ML20036A209

From kanterella
Jump to navigation Jump to search
Notification of 930512 Meeting W/Util in Rockville,Md to Discuss Process Utilized at Plant for Assessing Differences Between EOPs & Licensing Basis.Agenda Encl
ML20036A209
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/05/1993
From: Jabbour K
Office of Nuclear Reactor Regulation
To: Matthews D
Office of Nuclear Reactor Regulation
References
NUDOCS 9305100216
Download: ML20036A209 (4)


Text

{{#Wiki_filter:'A May 5, 1993 Docket Nos. 50-321 and 50-366-MEMORANDUM FOR: David B. Matthews, Director ~ Project Directorate 11-3 Division of Reactor Projects - I/II FROM: Kahtan N. Jabbour, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II.

SUBJECT:

FORTHCOMING MEETING WITH GEORGIA POWER COMPANY ON THE DIFFERENCES BETWEEN THE EMERGENCY OPERATING PROCEDURES AND' THE LICENSING BASIS - HATCH NUCLEAR PLANT, UNITS 1 AND 2 t DATE & TIME: Wednesday, May 12, 1993 1:00 p.m. - 3:30 p.m. i LOCATION: One White Flint North 11555 Rockville Pike Room I/F/5 Rockville, Maryland 20852 PURPOSE: To discuss the process utilized by Georgia Power Company at-Plant Hatch for assessing the differences between the 3 emergency operating procedures and the licensing basis t (see Agenda). PARTICIPANTS *: NRC GEORGIA POWER j t K. Jabbour J. Heidt W. Long, et al. O. Vidal, et al. R. Frahm, et al. ORIGINAL SIGNED BY: Kahtan N. Jabbour,. Senior Project Manager Project Directorate II Division of Reactor Projects --I/II Office of Nuclear Reactor Regulation 4

Enclosure:

Agenda cc: See next page f

  • Meetings between NRC technical-staff and applicants or: licensees' are open for interested members of_ the_ public, petitioners, intervenors, or other parties to attend as observers pursuant to Policy," 43. Federal Reoister 28R,"Open Meeting Statement of NRC Staff f/28/78.

fk3 PDII-3:PMg OFC-PDII-3: D: Beth KJabbour w D. tthews NAME L. h/ /93 6/4/93 [/b/93 DATE I Document Name: C:/MTG5-12. HAT DISTRIBUTION: SEE NEXT PAGE i kh'["3ER9**7?f?P$WF 9305100216 930505 KbtE O d M' -l PDR ADDCK 05000321 "^' * *- P-PDR ggg -{ uo g

7'l 4. r [ Georgia Power Company Edwin I. Hatch Nuclear Plant cc: Mr. Ernest L. Blake, Jr. Mr. R. P. Mcdonald Shaw, Pittman, Potts and Trowbridge Executive Vice President - 2300 N Street, NW. Nuclear Operations Washington, DC 20037 Georgia Power Company P. O. Box 1295 Mr. J. T. Beckham Birmingham, Alabama 35201 Vice President - Plant Hatch Georgia Power Company Mr. Alan R. Herdt, Chief P. O. Box 1295 Project Branch #3 Birmingham, Alabama 35201 U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Mr. S. J. Bethay Atlanta, Georgia 30323 Manager Licensing - Hatch Georgia Power Company Mr. Dan Smith P. O. Box 1295 Power Supply Operations Birmingham, Alabama 35201 Oglethorpe Power Corporation 2100 East Exchange Place Mr. L. Sumner Tucker, Georgia 30085-1349 i General Manager, Nuclear Plant Georgia Power Company Charles A. Patrizia. Esquire Route 1, Box 439 Paul, Hastings Janofsky & Walker Baxley, Georgia 31513 12th Floor 1050 Connecticut Avenue, NW. 1 Resident Inspector Washington, DC 20036 U. S. Nuclear Regulatory Commission Route 1, Box 725 Mr.,W. G. Hairston, III Baxley, Georgia 31513 Senior Vice President - Nuclear Operations Regional Administrator, Region II Georgia Power Company. U. S. Nuclear Regulatory Commission P. O. Box 1295 101 Marietta Street, NW. Suite 2900 Birmingham, Alabama 35201 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget . Room 610 t

270 Washington Street, SW.

f Atlanta, Georgia 30334 i Harold Reheis, Director Department of Natural Resources i 205 Butler Street, SE., Suite 1252 l Atlanta, Georgia 30334 Chairman Appling County Commissioners' County Courthouse Baxley, Georgia 31513 n ?l t

IO. ,M. 4' ENCLOSURE Aaenda for NRC/GPC Meetina May 12. 1993-1. INTRODUCTION NRC/GPC ~ II. GUIDANCE

SUMMARY

GPC o Review of FSAR against E0Ps, conflict identification - o Methods for resolving conflicts III. OVERVIEW 0F HATCH E0Ps GPC IV. DISCUSSION OF REVIEW PROCESS GPC" l { V. DISCUSSION OF INDIVIDUAL CONFLICTS AND RESOLUTIONS GPC o HPCI/RCIC suction source transfer o ADS inhibit o Standby liquid control initiation criteria i 0 RCIC low pressure isolation setpoint o Use of_ containment atmosphere dilution for combustible gas control ] 'o 0perator actions _for first 10 minutes of an accident i o Deliberate lowering 'of water level

i o Torus temperature to'.initiat'e' reactor depressurization

-j O Secondary containment response _to instrument line break-o Post accident waterllevel indication .j VI. CONCLUSIONS

GPC/NRC.

Jq L 1 i i i t 1 i .f a

4 ,~

4.

DISTRIBUTION - Routine Meetina Notice

Docket File':

NRC & Local PDRs PDII-3 Reading T. Murley/F. Miraglia,12G18 J. Partlow,12G18 SVarga Glainas DMatthews KJabbour LBerry A. Chaffee, 11A1 OGC, 15B18 E. Jordan, MNBB3701 Receptionist, OWFN ACRS (10), P-315 OPA, 2G5 NRR Mailroom, PMAS,12G18 P. O' Dell, PMAS,12E4 G. Zech, 10A19 L. Plisco, EDO, 17G21 K. Clark, RII J. Kudrick, 8D1 R. Frahm, 903 W. Long, 13D18 a}}