Forwards Safety Insp Repts 50-277/93-08 & 50-278/93-08 on 930322-26.Operations Conducted Safely & Strength Noted in That Alarm Response Cards Contained Detailed Info Routinely Used by Operations Personnel
ML20035G015
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/19/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20035G016 List:
References
NUDOCS 9304260028
Download: ML20035G015 (4)


See also: IR 05000277/1993008

Text

DES

.

.

APR 19 m3

Docket Nos. 50-277

50-278

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION NOS. 50-277/93-08; 50-278/93-08

This letter transmits the findings of the special safety inspection conducted by

Messrs. A. L. Burritt and S. L. Hansell of this office from March 22 through

March 26,1993, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. At the

conclusion of the inspection, Mr. Hansell held discussions of our findings with members of

your staff.

The inspection was in the area of plant operations. The primary objective was to ensure that

the facility's ope. rations department conducted activities in a safe manner and in accordance

with both regulaory requirements and licensee approved procedures. A secondary objective

was to assess the interface and support between operations and the other departments as these

interactions occurred. Within the area, the inspection consisted of interviews with personnel,

observations by the inspector, and examinations of selected procedures and records.

In summary, operations were conducted safely, in accordance with regulatory requirements

and, in most instances, in accordance with licensee approved procedures. A strength was

noted in that the Alarm Response Cards contained detailed information and were routinely

used by the operations personnel.

There were two items of concern. The first was the operating shift's decision which resulted

in a reactor protection system bypass for the main turbine without pursuing a temporary

procedure change to accomplish the task. The second was the plant decision process to use

the Troubleshooting, Minor Rework, and Test Support (TMT) procedure instead of the

Clearance and Tagging procedure in one instance which could result in reduced personnel

OFFICIAL RECORD COPY

G:PB9308. OPS

I

i

0

\\

9304260028 930419

\\

PDR

ADOCK 05000277

\\

O

PDR

A

,

. -

-

,

,

t

!

Mr. D. M. Smith

2

pg ;

7333

i

safety. The facility has committed to conduct a formal review of both concerns. The details

for these two items are contained in report sections 3.6 and 3.7 respectively.

l

t

Within the scope of this inspection, no unresolved items or violations were identified. We

appreciate your cooperation.

r

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

,

Sincerely,

f

Odyns! Si2ned By:

LE: li. httnhem?n

>

Ixe H. Bettenhausen, Chief

.

Operations Branch

Division of Reactor Safety

i

Enclosure: NRC Region I Combined Inspection

'

Report Nos 50-277/93-08; 50-278/93-08

.

,

!

,

E

!

!

i

OFFICIAL RECORD COPY

G:PB9308. OPS

!

t

,

9

<

.

i

.

Mr. D. M. Smith

3

Mi

'Ja

l

cc w/ encl:

J. Doering, Chairman, Nuclear Review Board

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

l

G. Rainey, Vice President, Nuclear Senices Department

G. Cranston, General Manager, Nuclear Engineering Division

!

C. Schaefer, External Operations - Nticlear, Delmana Power & Light Co.

K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station

l

A. J. Wasong, Manager, Experience Assessment

,

I

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department,

Atlantic Electric

B. W. Gorman, Manager, External Affairs

l

R. Mclean, Power Plant Siting, Nuclear Evaluations

'

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

,

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

i

Public Document Room (PDR)

[

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

,

NRC Resident Inspector

,

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

j

r

.

.

!

Y

l

OFFICIAL RECORD COPY

G:PB9308. OPS

l

.

m

-

.

Mr. D. M. Smith

4

App i g 79g3

bec w/ enc 1:

Region I Docket Room (with concurrences)

L. Bettenhausen, DRS

E. Wenzinger, DRP

C. Anderson, DRP

R. Conte, DRS

DRS/EB SALP Coordinator

V. McCree, OEDO

J. Shea, NRR -

S. A. Arredondo, DRSS

A. Burritt, DRS

S. Hansell, DRS

DRS Files (2)

RI:DRS

RI:DRS

RI:DRS

Hansell/dmg

Cont

B enhausen

/

'3

fu't 4hM

/

04/12/93

04('p93

04/M/93

OFFICIAL RECORD COPY