P
-
pp Rf c
UNIT E D ST ATES
-
f
og%
'
t
?<
NUCLEAR REGULATORY COMMISSION
. 3
y
W
"y
e
,
R E GION IV
-
$
f
611 RY AN PLAZA DRIVE, SUIT E 400
!
Y,
y
AR LINGT ON. T E XAS 76011 8064
APR 2 21993
1
Docket:
50-192
License: R-92
!
The University of Texas at Austin
j
ATTN:
Dr. Bernard W. Wehring, Director
Nuclear Engineering Teaching Laboratory
-
10100 Burnet Road
i
SUBJECT: NRC INSPECTION REPORT 50-192/93-01
This refers to the inspection conducted by Mr. Wesley L. Holley of this office
!
on April 5 and 6, 1993.
The inspection included a review of activities
authorized for your TRIGA - MARK I Research Reactor. At the conclusion of the
!
inspection, the findings were discussed with you and the member of your staff
identified in the enclosed report.
l
Areas examined during the inspection are identified in the report. Within
!
these areas, the inspection consisted of selective examination of procedures
l
and representative records, interviews with personnel, and the observation of
'
activities in progress.
The results of this inspection are documented in the
enclosed report.
The inspection effort involved the coordination of the confirmatary
radiological survey activities which were performed by our contractor, Oak
i
Ridge Institute for Science and Education (0 RISE). These confirmatory surveys
were not completed, because a concern was identified that contamination might
be present in the area between the reactor pool liner and the concrete support
structure surrounding the liner. These concerns were based on the fact that
the water in the pool had overflowed on several occasions during reactor
operations and that contaminated water may have entered the area between the
liner and the concrete.
This concern is substantiated by the fact that your
,
f acility survey results identified contaminated areas in cracks in the
concrete support structure that resulted from the pool overflows.
It is our understanding that you are making arrangements to have the pool
liner removed.
Please let us know when the liner is removed and when you have
!
completed your radiological surveys of the liner and concrete support
structure.
Once you have completed these surveys, we will make arrangements
with ORISE to perform a confirmatory measurement survey.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC Public Document
Room.
9304290083 930422
/(/(- { l
ADOCK 05000192
()
O
g
w
-
. _ - _ -
.
.
.
_
i
'
.
!,,
'
f
- The University of Texas
-2-
at Austin
r
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
l
Sincerely,
4
!
!
i
a
g
-
L(.J.
I
a lan, Director
Divisijn of Radiation Safety
,
and Safeguards
!
Enclosure:
!
Appendix - NRC Inspection Report
i
50-192/93-03
4
j
cc-
!
The University of Texas at Austin
]
j
ATTN:
Dr. Thomas Bauer
!
Reactor Supervisor
l
Nuclear Engineering Teaching Lab.
.
I
10100 Burnet Road
'
i
i
!
The University of Texas at Austin
j
ATTN: M . W. Bryant
'
Radiation Safety Officer
'
Environmental Health and Safety
i
Service Building, Rm. 202
l
,
Radiation Control Program Director
Bureau of Radiation Control
i
Dept. of Health
i
1100 W. 49th Street
!
t
f
Office of the Governor
!
)
ATIN:
Susan Rieff
!
]
Director of Environmental Policy
i
P.O. Box 12428
.
i
!
1
!
,
e
i
i
i
t
.
-
__
.-
-
.
-
.-
,
-
I
.
i
I
-
!
!
The University of Texas
-3-
at Austin
!
!
bcc to DMB (IE01)
'
i
bcc:
i
J. L. Milhoan, RA
i
L. J. Callan, DRSS
i'
- B. Murray, FIPS
- W. L. Holley, FIPS
!
- DRS
l
- MIS Coordinator
!
- klV File
!
- FIP5 File
!
Lisa !hea, RM/ALF (MS 4503)
!
A. Adan,:, NRR Project Manager (MS 11 B20)
'l
J. L. Caldwell, NRR (MS 10 D22)
{
- w/ IFS
i
!
i
f
i
i
I
i
!
>
.
t
[
t
L
!
'
i
!
i
!
4
!
1
!
,
i
a
-
]
L
l
%'
!
RIV:FIPS$)
h,
DD3DRS6'
D:DRS$
i
C:FIPS
-.
,
,
WLHolley:nh
BMurray $
DDPha berlain
LJCallan
,
!,
U_ /hh93
k Q\\/93
/
/9b
%/893
/
,
- ,
,
,
!
!
>
.
..
-. -
- ..
!
l
-
$.
.
The University of Texas
-3-
at Austin
.
bec to DMB (IE01)
bcc:
l
J. L. Milhoan, RA
L. J. Callan, DRSS
,
- B. Murray, FIPS
- W. L. Holley, FIPS
i
j
- DRS
~
- MIS Coordinator
.
- RIV File
,
- FIPS File
!
Lisa Shea, RM/ALF (MS 4503)
l
A. Adams, NRR Project Manager (MS 11 820)
'
J. L. Caldwell, NRR (MS 10 D22)
l
- w/ IFS
I
i
I
,
,
)
i
e
RIV:FIPS
C:FIPS h
D}hDRS5'
D:DRSM _
t
v
y
cr-
DD0fiakberlain
LJCallan
WLHolley:nh
BMurray V
'
U/h93
k Q\\/93
!/ /9'E
% /+T93
-y
-s
g-
,
t
. -
.