ML20035H576
| ML20035H576 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/29/1993 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20035H577 | List: |
| References | |
| NUDOCS 9305060012 | |
| Download: ML20035H576 (2) | |
See also: IR 05000457/1993008
Text
0
e
gR REcoq
Ufel T E D STAVES
f1
g
NUCLEAR REGULATORY COMMisslON
O
,
[
Q
REGION lit
f
$.
l
$
%,
$g
GLEN ELLYN, (LLINOIS 60137
)
APR 2 91993
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. L. O. DelGeorge
Vice President
Nuclear Oversight and
Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
This refers to the inspection conducted by Mr. J. F. Schapker of this office
on March 23-24, 29-31, April 6 and 20, 1993. The inspection included
activities related to inservice inspection and other outage activities fcr
your Braidwood Station, Unit 2.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,,_
h, 7
- hpew
(q
/
V
4
a
'
G. C. Wright, Chief
Engineering Branch
Enclosure:
Inspection Report
No. 50-457/93008(DRS)
See Attached Distribution
040180
9305060012 930429
ADOCK 05000457
l
G
g
PUBLic- 5 0/
i
.
Commonwealth Edison Company
2
APR 2 91993
Distribution
cc w/ enclosure:
S. Berg, Site Vice President
K. Kofron, Station Manager
A. Haeger, Regulatory Assurance
Supervisor
D. Farrar, Nuclear Regulatory
Services Manager
OC/LFDCB
Resident Inspectors-Byron,
Braidwood, Zion
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief,
Public Utilities Division
Licensing Project Manager, NRR
Robert Newmann, Office of Public
Counsel, State of Illinois Center
State Liaison Officer
Chairman, Illinois Commerce
Commission