Forwards Safety Insp Repts 50-245/93-10,50-336/93-06 & 50-423/93-07 on 930303-0403 & Notice of Violation.Corrective Actions for Electrical Contact Failures at Unit 1 Not Effective in Precluding Recurrence of Failures
ML20036A103
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/30/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20036A104 List:
References
NUDOCS 9305100049
Download: ML20036A103 (3)


See also: IR 05000245/1993010

Text

-___

P

x-W:

O

APR 3 01333

Docket Nos. 50-245

50-336

j

50-423

,

Mr. John F. Opeka

Executive Vice President - Nuclear

l

Northeast Nuclear Energy Company

P.O. Box 270

Hartford, Connecticut M141-0270

Dear Mr. Opeka:

SUBJECT:

MILLSTONE COMBINED INSPECTION 50-245/93-10; 50-336/93-06;

50-423/93-07

This refers to the safety inspection conducted by Mr. P. Swetland and others of this office on

March 3,1993 through April 3,1993, at Millstone Station in Waterford, Connecticut. The

,

l

preliminary findings were discussed with Mr. S. Scace, the Unit Directors, and others of

,

your staff at the conclusion of the inspection. Areas examined during the inspection are

i

l

described in the enclosed report. Within these areas, the inspection focused on issues

l

important to public health and safety, and consisted of performance observations of ongoing

i

activities, independent verification of safety system status and design configuration,

interviews with personnel, and review of quality records.

The inspectors identified that certain procedural requirements of the Unit 2 license were not

adequately implemented during this inspection period. These included failure to follow test

procedures which resulted in inadvertent reactor protection system actuations, and the late

reporting of such actuations to the NRC. We also found that your corrective action for

electrical contact failures at Unit I was not effective in precluding recurrence of these

failures. Three violations of NRC requirements concerning these problems are cited in the

enclosed Notice of Violation.

You are required to respond to the enclosed Notice of Violation and should follow the

,

'

instructions in the enclosed Notice when preparing your response. In accordance with

10 CFR 2.790 of the NRC's " Rules of Practice," a copy this letter and the enclosed Notice

will be placed in the NRC Public Document Room. The responses directed therein are not

subject to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, Public Law No. 96.511.

During this inspection, we also evaluated your self-identification and correction of problems

related to an open reactor building blow-out panel at Unit 1, unauthorized conduct of

surveillance tests at Unit 2, and inadequate surveillance test implementation at Unit 3. We

have determined that your corrective actions for these issues were acceptable and the specific

,

3

l

9305100049 930430

ni

i

PDR

ADDCK 05000245

p\\

l

G

PDR

OFFICIAL RECORD COPY

f

.

.APR 3 01333

'

Northeast Nuclear

2

Energy Company

problems posed minimal safety consequences. Therefore, in accordance with Section VII.B

of the Enforcement Policy, enforcement discretion was exercised and violations were not

cited for these cases.

Our inspection also involved a detailed review of the activities of groups that contributed to

the overall self-assessment function at Millstone. Our review, documented in Section 5.4 of

the enclosed report, found generally mixed performance and identified a number of

significant opportunities for improvement. I believe this area of the report warrants your

close attention and I would be interested in hearing from you if you either have questions or

dispute the findings.

We appreciate your cooperation.

Sincerely,

Original Signed By

A. Randolph Blough, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Combined Inspection Report 50-245/93-10; 50-336/93-06; 50423/93-07

cc w/encls:

W. D. Romberg, Vice President - Nuclear, Operations Services

'

S. E. Scace, Vice President, Millstone Nuclear Power Station

H. F. Haynes, Nuclear Unit Director, Unit 1

i

J. S. Keenan, Nuclear Unit Director, Unit 2

F. R. Dacimo, Nuclear Unit Director, Unit 3

R. M. Kacich, Director, Nuclear Licensing

G. H. Bouchard, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut SLO Designee

L

/

-

.

APR 3 01993

1

Nonheast Nuclear

3

Energy Compaay

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/ encl: (VIA E-MAIL)

V. McCree, OEDO

D. Jaffe, PM, NRR

J. Andersen, PM, NRR, Unit 1

G. Vissing, PM, NRR, Unit 2

V. Rooney, PM, NRR, Unit 3

J. Stolz, NRR/PD I-4

RI:DRP

RI:DRP

RI:DRP

g P.SWETLAND

L.DOERFLEIN

A.BLOUGH

4 44 /93

4/26/93

I

'/93

OFFICIAL RECORD COPY

G:\\ BRANCH 4\\MSLOST

. . . .

.

.

-

-