Forwards Matrix of Implementing Procedures & Documents,Per Telcon W/T Matula.All Procedures & Required Training Will Be Completed by 930430
ML20035F178
Person / Time
Site: 07100179
Issue date: 04/16/1993
From: Arnold W
NUCLEAR CONTAINERS, INC.
To: Mcdonald C
NRC
References
NUDOCS 9304210009
Download: ML20035F178 (5)


Text

/7/'-0/'7f

/

N NUCLEAR CONTAINERS, INC.

O cnemicei a nocieer - anoineerino ena equipment reericetion

' g 1

Route 9, Box 2237 - Elizabethton, Tennessee 37643 f

Telephone: 615/543-4211 Fax: 615/543-6007 1

I i

April 16, 1993 Mr. Chuck Mcdonald

!!uclear Regulatory Cominission 1.'.535 Rockville Pike Rockville, MD 20852

Dear Mr. Mcdonald:

Please.fa.nd enclosed the matrix as per my phone conversation with Mr.

T o rt Matula.

All procedures and required training vill be completed by April 30, 1993.

l Very truly yours, L) bx, -[ix,

William M.

Arnold Operationn Hanager WMA/ dig 210007 3

IC i

4210009 930416 3 )

ADOCK 07100179 l

C Phi

Nuclear Containers, Inc.

Matrix of Implementing Procedures & Documents Document Titles 10CFR71, Subpart H Title Section OA-3, Rev.1 Quality Assurance 71.103 Organization SOP 1.0 Preparation & Approval of NCI Procedures OA-3, Rev.1 Ouality Assurance 71.105 Program SOP 1.0 Preparation & Approval of NCI Procedures SOP 1.1 Indoctrination & Training SOP 1.2 Control of Procedures SOP 9.6 10CFR21 Deviations SOP 9.7 Collection, Storage & Maintenance of Quality Assurance Records OA-3, Rev.1 Package Design 71.107 Control SOP 2.0 Control of Certified Design Drawings within 1

Engineering i

SOP 2.1 Development & Control of Fabrication Drawings Within Engineering OA-3, Rev.1 Procurement 71.109 Document Control SOP 3.0 Vendor Selection & Approval SOP 3.1 Procurement of Materials, Parts, Services &

Welding Material OA-3, Rev.1 Instructions, 71.111 Procedures &

SOP 1.1 Indoctrination & Training Drawings SOP 1.3 Documentation Entries & Material Identities SOP 2.2 Drawing Control OA-3, Rev.1 Document Control 71.113 SOP 1.2 Control of Procedures SOP 9.7 Collection, Storage & Maintenance of Quality Assurance Records Page 1 of 4

[

i On-3, Rev.1 Control of Purchased 71.115 Material, Equipment SOP 3.0 '

Vendor Selection & Approval

& Services n

SOP 3.1 Procurement of Materials, Parts, Services &

Welding Materials j

i SOP 7.7 Control of Procurement of Special i

Consumable NDE Materials

_j 1

OA-3, Rev.1 Identification &

71.117 -

Control of Materials, l

SOP 9.8 Maintenance.of Traceability Parts & Components

i i

OA-3, Rev.1 Control of Special 71.119 j

Processes i

SOP 4.0 Control of Fabrication - Production Manager

-t SOP 4.1 Control of Fabrication - Area Foreman SOP 4.2 Control of Fabrication - Material Expediter.

1 I

SOP 43 Control of Fabrication - Layerout SOP 4.4 Control of Fabrication - Burner l

SOP 4.5 Control of Fabrication - Fitter Trainee i

SOP 4.6 Control of Fabrication - Fitter i

SOP 4.7 Control of Fabrication - Welders & Welding Operators -

l SOP 5.0 Welder / Welding Operation Qualification l

Procedures j

i SOP 6.3 Stainless Steel Cleaning SOP 6.4 Painting Controls i

i i

i SOP 6.5 Phenolic Foam Installation OA-3, Rev.1 Internal Inspection 71.121 SOP 10.0 Auditing SOP 10.1 Oualification & Certification of Auditing

[

Personnel f

OA-3, Rev.1 Test Control 71.123 i

SOP 7.7 Control of Procurement of Special l

Consumable NDE Material i

Page 2 of 4 l

I QA-3, Rev.1 Control of Measuring 71.125

& Test Equipment SOP 8.0, Calibration & Verification of Measuring &

l Testing Equipment QA-3, Rev.1 Handling, Storage &

71.127 Shipping Control SOP 9.5 Control of Handling, Storage, Loading &

Shippi ;

QA-3, Rev.1 Inspection, Test &

71.129 Operating Status Manufacturing Outline QC Plan i

SOP 6.3 Stainless Steel Cleaning SOP 6.4 Painting Controls SOP 6.5 Phenolic Foaming SOP 7.0 0 & C of Nondestructive Testing Personnel SOP 7.1 U.T. Digital Thickness SOP 7.2 Liquid Penetrant Examination in Accordance with AWS D1.1 & D1.5 SOP 7.3 Visual Examination in Accordance with ASME Boiler & Pressure Vessel SOP 7.4 Administration of Eye Examinations to Inspection Personnel SOP 75 Magnetic Particle Examination in Accordance with A% ' ")1.1 SOP 7.6 Ultrasonic Examination in Accordance with AWS D1.1 & D1.5 QA-3, Rev.1 Nonconforming 71.131

. Materials, Parts or i

SOP 9.1 Non-conforming Items & Corrective Action Components SOP 9.9 Non-conformance Accountability, Trending i

& Evaluations Page 3 of 4

+

e

QA-3, Rev.1 Corrective Action 71.133 SOP 9.1 Non-conforming Items & Corrective Action SOP 9.9 Non-conformance Accountability, Trending

& Evaluations a

QA-3, Rev.1 Quality Assurance 71.135 Records

[

SOP 9.7 Collection, Storage and Maintenance of Quality Assurance Records l

2 QA-3, Rev.1 Audits 71.137 SOP 10.0 Auditing b

a t

l i

s i

I i

d y

l l

I

?

g-i a

J l

[

4 I

i i

i 1

'I i

4 h

Page 4 'of 4 n