ML20035H141
| ML20035H141 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Hatch |
| Issue date: | 04/23/1993 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20035H142 | List: |
| References | |
| NUDOCS 9305030196 | |
| Download: ML20035H141 (4) | |
See also: IR 05000245/1993012
Text
I
-
_CCh
'
.
.
.
-
,
i
Af9 2 3 1993
!
i
!
!
.
Docket Nos. 50-245
1
50-336
50-423
l
Mr. John F. Opeka
Executive Vice President - Nuclear
Nonheast Nuclear Energy Company
'
P. O. Box 270
Hanford, Connecticut 06141-0270
i
Dear Mr. Opeka:
[
i
Subject:
NRC Combined Inspection Nos. 50-245/93-12; 50-336/93-08;
<
50-423/93-09
i
-i
An announced radiological controls inspection was conducted on March 30 - April 1,1993, by
l
Mr. R. L. Nimitz at the Millstone Nuclear Power Station Units 1, 2, and 3. The findings of.
,
the inspection were discussed with Mr. R. Factora and others at the conclusion of the inspection
.i
on April 1,1993.
Areas reviewed during the inspection were imponant to health and safety and are discussed in
the enclosed inspection report. These areas included action on previous NRC findings, audits and -
,
assessments, organization and staffing, training and qualifications, routine radiological controls,
'
'
the ALARA Program, plauning and preparation for the Unit 3 refueling outage and the
condenser tube mplacement at Unit 2, effons to plan and prepare for the implementation of the
!
revised 10 CFR Pan 20, and radwaste reduction initiatives.
'
No safety concerns or violations were identified. The inspector's review identified that generally
very good radiological controls were implemented at each of the three units. The enhancement
of radiological controls technical suppon was considered a very good initiative. Very good
planning effons for the upcoming Unit 3 refueling outage and condenser tube replacement at
Unit I were noted. Very good effons on preparation for implementation of the revised 10 CFR
'
Pan 20 was also noted. ' Overall station housekeeping was very good. Additional planned effons
to funber enhance station housekeeping were also noted.
j
t
.
n
,
h
'
OFFICIAL RECORD COPY
F
030011
4
g .i ( )
I
j
e
1-
,
9305030196 930423
^
'
ADOCK 05000245
G
!
,
.
.
'
Nonheast Nuclear Energy Company
2
APfl 2 3 1933
!-i
No response to this letter is required. Your coopemtion with us is appreciated.
i
,
Sincerely,
t
. OriginalSigned By:
James H. Joyner
James H. Joyner, Chief
Facilities Radiological Safety
Division of Radiation Safety
'
and Safeguards Bnmch
and Safeguards
-'
.
Enclosure: NRC Combined Inspection Repon Nos. 50-245/93-12;50-336/93-08;50-423/93-09
i
i
cc w/ encl.
W. D. Romberg, Vice Pmsident - Nuclear, Operations Services
'
S. E. Scace, Vice Pmsident, Millstone Station
!
H. F. Haynes, Nuclear Unit Director
l'
J. S. Keenan, Nuclear Unit Director
F. R. Dacimo, Nuclear Unit Director
R. M. Kacich, Manager, Nuclear Licensing
[
i
G. H. Bouchard, Director of Quality Services
Gerald Garfield, Esquire
i
Nicholas Reynolds, Esquire
K. Abmham, PAO (2)
.
'
Public Document Room (PDR)
I.ncal Public Document Room (LPDR)
Nuclear Safety Infonnation Center (NSIC)
[
NRC Resident Inspector
State of Connecticut SLO Designee
l
!
t
OFFICIAL RECORD COPY
,
- - - - - - .
- - . -
-
- - .
. .
-
__
_
.
..
&
.
-
i
..
IE23
-
Northeast Nuclear Energy Company
3
bec w/ encl:
Region I Docket Room (with concurrences)
l
'
DRSS SALP Coordinator
J. Joyner, DRSS
-i
R. Blough, DRP
,
'
L. Doerflien, DRP
P. Swetland, SRI, hiillstone
1
W. Raymond, SRI, Haddam Neck
[
V. hicCree, OEDO
J. Anderson, hTR
l
D. Jaffe, Pai, NRR
G. Vissing, Phi, NRR
l
V. Rooney, Phi, NRR
.
R. Barkley, DRP
DRS/EB SALP Coordinator
'
i
)
i
i
'
,
f
!
i
,
i
l
!
i
I
OFFICIAL RECORD COPY
l
.
!
.
-
,
-
hr,,1 2 3 7pg3
Nonheast Nuclear Energy Company
4
t
!
,
L
I
,
>
-,
,
'
t
i
,
I
,
,
1
I
i
!
RI:DRSS
RI:D
S
RI:DRSS
i
.
'l
i
(LLO
\\
'
) diak
Nimitz
as
Joyner
04/li/93
04/6@3
04D&93
,
j
OFFICIAL RECORD COPY