ML20035F582

From kanterella
Jump to navigation Jump to search
Confirms Plans to Visit GE Panthers Test Facility at Siet Labs in Piacenza,Italy on 930423.Proposed Draft Agenda Encl. Discussion Topics Include,Configurations for Passive Containment Cooling Sys HX Tests
ML20035F582
Person / Time
Site: 05200004
Issue date: 01/14/1993
From: Levin A
Office of Nuclear Reactor Regulation
To: Appajosula Rao
GENERAL ELECTRIC CO.
Shared Package
ML20035F580 List:
References
NUDOCS 9304220052
Download: ML20035F582 (2)


Text

>_

40 *'4

>/

9'o V

g.

UNITED STATES

[.

f NUCLEAR REGULATORY COMMISSION 7,;

rj

' WASHINGTON, D. C. 20555

\\

}

\\

January 14, 1993 Dr. Atam S. Rao General Electric Nuclear Energy M/C 754 i

175 Curtner Avenue San Jose, CA 95125

Dear Dr. Rao:

I Per our conversation earlier this month, I am writing to confirm plans to visit the GE PANTHERS test facility SIET Laboratories in Piacenza, Italy on i

April 23, 1993.

The NRC contingent has not been completely determined at this

.)

with perhaps one.or two additional people.date; current plans inclu makeup of the group as soon as it has been settled.I will let you know the. final A proposed draft agenda for the visit is enclosed.

between 9 and 10 a.m., breaking for lunch at around noon or slightly later, and reconvening between 2 and 2.:30 p.m. for about three more hours (if-i needed).

At this time, we do not plan to visit the PANDA facility at Paul Scherrer Institute.

I will let you know if those plans change. However, as I noted in our conversation, Mr. William' Russell is planning a trip, probably in July, to-cover containment-related testing, which would most likely include PANDA.-

Please let me know if the proposed schedule and agenda are acceptable.

suggestions regarding' travel logistics in and around Piacenza (e.g., hotel.-Any accommodations, local travel, and travel'between.Piacenza and Linate Airport-in Milan) would be greatly appreciated. Please contact me at (301)504-2890 if-i you have any questions. Thanks for your assistance.

Sincerely yours,-

\\.

Alan

. Levin Senior Reactor Systems Engineer Reactor Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation o

i cc:

J. W. Thompson Enclosure e

930422o052 930419 ADOCK 052 g 4

=

-PDR

,A

Draft Agenda for Meeting at SIET

^

GE PANTHERS Separate Effects SBWR Heat Exchanger Test Facility April 23, 1993 Overview of PANTHERS Facility and Test Program Configurations for passive containment cooling system heat exchanger tests Configuration for isolati.on condenser heat exchanger tests Instrumentation and data acquisition Proposed test matrices Planned post-test analysis Schedule for PANTHERS testing and submittal of test reports to NRC Tour of PANTHERS facility 9

9

.