Notification of 930503 Meeting W/Util in Rockville,Md to Discuss Point Beach IPE & Reliablilty of Point Beach Combustion Turbine Generator Used for Complying W/Station Blackout Rule
ML20035H334
Person / Time
Site: Point Beach  
Issue date: 04/27/1993
From: Gody A
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9305040243
Download: ML20035H334 (6)


Text

[ [s+ na uq d

k UNITED STATES 21

.E NUCLEAR REGULATORY COMMISSION

%(

WASHINGTON, D.C. 205E0001

% 1~

f April 27, 1993 Docket Nos.

50-266 and 301 MEMORANDUM FOR:

T. Murley G. Lainas A. Gody, Sr.

F. Miraglia B. Boger F. Congel W. Russell J. Zwolinski E. Butcher J. Partlow M. Virgilio J. Roe D. Crutchfield C. Rossi C. Thomas W. Travers J. Richardson W. Bateman, EDO C. Miller B. D. Liaw M. Slosson S. Varga A. Thadani Operations Center G. Holahan B. Grimes THRU:

John N. Hannon, Director Project Directorate III/3 Division of Reactor Projects - III/IV/V FROM:

Anthony T. Gody, Jr., Senior Project Manager Project Directorate III/3 Division of Reactor Projects - III/IV/V

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH WISCONSIN ELECTRIC POWER COMPANY REGARDING LICENSEE IMPLEMENTATION OF THE POINT BEACH IPE AND THE STATION BLACK 0UT RULE DATE & TIME:

Monday, May 3, 1993 1:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, Maryland Room 13-E-9 PURPOSE:

To discuss the Point Beach Individual Plant Examination and the reliability of the Point Beach Combustion Turbine Generator used for complying with the Station Blackout rule.

P1

'~

s?Ess!Zs88llg6 g

P

\\\\

J.

  • PARTICIPANTS:

NRC Industry J. Zwolinski, NRR G. Krieser, WEPCo J. Hannon, NRR M. Bauman, WEPCo A. Gody, Jr., NRR R. Ulmer, WEPCo J. Schiffens, NRR H. Hanneman, WEPCo R. Hernan, NRR E. Mercier, WEPCo J. Flack, RES S. Hoggatt, WEPCo A. Pal, NRR C. Castell, WEPCo A. Gill, NRR R. Jones, WEPCo

,hf/ OM Anthony T. Gody, Jr., Senior Project Manager Project Directorate III/3 Division of Reactor Projects - III/IV/V cc:

See next page

Enclosure:

Tentative Meeting Outline

  • Meeting between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

i

I-

,

  • PARTICIPANTS:

NRC Industry J. Zwolinski, NRR G. Krieser, WEPCo J. Hannon, NRR M. Bauman, WEPCo

.A. Gody, Jr., NRR R. Ulmer, WEPCo J. Schiffens, NRR H. Hanneman, WEPCo R. Hernan, NRR E. Mercier, WEPCo J. Flack, RES S. Hoggatt, WEPCo A. Pal, NRR C. Castell, WEPCo A. Gill, NRR R. Jones, WEPCo l

.l Original Signed By:

Anthony T. Gody, Jr., Senior Project Manager Project Directorate III/3 Division of Reactor Projects - III/IV/V l

cc:

See next page i

Enclosure:

Tentative Meeting Outline

  • Meeting between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

LA:PQflj7:3 DRPW PM:PDIII-3:DRPW PD:PDill.: RW MRushit ook-ATGody, Jp./bj JHannon l

d /h1/93

/////)3 M 4/2,/93

Enclosure i

e TENTATIVE MEETING OUTLINE WISCONSIN ELECTRIC POWER COMPANY AND THE U.S. NUCLEAR REGULATORY COMMISSION Room: OWFN 13-E-9 Time: I:00 pm o POINT BEACH INDIVIDUAL PLANT EXAMINATION PROGRAM

Background

-+

Status Summary

-+

Preliminary Results and Insights

-+

Enhancements to Consider

-+

Open Discussion ALTERNATE AC POWER FOR POINT BEACH NUCLEAR PLANT o

Current Status of Combustion Turbine

-+

Post Overhaul Testing

-+

Failures / Root Causes/ Corrective Actions Plans for Continuing Testing and Improvements

-+

Future Plans and Options 1

i 2

Point Beach Nuclear Plant l

Wisconsin Electric Power Company Unit Nos. I and 2 cc:

Mr. Robert E. Link, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee, Wisconsin 53201 Ernest L. Blake, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chai rman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 s

-4:

DISTRIBUTION

< Docket' File NRC & Local PDRs

'PDIII-3 r/f A. Gody, Jr.

M. Rushbrook A. Chafee OGC E. Jordan Receptionist (WF)

ACRS(10)

NRR Mailroom, PMAS,12/G/18 P. O' Dell G. Zech G. Grant (17-G-21)

J. Strasma E. Greenman, RIII J. Schiffens J. Flack R. Hernan A. Pal A. Gill i

5 0

P

  • e 5

I i

. _ _ _ _ _ _ _._1,

-