ML20035F384

From kanterella
Jump to navigation Jump to search
Notification of 930422 Meeting w/ABB-CE in Rockville,Md to Discuss Certification Review of Sys 80+.Licensee Will Be Making Presentation to Commission on 930423.Meeting Agenda Encl
ML20035F384
Person / Time
Site: 05200002
Issue date: 04/19/1993
From: Wambach T
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9304210222
Download: ML20035F384 (4)


Text

[

UNITED STATES E'

~g,

  • NUCLEAR REGULATORY COMMISSION c.

f g

wAssincioN. o. c.20sss

\\...../

April 19, 1993 Docket No.52-002 MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, EDO A. Gody, Acting B. D. Liaw A. Vietti-Cook l

S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU:

Richard W. Borchardt, Acting Director * [

Standardization Project Directorate Associate Directorate for Advanced Reastors and License Renewal Office of Nuclear Reactor Regulation FROM:

Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation r

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING SENIOR MANAGEMENT MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE)

DATE AND TIME:

April 22, 1993 (1 p.m. - 4 p.m.)

l LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 12-B-11 PURPOSE:

For management to discuss the status of the certification review of the System B0+.

ABB-CE will be making a presentation to the Commission on April 23, 1993. Topics to be discussed are provided in the enclosed agenda.

L b

210023 W. " 7 '" ? TI~*i M @ V, l,

u.m.

9304210222 930419 d)

PDR ADOCK 0520 2

g

i

. April 19, 1993 PARTICIPANTS *:

HRC ABB-CE W. T. Russell R. Matzie D. M. Crutchfield C. Brinkman R. W. Borchardt J. Longo T. Essig L. Gerdes G. Holahan S. Ritterbusch F. Congel K. Scarola B. D. Liaw B. Boger T. Wambach M. Franovich S. Magruder (Original signed by M. Franovich for)

Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc:

See next page

  • Meetings between the NRC technical staff and applicants or licensees-are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1103.

DISTRIBUTION:

Docket File PDST R/F SBajwa, 12G18 RBorchardt POR JNWilson TVWambach MXFranovich i

PShea OPA EJordan, MNBB 3701 GGrant, EDO ACRS (11)

P0' Dell, PTSB JMoore, 15B18 RPerch, 8H7-

)

NRR Mailroom,12G18 CMcCracken, 8D1 AChaffee, EAB MPratt, 7E4 SMagruder TEssig

. yh' 0FC:

LA:PDST:ADAR PMifDST:

ADAR SC:P, DST:ADAR s

i c

NAME:

PSh

,4 TWamb$ch:tz jffEffsg 04f%

04/i7/93 04/d/93 DATE:

0FFICIAL DOCUMENT COPY:

CM0422.TVW 1l

)

ABB-Combustion Engineering, Inc.

Docket No.52-002 cc:

Mr. Regis A. Matzie,.Vice President Nuclear Systems Development Combustion Engineering, Inc.

1000 Prospect Hill Road

- 3 Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Acting Director i'

Nuclear Systems Licensing Combustion Engineering, Inc.

1000 Prospect Hill Road j

Windsor, Connecticut 06095-0500 1

Mr. C. B. Brinkman, Manager Washington Nuclear Operations

]

Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 3

3 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing 1

Combustion Engineering, Inc.

l 1000 Prospect Hill Road l

Post Office Box 500 1

Windsor, Connecticut 06095-0500 i

Mr. Sterling Franks U. S. Department of Energy NE-42

)

Washington, D.C.

20585 i

Mr. Steve Goldberg l

Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng i

1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 i

Joseph R. Egan, Esquire i

Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W._

j Washington, D.C.

20037-1128 l

l 4

i

\\-

SENIOR MANAGEMENT MrITING WITH ABB-CE 3

APRIL 22, 1993 1

AGENDA INTRODUCTION l

TECHNICAL ISSUES Human Factors Engineering i

Source Term Severe Accidents Probabilistic Risk Assessment / Shutdown Risk Assessment Structural Design Details Intersystem Loss-of-Coolant Accident Instrumentation & Control Diversity i

ADMINISTRATIVE ISSUES STATUS

[

Inq ections, Tests, Analyses, and Acceptance Criteria Integrated Review Metrication Design Control Document Schedule Need to reacn closure Need to achieve milestone of final design approval ABB-CE plans and commitment t

I r

4 e

i 9

Enclosure

.1

,