ML20035E930

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/93-12 & 50-446/93-12 on 930218- 0303 & Notice of Deviation
ML20035E930
Person / Time
Site: Comanche Peak  
Issue date: 04/14/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20035E931 List:
References
NUDOCS 9304200085
Download: ML20035E930 (5)


See also: IR 05000445/1993012

Text

o

UNITED STATES

ff

B t cg)

gD

.,

g

NUCLEAR REGULATORY COMMISSION

)[l

REGloN IV

[

611 RY AN PLAZ A DRIVE, SUIT E 400

o

e

ARLINGTON TEXAS 76011-0064

""**

APR I 41993

Docket:

50-445

50-446

License: NPF-87

NPF-89

TU Electric

ATTN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

SUBJECT: NRC INSPECTION REPORT 50-445/93-12; 50-446/93-12 (NOTICE OF

<

DEVIATION)

This refers to the inspection conducted by Mr. W. B. Jones, and the inspectors

identified in the enclosed report, of this office, on February 18 through

March 3, 1993. The inspection included a review of activities authorized for

the Comanche Peak Steam Electric Station, Units 1 and 2, facility. At the

conclusion of the inspection, the findings were discussed with you and those

members of your staff identified in the enclosed report.

Areas examined during the inspection included a review of your programmatic

efforts to enhance personnel performance and reduce personnel errors,

sustained control room and in-plant observations, and an evaluation of your

corrective actions taken in response to previously identified inspection

findings. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

i

personnel, and observation of activities in progress.

j

Based on the results of this inspection, certain of your activities appeared

to deviate from your commitment to reconcile the Unit I work request tags

existing in the field with the outstanding work database. As specified in the

enclosed Notice of Deviation (Notice), this commitment was to be completed by

the end of the fourth quarter of 1992 as documented in your response to Notice

of Violation 445/9214-01.

We are concerned about the deviation because an NRC

inspection finding documented in NRC Inspection Report 50-445/93-07;

50-446/93-07 substantiates that the problem of work request tags attached to

safety-related equipment with an associated closed work request continues to

exist.

On March 11, 1993, you provided a letter, TXX-93131, which documents that, "In

addition to completing the reconciliation walkdown for Unit 1, TU Electric

intends to expand the scope of the walkdowns to include Unit 2 areas.

Anomalies encountered during the execution of these walkdowns will be

l

reconciled with the work order database to assure that an accurate

9304200085 930414

i

PDR

ADOCK 05000445

Y

G

PDR

_ _ _ _ _ _ _ _ _ - _ - .

.

.

.

.

.TU Electric

-2-

representation exists of the remaining work in the field."

You indicated in

your letter that this expanded scope of effort would be completed by May 31,

1993.

The NRC finds this revised commitment to be acceptable; therefore, no

additional response to the enclosed Notice is required.

Based on the results

of future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy

of this letter and its enclosures will be placed in the NRC's Public Document

Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

/

/

l

%

I

l

' A. Bill Beach,

i

ct

'

Division of Reac r Projects

Enclosures:

1.

Appendix A - Notice of Deviation

2.

Appendix B - NRC Inspection Report

50-445/93-12; 50-446/93-12 w/ attachment

cc w/ enclosures:

TV Electric

ATTN:

Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

Engineering Organization

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

GDS Associates, Inc.

l

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

TV Electric

Bethesda Licensing

3 Metro Center Suite 610

Bethesda, Maryland 20814

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

_

_

_ ._

.

,

.

-

-3-

'

,

,

Jorden, Schulte, and Burchette

ATTN: William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

r

Washington, D.C.

20007

-

Newman & Holtzinger, P.C.

l

ATIN: Jack R. Newman, Esq.

1615 L. Street, N.W.

Suite 1000

Washington, D.C.

20036

Texas Department of Licensing & Regulation

,

ATTN:

G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

!

Honorable Dale McPherson

County Judge

i

P.O. Box 851

Glen Rose, Texas 76043

,

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Owen L. Thero, President

i

Quality Technology Company

P.O. Box 408

201 West 3rd

i

Lebo, Kansas 66856-0408

i

l

r

_ _ _ _

-.

.

.

.

.,

..

i

l

i

l.

'

.TU Electric

-4-

APR 1 4 E -

,

I

bcc to DMB (IE01)

!

bcc distrib. by RIV-

J. L. Milhoan

Resident Inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

!

l

DRSS-FIPS

RIV File

l

l

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

l

l

DRS

!

l

l

!

i

!

!

I

l

r

!

i

-,

,

i

i

_

Mi

M:DP//B M [,

,PE:N

C:DRP/f

DD:DRPY hD: DRPH

'

N)d[

Nbb

TR

LAYandh

'TPGwynn

ABBeach3M

d

h/06/93

N/06/93

04/08/93

04/,6/93[

04/lY/93

04/)Y/93

l

i

_ _ _ _ _ _ _ .

.

s

.

TV Electric

-4-

APR I 41993

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

i

-

M_ /

M:DP//B

"M /,, ,PE:N

C:DRP/f

DD:DRPY hD:DRPhf

NM

Nbb

TR N

LAYandk

TPGwynn

ABBeachM

d

N/08/93

N/Ot3/93

04/d3/93

04/,6/93[

04/lY/93

04/Ji//93

_ - - _ - - - - - - _ - - -