d' J
t UNITED STATES j
j NUCLEAR REGULATORY COMMISSION s
c
.usmcTON o c 20sss occi
, '..... ~,
April 16, 1993 Docket Nos. 50-277 and 50-278 Mr. Robert C. Mitchell Project Manager-Safety and Communications General Electric Company 175 Curtner Avenue San Jose, California 95125
Dear Mr. Mitchell:
By letter dated April 1,1993, Philadelphia Electric Company (PECo) submitted an application requesting a change to the Peach Bottom Atomic Power Station, l
Unit Nos. 2 and 3 Technical Specifications.
The proposed changes implement an expanded operating domain for the facility.
In support of the application, PECo submitted NEDC-32162P, Revision 1, " Maximum Extended Load Line Limit and ARTS Improvement Program Analyses for Peach Bottoms Atomic Power Station Unit 2 and 3."
Included in PECo's application was your affidavit requesting that NEDC-32162P be withheld from public disclosure pursuant to 10 CFR Part 2.790.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
1.
The information discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without a license from General Electric constitutes a competitive economic advantage over other companies.
2.
The information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar project.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of General Electric's statements, have determined that the submitted infornation sought to be withheld contains trade secrets or proprietary commercial information.
Therefore, NEDC-32162P, Revision 1, entitled " Maximum Extended Load Line Limit and ARTS Improvement Program Analyses for Peach Bottoms Atomic Power Station Unit 2 and 3" marked as proprietary, will be withheld from public disclosure pursuant 10 CFR Part 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
rma e " [I
}f (f ) 1 9304210345 930416 UN
('
PDR ADOCK 05000277 P
PDR p1
Mr. Robert C. Mitchell April 16, 1993 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed _the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should j
change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincer ly, f
J seph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page
l 1
Mr. Robert C. Mitchell April 16, 1993 Withholding from public inspection shall not affect the right, if any, of l
persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request 1
includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any l
public disclosure.
Sincerely, original signed by:
Joseph W. Shea, Project Manager Project Directorate 1-2 l
Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation i
cc: See next page Distribution:
Docket File M0'Brien CAnderson, RGN-I NRC & Local PDRs JShea RJones, 8/E/23 PDI-2 Reading MPSiemien, OGC l
SVarga ACRS (10)
JCalvo JWhite, RGN-I CMiller EWenzinger, RGN-I
{\\
Y i;
0FC
- PD
- PDF,2 PM :SRXB
- 0GC
- PDI-2/D NAME :M0'Brien :JStea:smm :RJoner
- MPSiemien :Cf g
h/93
- y/g93 DATE
//3/93
/p>93
- q j[y93 I
l r
i l
l Peach Bottom Atomic Power Station, i
l l
Philadelphia Electric Company Units 2 and 3 c
CC:
J. W. Durham, Sr., Esquire Mr. William P. Dornsife, Director Sr. V.P. & General Counsel Bureau of Radiation Protection Philadelphia Electric Company Pennsylvania Department of 2301 Market Street, S26-1 Environmental Resources Philadelphia, Pennsylvania 19101 P. O. Box 2063 i
Harrisburg, Pennsylvania 17120 Philadelphia Electric Company ATTN: Mr. D. B. Miller, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township Route 1, Box 208 R. D. #1 Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Philadelphia Electric Company Public Service Commission of Maryland ATTN:
Regulatory Engineer, Al-2S Engineering Division Peach Bottom Atomic Power Station ATTN:
Chief Engineer Route 1, Box 208 231 E. Baltimore Street Delta, Pennsylvania 17314 Baltinre, MD 21202-3486 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, Pennsylvania 17314 B-3, Tawes States Office Building Annapolis, Maryland 21401 Regional Administrator, Region I 1
U.S. Nuclear Regulatory Commission George A. Hunger, Jr.
475 Allendale Road Director-Licensing, MC 52A-5 King of Prussia, Pennsylvania 19406 Philadelphia Electric Co.
Nuclear Group Headquarters
]
l Mr. Roland Fletcher Correspondence Control Desk Department of Environment P.O. Box No. 195 201 West Preston Street Wayne, PA 19087-0195 Baltimore, Maryland 21201 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 i
1 i
- >