J CENTERf0R ENERGY Donald C. Shelton 300 Madison Austnue Vee Presdent Nxlear Toledo. OH 43652-0301 Dams-Sesse (419)249-230]
Docket Number 50-346 License Number NPF-3 Srrial Number 2133 April 12, 1993 C
United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.
20555 Subj ect: Technical Specification 4.4.5.Sa Report of Steam Generator Tube Plugging Gentlemen:
1 This letter is submitted in accordance with the requirements of the Davis-Besse Nuclear Power Station (DBNPS) Unit Number 1, Operating License, Appendix A, Technical Specifications. Technical Specification 4.4.5.5a requires Toledo Edison to report to the Nuclear Regulatory Commission (NRC) the number of tubes plugged in each steam generator 1
(SG) following each inservice inspection of steam generator tubes.
The Eighth Refueling Outage SG tube inservice inspection was completed on March 26, 1993. As a result of the inspection findings, 43 tubes were plugged in SG 1-1 and 321 tubes vere plugged in SG 1-2.
In addition, preventive sleeving was installed in 213 tubes in SG 1-1.
Toledo Edison vill provide the complete results of the steam generator tube inservice inspection in accordance with Technical Specifications 4.4.5.5b and 6.9.1.5b.
This report will include: 1. The number and extent of tubes inspected, 2. The location and percent of vall-thickness penetration for each indication of an imperfection, and
- 3. The identification of tubes plugged or sleeved. This report is submitted on an annual basis and is due March 31, 1994.
190150 1
9304200025 930412 PDR ADOCK 05000346
! h P
{i OperatinD Cornpanies:
L V
Cleveland Electnc liturnincting j
l Toledo Ed: son
Docket Numbar 50-346 g
Liernse Numbar NPF-3 Serial Number 2133 Page 2 Should further information be required, please contact Mr. Robert V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.
Very truly yours,
! l ~~
f(/
MKL/dle L' cc:
A. B. Davis, Regional Administrator, hTC Region III J. B. Hopkins, NRC Senior Project Manager S. Stasek, DB-1 !GC Senior Resident Inspector Utility Radiological Safety Board I