ML20035H473
| ML20035H473 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/23/1993 |
| From: | Shelton D CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20035H474 | List: |
| References | |
| 2131, NUDOCS 9305050125 | |
| Download: ML20035H473 (1) | |
Text
e GNEER0tHE W
ENERGY I
Donald C. Shelton 300 Mad: son Avenue Vce President-Nuclear Toledo, JH 435524301 t
Davis Besse (419)24S MOD i
Docket Number 50-346 License Number NPF-3 Serial Number 2131 j
April 23, 1993 United States Nuclear Regulatory Commission i
Document Control Desk l
Vashington, D.C. 20555 l
Subj ect:
Core Operating Limits Report and Reload Report for Cycle 9 l
t Gentlemer.:
Enclosed is a copy of the Davis-Besse Nuclear Power Station, Unit 1
{
(DBNPS) Core Operating Limits Report (COLR) for Cycle 9 operation f
(Enclosure I).
The COLR is being submitted in accordance with DBNPS Technical Specification 6.9.1.7.
In addition, an information only copy of the DBNPS Cycle 9 Reload Report is provided as Enclosure II.
j If you have any questions, please contact Mr. R. V. Schraader, Manager - Nuclear Licensing, at (419) 249-2366.
l Very truly yours,
-gMK
/
^
i i
D.H/d c Enclosures cc:
A. B. Davis, Regional Administrator, IRC Region III I
J. B. Hopkins, NRC/NRR DB-1 Senior. Project. Manager S. Stasek, NRC Region III, DB-1 Senior Resident Inspector j
Utility Radiological Safety Board i
A I
ii 040105 9305050125 930423+
'/
PDR ADOCK 05000346 P
PDR g
Operating Companies:
Develand Electre muminotmg Toledo Edson
.