1. 3 / 93

L

a

_