ML20035G844
| ML20035G844 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/15/1993 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hairston W Georgia Power Co |
| References | |
| NUDOCS 9304300101 | |
| Download: ML20035G844 (3) | |
Text
/
/
lCcak APR 1 5 1933 Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 Gentlemen:
SUBJECT:
V0GTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 17 Based on our review of the subject submittal, we have concluded that the changes therein meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Appendix E to 10 CFR Part 50.
Should you have any questions regarding this letter, please contact Mr. Kenneth P. Barr of our staff at (404) 331-0335.
Sincerely, ORIGINAL StGNED BY WiLUAM E. CUNF William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards 1
cc:
(see page 2) 9304300101 930415 ADOCK 05000424 PDR PDR F
.ZE35 "
~
i l
- }
Georgia Power Company 2
cc:
R. P. Mcdonald
.i Executive Vice President Nuclear Operations j
Georgia Power Company-P. O. Box 1295 l
Birmingham, AL 35201 1
C. K. McCoy Vice President-Nuclear Georgia Power Company 1
P. O. Box 1295 l
Birmingham, AL 35201 l
l W. B. Shipman General Manager, Nuclear Operations l
Georgia Power Company
.j P. O. Box 3600 Waynesboro, GA 30830 l
J. A. Bailey Manager-Licensing Georgia Power Company j
P. O. Box 1295 j
Birmingham, AL 35201 i
i Nancy G. Cowles, Counsel j
Office of the Consumer's Utility Council 84 Peachtree Street, NW,. Suite 201 l
Atlanta, GA 30303-2318 l
Office of Planning and Budget Room 615B' 270 Washington Street, SW j
Atlanta, GA 30334 Office of the County Commissioner Burke County Commission' q
Waynesboro, GA-30830 Harold Reheis, Director Department of Natural Resources l
205 Butler Street, SE, Suite 1252 Atlanta,.GA 30334 I
cc:
(cont'd on page 3) 1
.i
'i i
r 1
u
Georgia Power Company 3
cc:
(cont'd)
Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Dan H. Smith Vice President Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.
20036 bcc:
D. Seymour, RII D. Hood, NRR P. Skinner, Ril A. Herdt, Ril S. Vias, Ril Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 572 Waynesboro, GA 30830 i
i R I:
SS R 1:DRSS RI l
AGooden B rr PSkinner t
s Y//f/93
>7/ff93 4/,y/93 i
o