Ack Receipt of 920928 Response to GL 92-04.Licensee Commitment to Submit follow-up Response Identifying Planned Actions & Schedule to Reach Resolution on Issue Acceptable
ML20035F397
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/08/1993
From: Baker E
Office of Nuclear Reactor Regulation
To: Graham P
GULF STATES UTILITIES CO.
References
GL-92-04, GL-92-4, TAC-M84300, NUDOCS 9304210241
Download: ML20035F397 (3)


Text

[an%~%,

UNITED STATES l

8 NUCLEAR REGULATORY COMMISSION c

WASHINGTON, D. C. 20555 gv,/

April 8,1993 a

5

....+

l Docket No. 50-458 l

Gulf States Utilities ATTN:

Philip D. Graham Vice President (RBNG)

Post Office Box 220 l

St. Francisville, Louisiana 70775 l

l

Dear Mr. Graham:

1

SUBJECT:

RESPONSE TO GENERIC LETTER 92-04 ' RESOLUTION OF THE ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BOILING WATER REACTORS" (MS4300)

This letter acknowledges receipt of your response to Generic Letter (GL) 92-04, dated September 28, 1992.

GL 92-04 was issued by letter dated August 19, 1992, to all operating Boiling Water Reactor (BWR) licensees. GL 92-04 requested licensees to promptly assess the impact on their facilities of potentially erroneous level indication due to non-condensible gases, and to implement compensatory measures and long-term corrective actions as necessary.

We find acceptable:

(1)

Gulf States Utilities (GSU) review and acceptance of the BWR Owners' Group (BWROG) generic analysis as being applicable to the River Bend Station.

(2)

GSU's endorsement of the BWROG comitment, outlined in its letter dated August 12, 1992, regarding schedule and plans for actions to address postulated errors in BWR water level instrumentation.

(3)

GSU's endorsement of the BWROG's Emergency Procedures Comittee guidance letter dated August 19, 1992. This letter provides guidance for operator action in the event of level indication errors due to non-condensible gases during reactor pressure vessel (RPV We also understand that you have sensitized your opera) tors to thesedepressuriza potential errors consistent with the BWROG guidance.

(4)

GSU's comitment to submit a follow-up response to this generic letter identifying your planned actions and schedule to reach resolution on this issue. We request that you provide this response by July 30, 1993.

On October 23, 1992, the BWROG approved refined operator guidance developed by the Emergency Procedures Comittee, sent to your Operations Superintendent on 9304210241 930408 DR ADOCK 0500 8

m a nu. -

m.

G{

b O

(

t j

April 8,1993

~

Mr. Philip D. Graham,

October 16, 1992, for response to instrument errors due to non-condensible i

gases. We feel that this guidance provides appropriate information for operators to adequately identify and deal with potentially inaccurate RPV l

level instrumentation, and expect that this or equivalent guidance, has been i

incorporated into your station operations.

l

)

Should you have any questions, please contact me at (301) 504-1386.

l Sincerely,

{

i Original Signed By

)

1 Edward T. Baker, Senior-Project Manager i

1 Project Directorate IV-2 i

1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION Docket File.

NRC PDR Local PDR i

PDIV-2 RfF PDIV-2 P/F JRoe i

MVirgilio l

EBaker EPeyton OGC ACRS (10) i EJordan i

JGagliardo, RIV RJones JClifford 4

j i

i OFFICE PD}V.2/LA PDIV-2/PM PDIV-2/D RXSB[

N EPeytEd EBaker:ye SBlacd

.o m J. es 5 g3 9f yjg3 (ff fg3 5 g3 1/ pf hf f

f DME (E7M0 kE$/NO YES/M

[/YES M YES/NO con 0FFICIAL RECORD COPY FILENAME: B:\\GL9204.RBS l

i Mr. Philip D. Graham

-3_

April 8, 1993 t

l i

CC:

7 Winston & Strawn Ms. H. Anne Plettinger I

ATTN: Mark J. Wetterhahn, Esq.

3456 Villa Rose Drive 1400 L Street, N.W.

Baton Rouge, Louisiana 70806 Washington, D.C. 20005-3502 l

Administrator Mr. Les England Louisiana Radiation Protection Division 1

Director - Nuclear Licensing P. O. Box 82135 Gulf States Utilities Company Baton Rouge, Louisiana 70884-2135 l

a St. Francisv111e, Louisiana 70775 1

Mr. Philip G. Harris Cajun Electric Power Coop, Inc.

10719 Airline Highway P. O. Box 15540 Baton Rouge, Louisiana 70895 l

1 Senior Resident Inspector i

P. O. Box 1051 St. Francisville, Louisiana 70775 l

President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, Louisiana 70775 I

Regional Administrator, Region IV j

U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 j

Mr. J. E. Booker Manager-Nuclear Industry Relations Gulf States Utilities P. O. Box 2951 Beaumont, Texas 77704 Mr. J. David McNeill, III William G. Davis, Esq.

Department of Justice Attorney General's Office

t P. O. Box 94095 Baton Rouge, Louisiana 70804-9095 i

I.

O

_-y..

m -,, - - -

y r--r-r-