Text
-___
P
x-W:
O
APR 3 01333
Docket Nos. 50-245
50-336
j
50-423
,
Mr. John F. Opeka
Executive Vice President - Nuclear
l
Northeast Nuclear Energy Company
P.O. Box 270
Hartford, Connecticut M141-0270
Dear Mr. Opeka:
SUBJECT:
MILLSTONE COMBINED INSPECTION 50-245/93-10; 50-336/93-06;
50-423/93-07
This refers to the safety inspection conducted by Mr. P. Swetland and others of this office on
March 3,1993 through April 3,1993, at Millstone Station in Waterford, Connecticut. The
,
l
preliminary findings were discussed with Mr. S. Scace, the Unit Directors, and others of
,
your staff at the conclusion of the inspection. Areas examined during the inspection are
i
l
described in the enclosed report. Within these areas, the inspection focused on issues
l
important to public health and safety, and consisted of performance observations of ongoing
i
activities, independent verification of safety system status and design configuration,
interviews with personnel, and review of quality records.
The inspectors identified that certain procedural requirements of the Unit 2 license were not
adequately implemented during this inspection period. These included failure to follow test
procedures which resulted in inadvertent reactor protection system actuations, and the late
reporting of such actuations to the NRC. We also found that your corrective action for
electrical contact failures at Unit I was not effective in precluding recurrence of these
failures. Three violations of NRC requirements concerning these problems are cited in the
enclosed Notice of Violation.
You are required to respond to the enclosed Notice of Violation and should follow the
,
'
instructions in the enclosed Notice when preparing your response. In accordance with
10 CFR 2.790 of the NRC's " Rules of Practice," a copy this letter and the enclosed Notice
will be placed in the NRC Public Document Room. The responses directed therein are not
subject to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, Public Law No. 96.511.
During this inspection, we also evaluated your self-identification and correction of problems
related to an open reactor building blow-out panel at Unit 1, unauthorized conduct of
surveillance tests at Unit 2, and inadequate surveillance test implementation at Unit 3. We
have determined that your corrective actions for these issues were acceptable and the specific
,
3
l
9305100049 930430
ni
i
ADDCK 05000245
p\\
l
G
OFFICIAL RECORD COPY
f
.
.APR 3 01333
'
Northeast Nuclear
2
Energy Company
problems posed minimal safety consequences. Therefore, in accordance with Section VII.B
of the Enforcement Policy, enforcement discretion was exercised and violations were not
cited for these cases.
Our inspection also involved a detailed review of the activities of groups that contributed to
the overall self-assessment function at Millstone. Our review, documented in Section 5.4 of
the enclosed report, found generally mixed performance and identified a number of
significant opportunities for improvement. I believe this area of the report warrants your
close attention and I would be interested in hearing from you if you either have questions or
dispute the findings.
We appreciate your cooperation.
Sincerely,
Original Signed By
A. Randolph Blough, Chief
Projects Branch No. 4
Division of Reactor Projects
Enclosures:
2. NRC Combined Inspection Report 50-245/93-10; 50-336/93-06; 50423/93-07
cc w/encls:
W. D. Romberg, Vice President - Nuclear, Operations Services
'
S. E. Scace, Vice President, Millstone Nuclear Power Station
H. F. Haynes, Nuclear Unit Director, Unit 1
i
J. S. Keenan, Nuclear Unit Director, Unit 2
F. R. Dacimo, Nuclear Unit Director, Unit 3
R. M. Kacich, Director, Nuclear Licensing
G. H. Bouchard, Director of Quality Services
Gerald Garfield, Esquire
Nicholas Reynolds, Esquire
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut SLO Designee
L
/
-
.
APR 3 01993
1
Nonheast Nuclear
3
Energy Compaay
bec w/ encl:
Region I Docket Room (with concurrences)
bec w/ encl: (VIA E-MAIL)
V. McCree, OEDO
J. Stolz, NRR/PD I-4
RI:DRP
RI:DRP
RI:DRP
g P.SWETLAND
L.DOERFLEIN
A.BLOUGH
4 44 /93
4/26/93
I
'/93
OFFICIAL RECORD COPY
G:\\ BRANCH 4\\MSLOST
. . . .
.
.
-
-