DES
.
.
APR 19 m3
Docket Nos. 50-277
50-278
Mr. D. M. Smith
Senior Vice President-Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT: COMBINED INSPECTION NOS. 50-277/93-08; 50-278/93-08
This letter transmits the findings of the special safety inspection conducted by
Messrs. A. L. Burritt and S. L. Hansell of this office from March 22 through
March 26,1993, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. At the
conclusion of the inspection, Mr. Hansell held discussions of our findings with members of
your staff.
The inspection was in the area of plant operations. The primary objective was to ensure that
the facility's ope. rations department conducted activities in a safe manner and in accordance
with both regulaory requirements and licensee approved procedures. A secondary objective
was to assess the interface and support between operations and the other departments as these
interactions occurred. Within the area, the inspection consisted of interviews with personnel,
observations by the inspector, and examinations of selected procedures and records.
In summary, operations were conducted safely, in accordance with regulatory requirements
and, in most instances, in accordance with licensee approved procedures. A strength was
noted in that the Alarm Response Cards contained detailed information and were routinely
used by the operations personnel.
There were two items of concern. The first was the operating shift's decision which resulted
in a reactor protection system bypass for the main turbine without pursuing a temporary
procedure change to accomplish the task. The second was the plant decision process to use
the Troubleshooting, Minor Rework, and Test Support (TMT) procedure instead of the
Clearance and Tagging procedure in one instance which could result in reduced personnel
OFFICIAL RECORD COPY
G:PB9308. OPS
I
i
0
\\
9304260028 930419
\\
ADOCK 05000277
\\
O
A
,
. -
-
,
,
t
!
Mr. D. M. Smith
2
- pg ;
7333
i
safety. The facility has committed to conduct a formal review of both concerns. The details
for these two items are contained in report sections 3.6 and 3.7 respectively.
l
t
Within the scope of this inspection, no unresolved items or violations were identified. We
appreciate your cooperation.
r
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
,
Sincerely,
f
Odyns! Si2ned By:
LE: li. httnhem?n
>
Ixe H. Bettenhausen, Chief
.
Operations Branch
Division of Reactor Safety
i
Enclosure: NRC Region I Combined Inspection
'
Report Nos 50-277/93-08; 50-278/93-08
.
,
!
,
E
!
!
i
OFFICIAL RECORD COPY
G:PB9308. OPS
!
t
,
9
<
.
i
.
Mr. D. M. Smith
3
Mi
'Ja
l
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
l
G. Rainey, Vice President, Nuclear Senices Department
G. Cranston, General Manager, Nuclear Engineering Division
!
C. Schaefer, External Operations - Nticlear, Delmana Power & Light Co.
K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station
l
A. J. Wasong, Manager, Experience Assessment
,
I
G. A. Hunger, Jr., Manager, Licensing Section
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department,
Atlantic Electric
B. W. Gorman, Manager, External Affairs
l
R. Mclean, Power Plant Siting, Nuclear Evaluations
'
D. Poulsen, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
,
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
i
Public Document Room (PDR)
[
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
,
NRC Resident Inspector
,
Commonwealth of Pennsylvania
TMI - Alert (TMIA)
j
r
.
.
!
Y
l
OFFICIAL RECORD COPY
G:PB9308. OPS
l
.
m
-
.
Mr. D. M. Smith
4
App i g 79g3
bec w/ enc 1:
Region I Docket Room (with concurrences)
L. Bettenhausen, DRS
E. Wenzinger, DRP
C. Anderson, DRP
R. Conte, DRS
DRS/EB SALP Coordinator
V. McCree, OEDO
J. Shea, NRR -
S. A. Arredondo, DRSS
A. Burritt, DRS
S. Hansell, DRS
DRS Files (2)
RI:DRS
RI:DRS
RI:DRS
Hansell/dmg
Cont
B enhausen
/
'3
fu't 4hM
/
04/12/93
04('p93
04/M/93
OFFICIAL RECORD COPY
G:PB9308. OPS
,
.
.
. _ .
..
.
.
-
~