ML20035G011
| ML20035G011 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/16/1993 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stratman R CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| CAL-RIII-93-07, CAL-RIII-93-7, NUDOCS 9304260024 | |
| Download: ML20035G011 (4) | |
Text
- _ _ - _ _ _ _ - - _
n..
APR 161993 e,
Centerior Service Company ATTN: Mr. R. A. Stratman Vice President Nuclear - Perry c/o The Cleveland Electric Illuminating Company 10 Center Road Perry, OH 4408I
SUBJECT:
CONFIRMATORY ACTION LETTER (CAL) RIII-93-007
Dear Mr. Stratman:
This confirms the conversation on April 16, 1993, between Messrs. W. L. Forney and R. D. Lanksbury of my staff and you related to problems being experienced at Perry with fouling and deformation of RHR strainers in the suppression pool. With respect to the Perry plant matters discussed, we understand that you will perform the following actions:
I.
Conduct an investigation to determine the cause of the reduced capability of the RHR pump strainers located in the suppression pool.
Include in your evaluation consideration of design adequacy, reasons for fouling, and reasons for any deformation.
l 2.
Maintain documentary evidence of your investigation effort and make this available to the NRC.
3.
Prior to startup, provide Region III with your basis for considering the ECCS suppression pool strainers to be capable of performing their required design function.
4.
Prior to startup, provide Region III with your plans and a commitment to ensure that the suppression pool is maintained at an acceptable level of cleanliness, including any surveillances you plan to perform.
5.
Provide within 30 days to NRC Region III a documented evaluation of the above issues including any additional corrective actions you have taken-or plan to take.
In your report you will describe the basis for considering the RHR system to be capable of performing its safety function during past operation, particularly in light of the problems 1 0 identified in RF03.
9304260024 930416 PDR ADOCK 05000440 P
PDR i
W APR 161993 Centerior Service Company 2
l None of the actions specified herein should be construed to take precedence over actions which you feel necessary to ensure plant and personnel safety.
i Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, and 10 CFR 2.204, you are required to:
I.
Notify me immediately if your understanding differs from that set forth above.
2.
Notify me if for any reason you cannot complete the actions within the specified schedule and advise me in writing of your modified schedule in advance of the change, and 3.
Notify me in writing when you have completed the actions addressed in this Confirmatory Action Letter.
j Issuance of this Confirmatory Action Letter does not preclude issuance of an Order formalizing the above commitments or requiring other actions on the part of the Perry Nuclear Power Plant. Nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of this letter.
In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
t Sincerely, ORIGINAL SIGNED BY HUBERT J. MILLER A. Bert Davis Regional Administrator i
See Attached Distribution t
i i
i RIII RIII RIII RIII RIII RIII g.-_._____--~
Cn dtM h -em s
v i
Lanksbury Greger Greenman Martin Hannon Berson i
i RIII RIII RIII w atwLL k.. m r
DeFayette 1er v's l
Centerior Service Company 2
l None of the actions specified herein should be _ construed to take precedence over actions which you feel necessary to ensure plant and personnel safety.
l If your understanding differs from that set forth above, please call me immediately.
Issuance of this Confirmatory Action Letter does not preclude issuance of an Order formalizing the above commitments or requiring other actions on the part of the Perry Nuclear Power Plant. Nor does it preclude NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of this letter.
Sincerely, l
i A. Bert Davis Regional Administrator l
\\
l l
See Attached Distribution i
l l
1 l
\\e$
h RIII RIII RIII RIII RIII RIII 1
Wafh
/\\'bbdi 2,
g,r yjg, 3
he n
Martin Hann n Derson j
La bury Gr er
$ y//
3 4'
"j R vgig
<tlit RIII RIII RIII RWY g
D F y tte Miller Davis t
i
]
l APR 161993 Centerior Service Company 3
i i
l-l Distribution l
l cc.
F. R. Stead, Director, Nuclear l
Support Department l
D. P. Igyarto, General Manager, t
Perry Nuclear Power Plant i
K. P. Donovan, Manager, Licensing and Compliance Section S. F. Kensicki, Director, Perry Nuclear Engineering Dept.
l i
H. Ray Caldwell, General j
Superintendent Nuclear Operations l
OC/LFDCB Resident Inspector, RIII I
Terry J. Lodge, Esq.
James R. Williams, State of Ohio l
Robert E. Owen, Ohio Public Utilities Commission j
l A. Grandjean, Ohio Public Utilities Commission l
State Liaison Officer J. M. Taylor, EDO j
J. H. Sniezek, DEDR H. L. Thompson, DEDS T. E. Murley, NRR J. G. Partlow, NRR J. W. Roe, NRR F. J. Miraglia, NRR t
l J. A. Zwolinski, NRR i
E. L. Jordan, AE0D J. Lieberman, OE J. R. Goldberg, OGC l
J. N. Hannon, NRR G. Grant, EDO J. E. Richardson, NRR H. J. Miller, RIII R. J. Strasma, RIII j
L. R. Greger, RIII R. D. Lanksbury, RIII l
bec:
PUBLIC i
i i
i
)
4 l
~!