Text

l ~N o

s o PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:

a.

Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency busses, and b.

One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a.

With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.

SURVEILLANCE RE0VIREMENTS 4.7.1.2.1 Each auxiliary f?edwater pump shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by:

1)

Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1605 psig at a flow of greater than or equal to 150 gpm (FI-15101, FI-15102);

2)

Verifying that the steam turbine-driven pump develops a dis-charge pressure of greater than or equal to 1675 psig at a flow of greater than or equal to 145 gpm (FI-15100) when the secon-dary steam supply pressure (PI-5105A, PI-5105B) is greater than 900 psig.

The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

V0GTIF tlNTTR 1 L 7 3/4 7-4 9304210268 93Kb419 PDR ADOCK 05000424 p

PDR

b%

i

(.

i CONTAINMENT $YSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES i

LIMITING CONDITION FOR OPERATION 3.6.3 The containment isolation valves shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With one or more of the containment isolation valve (s) inoperable, maintain at least one isolation valve OPERABLE in each affected penetration that is open and:

a.

Restore the inoperable varve (s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or b.

Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use t' at least one deactivated automatic valve secured in the isolation r osition, or c.

Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange, or d.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

e.

The provisions of Specification 3.0.4 are not applicable provided i

that the affected penetration is isolated in accordance with ACTION b or c above, and provided that the associated system, if applicable, is declared inoperehle and the appropriate ACTION statements for that system are performed.

SURVEILLANCE REQUIREMENTS 4.6.3.1 The containment isolation valves shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance of a cycling test, and verification of isolation time.

l l

V0GTLE UNITS - 1 & 2 3/4 6-16