Forwards Insp Rept 50-317/93-09 & 50-318/93-09 on 930329-0423.No Violations Noted
ML20035H071
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/23/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20035H072 List:
References
NUDOCS 9305030071
Download: ML20035H071 (3)


See also: IR 05000317/1993009

Text

,

m

r

D

.

-

.

-

.

IFR 2 31933

'

Docket Nos. 50-317

50-318

Mr. Robert E. Denton

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, Maryland 20657 - 4702

Dear Mr. Denton:

Subject:

Combined Inspection Nos. 50-317/93-09 and 50-318/93-09

This letter refers to the safety inspection conducted by Mr. J. Kottan and Ms. N. McNamara

of this office on March 29 - April 2,1993, of activities authorized by NRC License Nos.

DPR-53 and DPR-69 at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Lusby,

Maryland, and to the discussions of our findings held by Mr. Kottan and Ms. McNamara with

Mr. P. Chabot and other members of your staff at the conclusion of the inspection.

i

Areas examined during this inspection are important to public health and safety, and are

i

described in the NRC Region I Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

In addition, our Mobile laboratory was brought to your site and used by the inspectors to make

certain independent measurements. The basic purpose of these independent measurements is to

,

verify your capability for analyzing radioactive effluents, and to achieve and maintain

comparable methods of analyses between your facility and the NRC. The data from these

measurements are included in this report with the exception of the wet chemistry results, which

will be documented in a subsequent inspection report.

,

,

300082

OFFICIAL RECORD COPY

G:CC9309.CIR.

April 22,1993

i

,

,

$$@* SSON 000h7

k

)

0

B

L*'

!

. .

.-

-

.

!

'

iSH 2 3 1993

Baltimore Gas and Electric Company

2

Within the scope of this inspection, you had in place effective programs for measuring

radioactivity in process and effluent samples and for measuring chemical parameters in plant

systems samples. No violations of regulatory requirements were observed and no response to

this letter is required.

Sincerely,

,

originalsigned By:

James H.Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

,

Division of Radiation Safety

and Safeguards

'

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-317/93-09 and 50-318/93-09

r

cc w/ encl:

!

!

G. Detter, Director, Nuclear Regubtory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Ochs, Maryland Safe Energy Coalition

,

K. Abraham, PAO (2)

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

NRC Resident Inspector

,

State of Maryland (2)

!

,

,

e

OFFICIAL RECORD COPY

G:CC9309.CIR

April 22,1993

j

l

.

,

.

-

,

.

.

,

Baltimore Gas and Electric Company

3

UA 2 3 L%)

bec w/ enc 1:

Region I Docket Room (with concurrences)

C. Cowgill, DRP

J. Yerokun, DRP

L. Nicholson, DRP

D. Weaver, DRP

P. Wilson, SRI - Calvert Cliffs

V. McCree, OEDO

R. Capra, NRR

D. Mcdonald, NRR

DRS/EB SALP Coordinator

,

"

!

/

RIi RSS

RSS

RI: RSS

g

McNamara/ tmh

Kottan

Pares

j

s

V

1

04/9/93

04/2.2/93

04 > /93

04fE/93

i

,

OFFICIAL RECORD COPY

G:CC9309.CIR

April 22,1993